MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
0 Florida Power &Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 FPL September 8, 2011 L-2011-367 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: St. Lucie Plant Unit 1 Docket No. 50-335 Renewed Facility Operating License No. DPR-67 Response to NRC Containment and Ventilation Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request
References:
(1) R. L. Anderson (FPL) to U.S. Nuclear Regulatory Commission (L-2010-259),
"License Amendment Request for Extended Power Uprate," November 22, 2010, Accession No. ML103560419.
(2) Email from T. Orf (NRC) to C. Wasik (FPL), "St. Lucie 1 EPU Draft RAIs (3r'd Round) - Containment and Ventilation (SCVB)," August 18, 2011.
By letter L-2010-259 dated November 22, 2010 [Reference 1], Florida Power & Light Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lucie Unit 1 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. This represents an approximate increase of 11.85% and is therefore considered an extended power uprate (EPU).
By email from the NRC Project Manager dated August 18, 2011 [Reference 2],
additional information related to containment considerations was requested by the NRC staff in the Containment and Ventilation Branch (SCVB) to support their review of the EPU LAR. The request for additional information (RAI) identified three questions. The response to these RAIs is provided in Attachment 1 to this letter. In accordance with 10 CFR 50.91 (b)(1), a copy of this letter is being forwarded to the designated State of Florida official.
This submittal does not alter the significant hazards consideration or environmental assessment previously submitted by FPL letter L-2010-259 [Reference 1].
an FPL Group company
L-2011-367 Page 2 of 2 This submittal contains no new commitments and no revisions to existing commitments.
Should you have any questions regarding this submittal, please contact Mr. Christopher Wasik, St. Lucie Extended Power Uprate LAR Project Manager, at 772-467-7138.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.
Executed on 60_ -Act. I Very truly yours, Richard L. Ander - -
Site Vice President St. Lucie Plant Attachment cc: Mr. William Passetti, Florida Department of Health
L-2011-367 Attachment 1 Page 1 of 4 Response to Request for Additional Information The following information is provided by Florida Power & Light (FPL) in response to the U. S.
Nuclear Regulatory Commission's (NRC) Request for Additional Information (RAI). This information was requested to support the Extended Power Uprate (EPU) License Amendment Request (LAR) for St. Lucie Unit 1 that was submitted to the NRC by FPL via letter (L-2010-259) dated November 22, 2010 (Accession Number ML103560419).
In an email dated August 18, 2011 from NRC (T. Orf) to FPL (C. Wasik), "St. Lucie 1 EPU Draft RAIs (3 rd Round) - Containment and Ventilation (SCVB)," the NRC staff requested additional information regarding FPL's request to implement the EPU. The RAI consisted of three (3) questions from the NRC's Containment and Ventilation Branch (SCVB). These three RAI questions and the FPL responses are documented below.
SCVB-1 9:
Section 2.6.1.2.2.2 states "The peak pressure case that produces the highest containment temperature is used for the Equipment Qualification (EQ) case."
(a) Please explain why the peak pressure case was chosen rather than a case which gives the highest temperature regardless of the pressure.
(b) Section 2.6.1.2.2.3 states that the limiting peak pressure case is at 100.3-percent power. Please explain why the initial pressure was chosen to be the minimum containment pressure (first bullet in Section 2.6.1.2.2.2) to delay the reactor trip.
Response
The objective of a containment Main Steam Line Break (MSLB) analysis is to consider a range of initial power levels and single failures so the peak pressure can be identified. Twelve (12) MSLB cases were performed for the EPU. Each case identifies its peak pressure and temperature. LR Section 2.6.1.2.2.2 should be understood as, "The case that produces the highest containment temperature is used for the Equipment Qualification (EQ) case."
(a) The MSLB case which produces the highest containment temperature (100.3% power MSLB with the failure of a containment spray pump) was chosen for the EQ case.
(b) The initial containment pressure is maximum (15.51 psia) for all cases except the one EQ case. The EQ case assumes a minimum containment pressure, which will delay the reactor trip. Delaying the reactor trip results in more energy being added to the reactor coolant system (RCS). The RCS energy is transferred to the steam generator resulting in a more limiting containment temperature.
L-2011-367 Attachment 1 Page 2 of 4 SCVB-20:
Section 2.6.1.2.2.2 claims to list the differences between the EQ methodology and the peak pressure methodology, whereas only the EQ methodology is described in the three bullets.
Provide a table listing the differences and conservatisms in the EPU peak pressure methodology and the EQ methodology. Provide separate tables listing the differences in the current licensing basis (CLB) and the EPU basis for the (a) peak pressure methodology and (b) EQ methodology, and justify the differences between the CLB and the EPU basis for both methodologies.
Response
The following table lists the differences between the peak pressure methodology and the EQ methodology.
EPU MSLB Peak Pressure and EQ Differences and Conservatisms EPU MSLB Peak Pressure and EQ Differences Peak Pressure Equipment Qualification Justification A higher initial pressure will result in a Maximum Initial Minimum Initial Containment more limiting containment peak pressure.
Containment Pressure Pressure A lower initial pressure will result in a more limiting containment peak temperature for EQ cases.
This allows the calculation code to Superheating upon steam continue to heat the steam in contact with generator (SG) U-tube Superheating upon SG U-tube uncovered U-tubes instead of only uncovery not considered uncovery considered producing steam. The effect of superheat is required by IE Information Notice No.
84-90 for EQ cases.
NUREG-0588 Rev. 1, Interim Staff No re-evaporation of Position on Environmental Qualification of condensation from the 8% re-evaporation of Safety-Related Electrical Equipment, heat sinks condensation from the heat sinks Appendix B, Section 1.b states that credit for as much as 8% evaporation can be allowed when superheat exists.
The following table provides conservative assumptions that are used for both the peak pressure methodology and EQ methodology.
L-2011-367 Attachment 1 Page 3 of 4 EPU MSLB Peak Pressure and EQ Conservatisms Conservatisms Justification Metal expansion due to pressure and temperature Results in more steam released from the SG as well as additional energy to be increases the RCS and transferred from the primary to secondary systems.
SG volumes by 2%
Maximum RCS flow sses the maximum possible heat transfer from primary to secondary Allows systems.
No safety injection (SI) SI would decrease the primary system heat.
No steam generator tube plugging (SGTP) SGTP would reduce the primary to secondary heat transfer.
Initially all rods are fully This maximizes the time required to reduce core power.
out All main feedwater flow is assumed to be delivered Results in twice as much feedwater flow to ruptured steam generator.
to the ruptured steam generator The EPU analysis follows the same peak pressure and EQ methodologies used in the CLB. The EPU analysis does limit the return to power to a value that bounds the maximum value identified in the safety analysis MSLB, because the conservative assumption to not credit safety injection can allow the restart power to greatly exceed the maximum value.
The following table lists some of the more significant differences between input data used in the CLB and the EPU peak pressure analyses.
Summary of CLB and EPU MSLB Peak Pressure Differences EPU Peak CLIB Peak CLB Peak EPU Peak Parameter Justification Pressure Pressure The uprate will increase the current power to Core Power (MWt) 2754 3030 3020 MWt. Including an uncertainty of 0.3%
increases the core power to 3030 MWt.
The containment initial pressure for EPU is Initial Pressure (psia) 17.1 15.51 reduced as indicated in the proposed change to Technical Specification 3.6.1.4.
A smaller containment volume will result in more Cota n l2.506x10' 2.498x10 limiting containment peak pressure and temperature results.
This reduces the heat transfer area for the Nominus 2% inactive heat sinks in containment to remove heat from the steam releases.
L-2011-367 Attachment 1 Page 4 of 4 The following table lists some of the more significant differences between input data used in the CLB and the EPU peak temperature analyses.
Summary of CLB and EPU MSLB EQ Differences Parameter CLB EQ EPU EQ Justification The uprate will increase the current power to Core Power (MWt) 2754 3030 3020 MWt. Including an uncertainty of 0'3%
increases the core power to 3030 MWt.
A lower initial pressure will result in a more Initial Pressure (psia) 14.0 13.69 limiting containment peak temperature for EQ cases.
A smaller containment volume will result in Containment Volume (ft3) 2.506x10 6 2.498x10 6 more limiting containment peak pressure and temperature results.
This reduces the heat transfer area for the Heat Sink Area (ft) Nominal minus 2% inactive heat sinks in containment to remove heat from the steam releases.
SCVB-21:
Section 2.6.1.2.2.2 does not state whether the three single failure scenarios at 0-percent, 25-percent, 50-percent, 75-percent, and full hot power were analyzed with or without offsite power available. Please clarify.
Response
Loss of offsite power (LOOP) results in a loss of RCS flow, which greatly reduces the rate of energy transfer from the RCS to the secondary side. This results in lower energy release to containment, which reduces the containment pressure/temperature response. This was confirmed by running the limiting case for both offsite power available and LOOP. For conservatism, all cases (peak pressure and EQ) assume offsite power is available.