L-09-180, Scheduling of CY2011 Initial Operator License Examinations

From kanterella
(Redirected from L-09-180)
Jump to navigation Jump to search
Scheduling of CY2011 Initial Operator License Examinations
ML092180667
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/30/2009
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-09-180
Download: ML092180667 (1)


Text

FENOC Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear OperatingCompany Perry, Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 July 30, 2009 L-09-180 10 CFR 55 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Scheduling of CY2011 Initial Operator License Examinations The purpose of this letter is to advise the NRC that the initial operator license examination proposed in letter L-08-238, dated July 28, 2008, for January 2011 is no longer needed.and may be deleted from the NRC's examination schedule for licensees.

Based onthe current operator license class schedule at the Perry Nuclear Power Plant, it will not be necessary to, administer an NR,C examination. at that time.

There are.no regulatory commitments contained in this letter. If you have questions or requieeadditionalififormation; please contact Me. AintI*ony Mueller'Jr., Manager, Perry,.

Training Sectionat'(440) 280-5535..

Sincerely, cc:. '.Mr.Hironori Peterson, Chief,, NRC Region III Operations Branch.

": Kweiser, NRC Region IIl,ooeratoir Licensing Section

.Ms."an '. .

Mr." v"Mi.ichae Bielby1,'NRC' Re gion Ill, Operator Licensing Section Mr. John Munro, .Chief, Operator. Licensing and Human Performance Branch, NRR

- ~.NRC ,ProjectManager.'. , --

NRCC Resident e Inspector I .... , , . .

.. ,-.