L-13-012, FENOC - Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

From kanterella
(Redirected from L-13-012)
Jump to navigation Jump to search
FENOC - Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML13025A277
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 01/25/2013
From: Belcher S
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-13-012
Download: ML13025A277 (2)


Text

FENOC 76 South Main Street

"*rffi Akron. Ohio 44308 Samuel L. Belcher Senior Vice President and Chief Operating Officer January25,2013 L-13-012 10cFR50.54(0 ATTN: DocumentControlDesk U.S.NuclearRegulatory Commission 11555Rockville Pike Rockville, MD 20852

SUBJECT:

BeaverValleyPowerStation,UnitNos.1 and2 DocketNo.50-334,LicenseNo.DPR-66 DocketNo.50-412,LicenseNo.NPF-73 Davis-Besse NuclearPowerStation DocketNo.50-346,LicenseNo.NPF-3 PerryNuclearPowerPlant DocketNo.50-440,LicenseNo.NPF-58 FENOCResponse to NRCRequestfor lnformation Pursuant to 10 CFR50.54(f)

Reqardinq the FloodinoAspectsof Recommendation 2.1 of the Near-Term TaskForce (NTTfl Reviewof Insiqhtsfromthe Fukushima Dai-ichiAccident On March12,2012,the NuclearRegulatory Commission (NRC)issueda lettertitled, "Requestfor Information Pursuantto Title10 of the Codeof FederalRegulations 50.54(0Regarding Recommendations 2.1,2.3,and9.3of the Near-Term TaskForce Reviewof Insightsfromthe Fukushima Dai-ichiAccident," to all powerreactorlicensees and holdersof construction permits in activeor deferredstatus.Enclosure 2 of the 10 CFR50.54(f)lettercontainsspecificrequested actions,requested information, and requiredresponses associated withRecommendation 2.1 for flooding.One of the requiredresponses directslicensees to submitan approachfor developing an Integrated Assessment Report,including criteriafor identifying within60 vulnerabilities, daysof the dateof the NRC'sissuance of guidance on implementation details.This letterprovidesFENOC's60-dayresponseto the 10 CFR50.54(f)letterforBeaver ValleyPowerStation,UnitNos.1 and2 (BVPS),Davis-Besse NuclearPowerStation (DBNPS), andPerryNuclearPowerPlant(PNPP).

BeaverValleyPowerStation,UnitNos.1 and2 Davis-Besse NuclearPowerStation PerryNuclearPowerPlant L-13-012 Page2 On November 30,2012,the NRCissuedtheJapanLessons-Learned Project Directorate, JLD-lSG-2O12-05, "Guidance for Performingthe IntegratedAssessment for ExternalFlooding, InterimStaffGuidance," Revision 0. FENOCintendsto usethe JLD-ISG-2012-05, Revision 0, guidance as the approach for developing the NTTF2.1 floodingIntegrated Assessment Reportfor thoseplantsitesin our nucleargenerating fleetwherethe reevaluated floodinghazardis not boundedby the currentdesignbasis floodevaluation.

FENOCalsointendsto usethe guidance providedby NRCletter,"Trigger Conditions for Performing an Integrated Assessment and DueDatefor Response," dated December3, 2012,regarding the triggerconditionsandscopeof any required IntegratedAssessment.

Thereare no regulatory commitments containedin thisletter.lf thereare anyquestions or if additionalinformation is required,pleasecontactMr.ThomasA. Lentz,Manager-FleetLicensing, at 330-315-6810.

I declareunderpenaltyof perjurythatthe foregoingis trueand correct.Executedon January_L{,2013.

SamuelL. Belcher cc: Director,Officeof NuclearReactorRegulation (NRR)

NRCRegionI Administrator NRCRegionlll Administrator NRCResidentInspector (BVPS)

NRCResidentInspector (DBNPS)

NRCResidentInspector (PNPP)

NRRProjectManager(BVPS)

NRRProjectManager(DBNPS)

NRRProjectManager(PNPP)

DirectorBRP/DEP SiteBRP/DEPRepresentative UtilityRadiologicalSafetyBoard