L-2004-012, Transmittal of the 2003 Annual Operating Report

From kanterella
Jump to navigation Jump to search
Transmittal of the 2003 Annual Operating Report
ML040560458
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/12/2004
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2004-012
Download: ML040560458 (4)


Text

Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 0 February 12, 2004 FPL L-2004-012 10 CFR 50.36 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 2003 Annual ODerating Report Pursuant to Technical Specification 6.9.1.4, this letter transmits the 2003 Annual Operating Report for St. Lucie Units 1 and 2. The report covers activities on a calendar year basis for both units.

Section 1 Man-Rem Report required by Technical Specification 6.9.1.5 Section 2 Primary Chemistry information required by Technical Specification 6.9.1.5 Please contact us should there be any questions regarding this information.

VicPrdn St. Lucie Plant WJ/spt Attachments Yo)C I an FPL Group company

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2004-012 SECTION 1 TECHNICAL SPECIFICATION 6.9.1.5 ST. LUCIE UNITS I AND 2 2003 MAN-REM REPORT

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 L-2004-012 Florida Power &Lght Company St Luci Plant -2003 Standard Fonrat For Reporting Number Of Personnel & Man-Rom For Work And Job Functions Number of Personnel > 100 mrom Total Man Rem Work And Job Function Station Utility Contract Station Utility Contract Reactor Operations and Surveillance Maintenance & Construction 2 0 4 001.200 000.098 001.583 Operations 6 2 0 003.381 000.04 000.231 Health Physics 7 3 51 003.040 000.681 010.370 Supervisory 0 0 0 000.101 000.077 000.012 Enginering 0 0 0 000.316 000192 000.014 Routine Maintenance Maintenance & Construction 15 1 62 007.270 001.096 022497 Operations 0 0 0 000.434 000.153 000.005 Health Physics 6 0 2 001.701 000.008 000.373 Supervisory 0 0 0 000.007 000.015 000.009 Engineering 3 0 0 000.903 000.177 000.015 Inservice Inspection Maintenance & Construction 0 0 93 000.122 000.041 026.A55 Operations 0 0 0 000.137 000.152 000.005 Health Physics 0 0 10 000.103 000.001 003.033 Supervisory 0 0 0 000.000 000.000 000.001 Engineering 0 0 0 000.145 000.128 000.013 Special Maintenance (Unit 2 Rx Head Alloy 600 repairs and Unit 2 Hot Leg Nozzle Alloy 600 RepaIrs)

Maintenance &Construction 3 0 S1 001.357 000.043 039.332 Operations 0 0 0 000.000 000.026 000.000 Health Physics 0 0 4 000.000 000.000 000.953 Supervisory 0 0 0 000.071 000.012 000.001 Engineering 0 0 0 000.033 000.010 000.026 Waste Processing Maintenance & Construction 0 0 0 000.160 000.005 000.015 Operations 0 0 0 000.031 000.00 000.000 Health Physics 0 0 0 W00481 000.012 000.626 Supervisory 0 0 0 000.000 000.000 000.000 Engineering 0 0 0 000.000 000.000 000.000 Refueling Maintenance & Construction 4 2 31 000.914 001.214 017.837 Operations 1 1 1 001.375 000.225 000.407 Health Physics 0 0 2 000.015 000.011 000.933 Supervisory 0 0 0 000.023 000.001 000.000 Engineering 2 0 0 001.124 000.138 000.001 Totals Maintenance & Construction 24 3 281 011.023 002497 108.094 Operations 6 3 1 005.358 001.260 00.648 Health Physics 13 3 69 0056340 000.713 016.788 Supervisory 0 0 0 000.202 000.105 000.023 Engineering 6 0 0 002.521 000.645 000.069 Grand Totals 48 9 361 024.444 006.220 125.622

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 L-2004-01 2 SECTION 2 TECHNICAL SPECIFICATION 6.9.1.5 AND 3.4.8 ST. LUCIE UNITS 1 AND 2 CHEMISTRY RESULTS In accordance with Technical Specification 6.9.1.5, the primary coolant specific activity did not exceed the limits of Technical Specification 3.4.8 during 2003.