L-09-180, Scheduling of CY2011 Initial Operator License Examinations
| ML092180667 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/30/2009 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-09-180 | |
| Download: ML092180667 (1) | |
Text
FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 Mark B. Bezilla Vice President 440-280-5382 Fax: 440-280-8029 July 30, 2009 L-09-180 10 CFR 55 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Scheduling of CY2011 Initial Operator License Examinations The purpose of this letter is to advise the NRC that the initial operator license examination proposed in letter L-08-238, dated July 28, 2008, for January 2011 is no longer needed.and may be deleted from the NRC's examination schedule for licensees.
Based onthe current operator license class schedule at the Perry Nuclear Power Plant, it will not be necessary to, administer an NR,C examination. at that time.
There are.no regulatory commitments contained in this letter. If you have questions or requieeadditionalififormation; please contact Me. AintI*ony Mueller'Jr., Manager, Perry,.
Training Sectionat'(440) 280-5535..
Sincerely, cc:. '.Mr. Hironori Peterson, Chief,, NRC Region III Operations Branch.
Ms."an Kweiser, NRC Region IIl,ooeratoir Licensing Section Mr." v"Mi.ichae Bielby1,'NRC' Re gion Ill, Operator Licensing Section Mr. John Munro,.Chief, Operator. Licensing and Human Performance Branch, NRR
~.NRC,ProjectManager.'.
NRCC Resident Inspector e
I
,-.