L-2005-037, Letter Transmitting, St. Lucie Units 1 and 2, 2004 Annual Overating Report

From kanterella
Jump to navigation Jump to search
Letter Transmitting, St. Lucie Units 1 and 2, 2004 Annual Overating Report
ML050660020
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/28/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2005-037
Download: ML050660020 (4)


Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 0 February 28, 2005 FPL L-2005-037 10 CFR 50.36 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 2004 Annual Overating Report Pursuant to Technical Specification 6.9.1.4, this letter transmits the 2004 Annual Operating Report for St. Lucie Units I and 2. The report covers activities on a calendar year basis for both units.

Attachment 1 Man-Rem Report required by Technical Specification 6.9.1.5 Attachment 2 Primary Chemistry information required by Technical Specification 6.9.1.5 Please contact us should there be any questions regarding this information.

Very truly yours, William Jifferson,Jr.

Vice President St. Lucie Plant WJ/spt Attachments Ao an FPL Group company

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2005-037 Page 1 TECHNICAL SPECIFICATION 6.9.1.5 ST. LUCIE UNITS I AND 2 2004 MAN-REM REPORT

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2005-037 Page 2 Standard Format for Reporting Number of Personnel &Man-Rem For Work and Job Functions End of Year Report 2004 Number of Personnel

> 100 mrem Total man-rem Work and Job Function Station Utility Contractor Station Utility Contractor ROUTINE OPERATIONS AND SURVEILLA NCE MAINTENANCE AND CONSTRUCTION 10 2 5 3.395 0.706 3.445 OPERATIONS 41 2 0 8.322 0.620 0.839 HEALTH PHYSICS 17 8 51 5.287 1.789 14.325 SUPERVISORY o 0 0 0.115 0.010 0.011 ENGINEERING o 0 0 0.706 0.188 0.023 ROUTINE PLANT MAINTENANCE MAINTENANCE AND CONSTRUCTION 48 a 147 14.708 2.362 48.949 OPERATIONS 0 2 0 0.77B 0.277 0.021 HEALTH PHYSICS 15 0 0 3.046 0.114 0.843 SUPERVISORY 0 0 0 0.053 0.000 0.001 ENGINEERING 2 0 0 0.718 0.040 0.008 INSERVICE INSPECTION MAINTENANCE AND CONSTRUCTION 0 0 115 0.16d 0.011 32.191 OPERATIONS 0 0 0 0.255 0.169 0.016 HEALTH PHYSICS 0 0 6 0.137 0.004 2.146 SUPERVISORY 0 o 0 0.003 0.002 0.018 ENGINEERING 1 1 0 0.38e 0.145 0.007 SPECIAL PLANT MAINTENANCE (Shutdown CooilngfCCW, Hanger Modifications. Additional Spent Fuel Rack, RCP Oil Collection Modification. Prep for Rx Head, Pressurizer Replacement MAINTENANCE AND CONSTRUCTION 0 0 22 0.027 0.018 8.437 OPERATIONS 0 0 0 0.001 0.014 0.006 HEALTH PHYSICS 0 0 0 0.027 0.000 0.138 SUPERVISORY 0 0 0 0.000 0.000 0.000 ENGINEERING 0 0 0 0.010 0.015 0.007 WASTE PROCESSING MAINTENANCE AND CONSTRUCTION 0 0 0 0.534 0.001 0.420 OPERATIONS 0 0 0 0.227 0.000 0.000 HEALTH PHYSICS 0 1 0.835 0.066 0.752 0

SUPERVISORY 0 0 0.000 0.000 0.000 0

ENGINEERING 0 0 0.007 0.000 0.000 REFUELING MAINTENANCE AND CONSTRUCTION 3 2 33 1.166 0.579 17.586 OPERATIONS 2 I 0 1.051 0.409 0.000 HEALTH PHYSICS 0 0 0 0.056 0.022 0.353 SUPERVISORY 0 0 0 0.019 0.000 0.000 ENGINEERING 2 0 0.335 0.137 0.000 Totals MAINTENANCE AND CONSTRUCTION 59 12 322 19.996 3.677 111.008 OPERATIONS 43 5 0 10.632 1.4$ 0.882 HEALTH PHYSICS 33 B 68 9.388 1.995 18.557 SUPERVISORY 0 0 0 0.190 0.012 0.030 ENGINEERING 5 2 0 2.162 0.526 0.045 Grand Totals 140 27 380 42.368 7.699 130.522 I The total radiation exposure of the above personnel constitutes 100% of the site's exposure for the year.

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 L-2005-037 Page 1 TECHNICAL SPECIFICATION 6.9.1.5 AND 3.4.8 ST. LUCIE UNITS I AND 2 CHEMISTRY RESULTS In accordance with Technical Specification 6.9.1.5, the primary coolant specific activity did not exceed the limits of Technical Specification 3.4.8 during 2004.