Thirty (30) Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel
ML18291A870
Person / Time
Site: Monticello  Xcel Energy icon.png
Issue date: 10/18/2018
From: Church C
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
L-MT-18-057
Download: ML18291A870 (3)


Text

2807 West County Road 75 Monticello, MN 55362 fl Xcel Energy*

RESP ON SIB LE BY NAT U REID 800.895.4999 xcelenergy.com October 18, 2018 L-MT-18-057 10 CFR 72.212(b)(2)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Independent Spent Fuel Storage Installation Docket No. 72-58 Thirty (30) Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under 10 CFR 72.210, for the Storage of Spent Fuel In accordance with 10 CFR 72.212(b)(2), Northern States Power Company- Minnesota (NSPM),

doing business as Xcel Energy, Inc., is registering the use of two U. S. Nuclear Regulatory Commission (NRC) approved spent fuel storage casks at the Monticello Nuclear Generating Plant (MNGP) Independent Spent Fuel Storage Installation (ISFSI). Registration of a cask is required no later than 30 days after using that spent fuel storage cask to store spent fuel in accordance with 10 CFR 72.212(b)(2). Cask-specific registration information is provided for each NUHOMS-61 BTH dry shielded canister (DSC) in Enclosure 1.

If you have any questions or require additional information, please contact Mr. Stephen Sollom, Regulatory Affairs Sr. Engineer, at (612) 342-8982.

Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

/Jil/JJ. t~

Christopher R. Church Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure( 1) cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC Minnesota Department of Commerce

ENCLOSURE 1 MONTICELLO NUCLEAR GENERATING PLANT

SUMMARY

OF REGISTRATION INFORMATION FOR THE DRY SHIELDED CANISTERS LOADED DURING THE 2018 LOADING CAMPAIGN 1 Page Follows

L-MT-18-057 Page 1 of 1

SUMMARY

OF REGISTRATION INFORMATION FOR THE DRY SHIELDED CANISTERS LOADED DURING THE 2018 LOADING CAMPAIGN HSM Model HSM Date Placed Number Serial into Service Number Cask Certificate of No. 1004 Compliance:

Cask Amendment Amendment 13 Number: Rev. 1 DSC Model NUHOMS-61 BTH Number:

DSC Serial MNP-61 BTH-1-C-2H- NUHOMS HSM- HSM- 9/21/2018 Number: 021 H 11B MNP-61 BTH-1-C-2H- NUHOMS HSM- HSM- 9/27/2018 022 H 12B