L-2018-051, 2017 Annual Operating Report
ML18060A081 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 02/22/2018 |
From: | Synder M Florida Power & Light Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-2018-051 | |
Download: ML18060A081 (1) | |
Similar Documents at Saint Lucie | |
---|---|
Category:Annual Operating Report
MONTHYEARL-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023
[Table view]Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2022-062, Annual Radiological Environmental Operating Report for Calendar Year 20212022-04-13013 April 2022 Annual Radiological Environmental Operating Report for Calendar Year 2021 L-2021-082, Submittal of 2020 Annual Environmental Operating Report2021-04-15015 April 2021 Submittal of 2020 Annual Environmental Operating Report L-2021-066, CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2021-04-14014 April 2021 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2020-044, Report of 10 CFR 50.59 Plant Changes2020-04-20020 April 2020 Report of 10 CFR 50.59 Plant Changes L-2020-068, 2019 Annual Environmental Operating Report2020-04-15015 April 2020 2019 Annual Environmental Operating Report L-2020-041, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2020-04-14014 April 2020 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2020-027, 2019 Annual Operating Report2020-01-12012 January 2020 2019 Annual Operating Report L-2019-044, Report of 10 CFR 50.59 Plant Changes2019-03-27027 March 2019 Report of 10 CFR 50.59 Plant Changes L-2019-057, Cf~ 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2019-03-19019 March 2019 Cf~ 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2019-039, 2018 Annual Operating Report2019-02-27027 February 2019 2018 Annual Operating Report L-2018-087, Transmittal of 2017 Annual Environmental Operating Report2018-04-10010 April 2018 Transmittal of 2017 Annual Environmental Operating Report L-2018-063, CFR 50.46 Annual Reporting and 30-day Notification of Changes or Errors in Emergency Core Cooling System Models or Applications2018-03-26026 March 2018 CFR 50.46 Annual Reporting and 30-day Notification of Changes or Errors in Emergency Core Cooling System Models or Applications L-2018-051, 2017 Annual Operating Report2018-02-22022 February 2018 2017 Annual Operating Report L-2017-071, Submittal of Report of 10 CFR 50.59 Plant Changes, Tests and Experiments2017-05-0404 May 2017 Submittal of Report of 10 CFR 50.59 Plant Changes, Tests and Experiments L-2017-056, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CPR 50.46 Annual Report2017-03-27027 March 2017 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CPR 50.46 Annual Report L-2017-016, Transmittal of 2016 Annual Operating Report2017-02-0707 February 2017 Transmittal of 2016 Annual Operating Report L-2016-049, Annual Operating Report for St. Lucie 1 and 2, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors2016-03-0202 March 2016 Annual Operating Report for St. Lucie 1 and 2, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors L-2014-095, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2014-03-31031 March 2014 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report L-2004-050, Cy 2003 Corrections to Annual Radioactive Effluent Release Report (L-2004-050 Dated February 27, 2004) Section 10. Process Control Program (PCP) Revisions, Page 6 and AP 0520025 Revision 13A with mark-up2014-02-27027 February 2014 Cy 2003 Corrections to Annual Radioactive Effluent Release Report (L-2004-050 Dated February 27, 2004) Section 10. Process Control Program (PCP) Revisions, Page 6 and AP 0520025 Revision 13A with mark-up L-2014-048, Annual Operating Report2014-02-12012 February 2014 Annual Operating Report L-2013-012, Annual Operating Report2013-01-0909 January 2013 Annual Operating Report L-2012-361, Report of 10 CFR 50.59 Plant Changes2012-10-0101 October 2012 Report of 10 CFR 50.59 Plant Changes L-2012-170, Annual Environmental Operating Report2012-04-24024 April 2012 Annual Environmental Operating Report L-2012-080, Annual Radioactive Effluent Release Report January 1, 2011 Through December 31, 2011, C-200, Offsite Dose Calculation Manual Revision 35.2012-03-0101 March 2012 Annual Radioactive Effluent Release Report January 1, 2011 Through December 31, 2011, C-200, Offsite Dose Calculation Manual Revision 35. ML12068A2072012-03-0101 March 2012 Annual Radioactive Effluent Release Report January 1, 2011 Through December 31, 2011 L-2012-073, 2011 Annual Operating Report2012-02-21021 February 2012 2011 Annual Operating Report L-2011-147, 2010 Annual Environmental Operating Report2011-04-20020 April 2011 2010 Annual Environmental Operating Report L-2011-116, Annual Radiological Environmental Operating Report for Calendar Year 20102011-04-19019 April 2011 Annual Radiological Environmental Operating Report for Calendar Year 2010 ML1109701462011-03-30030 March 2011 Units I and 2, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report L-2010-058, Annual Radiological Environmental Operating Report for Calendar Year 20092010-03-22022 March 2010 Annual Radiological Environmental Operating Report for Calendar Year 2009 ML1006106442010-02-25025 February 2010 St. Lucie, Units 1 and 2, Combined Annual Radioactive Effluent Release Report for the Period January 1, 2009 Through December 31, 2009 L-2010-033, St. Lucie, Units 1 and 2, Combined Annual Radioactive Effluent Release Report for the Period January 1, 2009 Through December 31, 20092010-02-25025 February 2010 St. Lucie, Units 1 and 2, Combined Annual Radioactive Effluent Release Report for the Period January 1, 2009 Through December 31, 2009 L-2009-090, Annual Radiological Environmental Operating Report for Calendar Year 20082009-04-13013 April 2009 Annual Radiological Environmental Operating Report for Calendar Year 2008 L-2009-061, Submittal of Annual Report Acceptance Criteria for Emergency Core Cooling System Analyses for Light Water Nuclear Power Reactors2009-03-11011 March 2009 Submittal of Annual Report Acceptance Criteria for Emergency Core Cooling System Analyses for Light Water Nuclear Power Reactors L-2008-169, Amended Annual Radiological Environmental Operating Report for Calendar Year 20072008-07-28028 July 2008 Amended Annual Radiological Environmental Operating Report for Calendar Year 2007 L-2008-046, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2008-03-18018 March 2008 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report L-2007-074, 2006 Annual Environmental Operating Report2007-04-25025 April 2007 2006 Annual Environmental Operating Report L-2007-021, Annual Operating Report2007-02-21021 February 2007 Annual Operating Report L-2006-263, Report of 10 CFR 50.59 Plant Changes During Period of February 15, 2005 Through June 12, 20062006-12-0505 December 2006 Report of 10 CFR 50.59 Plant Changes During Period of February 15, 2005 Through June 12, 2006 ML0612501642006-04-27027 April 2006 St. Lucie, Units 1 & 2 - 2005 Annual Environmental Operating Report L-2006-098, Annual Radiological Environmental Operating Report for Calendar Year 20052006-04-18018 April 2006 Annual Radiological Environmental Operating Report for Calendar Year 2005 L-2005-095, Annual Environmental Operating Report2005-04-26026 April 2005 Annual Environmental Operating Report L-2005-069, Annual Radiological Environmental Operating Report for Calendar Year 20042005-03-31031 March 2005 Annual Radiological Environmental Operating Report for Calendar Year 2004 L-2005-038, 2004 Annual Radioactive Effluent Release Report2005-02-28028 February 2005 2004 Annual Radioactive Effluent Release Report L-2005-037, Letter Transmitting, St. Lucie Units 1 and 2, 2004 Annual Overating Report2005-02-28028 February 2005 Letter Transmitting, St. Lucie Units 1 and 2, 2004 Annual Overating Report L-2004-081, Annual Radiological Environmental Operating Report2004-04-13013 April 2004 Annual Radiological Environmental Operating Report L-2004-070, Annual Environmental Operating Report2004-04-13013 April 2004 Annual Environmental Operating Report L-2004-012, Transmittal of the 2003 Annual Operating Report2004-02-12012 February 2004 Transmittal of the 2003 Annual Operating Report 2023-09-20 Category:Letter type:L MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024
[Table view]Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08 |
Text
FEB 2 2 2018 L-2018-051 10 CFR 50.36 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Rt';: St. Lucie Urtj.ts 1 and 2 Docket Nos. 50-335 and 50-389 2017 Annual OBerating Report Pursuant to Technical Specification 6.9.1.4, this letter transmits the data required for the 2017 Annual Operating Report for St. Lucie Units 1 and 2.
In accordan,ce with Technical Specification 6.9.1.5, the primary coolant specific activity did not exceed the litnits of Technical Specification 3.4.8 for eith(;!r Unit 1 or U~t 2 during 2017.
This data inclutles the activities on a calendar year basis for b~th units.
Please contact us should there by any questions regarding this infoqnation.
Sincerely, Michael J. Snyder Licensing Manager St. Lucie Plant MJS/spt Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957