JAFP-12-0129, James A. FitzPatrick Nuclear Power Plant, Core Operating Limits Report, Revision 26 (Cycle 21)

From kanterella
Jump to navigation Jump to search
James A. FitzPatrick Nuclear Power Plant, Core Operating Limits Report, Revision 26 (Cycle 21)
ML12293A164
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/18/2012
From: Adner C
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML12293A200 List:
References
JAFP-12-0129
Download: ML12293A164 (2)


Text

Proprietary Information Withhold Per 10 CFR 2.390*


..*._--_..*__._...__..__.JAFP-12-0129 October 18, 2012 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.James A.FitzPatrick NPP P.O.Box 110 Lycoming, NY 13093 Tp.1::\1S-:W?-::\MO

---_..-------_.---Chris Adner licensing Manager-JAF

Subject:

Core Operating Limits Report, Revision 26 (Cycle 21)James A.FitzPatrick Nuclear Power Plant Docket No.50-333 License No.DPR-059

Dear Sir or Madam,

Enclosed is Revision 26 to the James A.FitzPatrick (JAF)CoreOperatingLimits Report (COLR).This revision incorporates changes as a result of reload analysis completed by Global Nuclear Fuel (GNF)for Cycle 21 operations and is submitted in accordance with JAF Technical Specifications (TS)5.6.5.The enclosed documentation contains proprietary information.

GNF, as the owner of the proprietary information, has executed the enclosed affidavit, which identifies that the information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure.

Entergy hereby requests that the enclosed proprietary information be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17.A non-proprietary version of the documentation is also provided.There are no commitments contained in this report.Questions concerning this report may be addressed to Mr.William Drews, (315)349-6562.Very trulyy,:;)

Chris Adner Licensing Manager CAijo

Enclosure:

cc: next page 1.Core Operating Limits Report, Revision 26 (Proprietary) 2.Core Operating Limits Report, Revision 26 (Non-Proprietary) to this letter contains Proprietary Information that should be withheld from public disclosure per 10 CFR 2.390.When separated from Enclosure 1 there are no applicable withholding criteria.

Proprietary Information Withhold Per 10 CFR 2.390 JAFP-12-0129 Page 2 of 2 Enclosure 1 to this letter contains Proprietary Information that should be withheld from public disclosure per 10 CFR 2.390. When separated from Enclosure 1 there are no applicable

withholding criteria.

cc: (w/out enclosure 1)

Regional Administrator, Region I U. S. Nuclear Regulatory Commission

2100 Renaissance Boulevard, Suite 100

King of Prussia, PA 19406-2713 Resident Inspector's Office U.S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant

P.O. Box 136

Lycoming, NY 13093 Mr. Mohan Thadani Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2A

Washington, DC 20555-0001 Ms. Bridget Frymire New York State Department of Public Service

3 Empire State Plaza, 10 th Floor Albany, NY 12223 Mr. Francis J. Murray Jr., President NYSERDA 17 Columbia Circle

Albany, NY 12203-6399

Document Components 00 Cover Letter, JAFP-12-0129

01 Core Operating Limits Report, Revision 26 (Proprietary)

02 Core Operating Limits Report, Revision 26 (Non-Proprietary)