L-MT-12-025, Update to Technical Specification Bases and Technical Requirements Manual

From kanterella
Jump to navigation Jump to search
Update to Technical Specification Bases and Technical Requirements Manual
ML12083A250
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/22/2012
From: O'Connor T
Xcel Energy, Northern States Power Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML120830412 List:
References
L-MT-12-025
Download: ML12083A250 (2)


Text

'C3, Xcel EnergyB Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 March 22,2012 L-MT-12-025 10 CFR 50.71(e)

Technical Specification 5.5.9 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Update to Technical Specification Bases and Technical Requirements Manual This letter provides the Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, updates to the Technical Specification (TS) Bases and Technical Requirements Manual (TRM) for the Monticello Nuclear Generating Plant (MNGP). The TS Bases are being provided in accordance with Specification 5.5.9, "Technical Specification (TS) Bases Control Program," on a frequency consistent with 10 CFR 50.71(e). The Technical Requirements Manual (TRM) is being provided in accordance with 10 CFR 50.71(e). Enclosure 1 and Enclosure 2, provide current copies of the entire MNGP TS Bases, Revision 19, and MNGP TRM, Revision 10, respectively.

A description of changes to the TS Bases is provided in Table 2, "Technical Specification Bases Record of Revisions," located near the beginning of Enclosure I. A description of changes to the TRM is provided in Table 2, "TRM Record of Revisions,"

located near the beginning of Enclosure 2.

Summary of Commitments No new commitments or changes to any existing commitments are proposed by this letter.

n presented herein accurately presents changes since the last 27, 201 1, to the date of this letter.

Nuclear Generating Plant Northern States Power Company-Minnesota

Document Control Desk L-MT-12-025 Page 2 Enclosures (2) cc: Administrator, Region Ill, USNRC Resident Inspector, Monticello, USNRC Project Manager, Monticello, USNRC Minnesota Department of Commerce