JAFP-11-0079, Corrections to the 2010 Annual Radioactive Effluent Release Report for James A. FitzPatrick Nuclear Power Plant

From kanterella
Jump to navigation Jump to search
Corrections to the 2010 Annual Radioactive Effluent Release Report for James A. FitzPatrick Nuclear Power Plant
ML111670162
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/16/2011
From: Eugene Dorman
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-11-0079
Download: ML111670162 (6)


Text

  • ~Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Eugene Dorman Acting Licensing Manager - JAF NPP JAFP-11-0079 June 16, 2011 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Corrections to the 2010 Annual Radioactive Effluent Release Report Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59

Reference:

1. Entergy Letter, 2010 Annual Radioactive Effluent Release Report, JAFP-11-0055, dated April 29, 2011.

Dear Sir or Madam:

to this letter provides a revision to the 2010 James A. FitzPatrick Nuclear Power Plant's (JAF) Annual Radioactive Effluent Release Reports. The Carbon-14 Gaseous Effluents data was incomplete in the original submittal [Reference 1] in Attachment 10. The replacement pages also correct a typographical error in Table 1A. includes a corrected Table 1A and Attachment NO.1 O. The format used for the effluent data is outlined in Appendix B of Regulatory Guide 1.21, Revision 1. Distribution is in accordance with Regulatory Guide 10.1, Revision 4.

There are no commitments contained in this letter.

If you have any questions concerning the enclosed report corrections, please contact Laurie Rayle, Chemistry Manager, at (315) 349-6748.

Sincerely,

-b-tJ a:-a41~

Eugene Dorman Acting Licensing Manager - JAF ED/LR/mh

Enclosure:

Corrected Tables cc: next page

JAFP-11-0079 Page 2 of 2 cc: Mr. William Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Office of the Resident Inspector James A. FitzPatrick Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Bhalchandra Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2A Washington, DC 20555-0001 D. Sherman (ANI Library)

P. Merges (NYSDEC)

B. Sullivan (JAF)

C. Faison (ENOC/WPO)

J. McCann (ENOC/WPO)

W. Hamblin (CHEM/JAF)

K. Stoffle (NMP)

J. Furfaro (ENV/JAF)

Document Components:

001 JAFP-11-0079 with Enclosure

JAFP-11-0079 ENCLOSURE 1 Corrected Tables (3 Pages with Index)

JAFP-11-0079 Enclosure 1 Index 2010 Table 1A, Gaseous Effluents - Summation of All Releases 1 Page 2010 Attachment No. 10, Gaseous Effluents - Carbon 14 1 Page Page 1 of 1

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT JANUARY 2010 - DECEMBER 2010 TABLE 1A GASEOUS EFFLUENTS - SUMMATION OF ALL RELEASES EST TOTAL UNIT QTR 1 QTR 2 QTR 3 QTR 4 ERROR %

A. FISSION AND ACTIVATION GASES

1. Total Release Ci 1.44E+01 2.52E+01 4.77E+01 1.45E+01 2.50E+01
2. Average release rate for period Ci/sec 1.83E+00 3.20E+00 6.00E+00 1.82E+00
3. Applicable ODCM Limit  % * * *
1. Total Iodine-131 Ci 1.03E-04 1.14E-04 1.04E-04 2.50E-05 2.50E+01
2. Average release rate for period Ci/sec 1.32E-05 1.45E-05 1.31E-05 3.15E-06
3. Applicable ODCM Limit  % * * *
  • C. PARTICULATES
1. Particulates with half-lives >8 days Ci 4.11E-06 1.34E-05 3.30E-05 3.37E-05 3.60E+01
2. Average release rate for period Ci/sec 5.23E-07 1.70E-06 4.15E-06 4.24E-06
3. Applicable ODCM Limit  % * * * *
4. Gross alpha radioactivity Ci 2.88E-07 4.29E-07 5.34E-07 4.34E-07 2.50E+01 D. TRITIUM
1. Total Release Ci 1.05E+01 1.12E+01 9.08E+00 5.41E+00 2.50E+01
2. Average release rate for period Ci/sec 1.33E+00 1.42E+00 1.14E+00 6.80E-01
3. Applicable ODCM Limit  % * * *
  • F. PERCENT OF APPLICABLE ODCM LIMITS FISSION AND ACTIVATION GASES UNIT QTR 1 QTR 2 QTR 3 QTR 4
1. Quarterly gamma air dose limit  % 2.58E-03 8.09E-03 1.63E-02 5.49E-03
2. Quarterly beta air dose limit  % 2.53E-04 4.69E-04 8.64E-04 3.98E-04
3. Yearly gamma air dose limit  % 1.29E-03 4.04E-03 8.16E-03 2.74E-03
4. Yearly beta air dose limit  % 1.27E-04 2.35E-04 4.32E-04 1.99E-04
5. Whole body dose rate limit  % 5.34E-03 2.62E-03 8.18E-03 1.89E-03
6. Skin dose rate limit  % 1.59E-03 9.23E-04 1.65E-03 4.07E-04 HALOGENS, TRITIUM AND PARTICULATES WITH HALF-LIVES >8 DAYS
7. Quarterly dose limit (organ)  % 2.40E-02 2.61E-02 2.34E-02 9.25E-03
8. Yearly dose limit (organ)  % 1.20E-02 1.31E-02 1.17E-02 4.63E-03
9. Organ dose rate limit  % 4.51E-05 4.51E-05 2.29E-05 1.63E-05 6

ENTERGY NUCLEAR OPERATIONS, INC.

JAMES A. FITZPATRICK NUCLEAR POWER PLANT ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT JANUARY 2010 - DECEMBER 2010 ATTACHMENT NO. 10 GASEOUS EFFLUENTS - CARBON-14 a) Date: January 01, 2010 - December 31, 2010 b) Location: Elevated Release - Main Stack c) Duration: 365 Days d) Flowrate: N/A e) Volume Released: N/A f) Nuclides Released: Carbon-14 g) Curies Released(1):

UNIT QTR 1 QTR 2 QTR 3 QTR 4 Ci 2.60E+00 2.59E+00 2.03E+00 2.08E+00 Ci/sec 3.34E-01 3.29E-01 2.55E-01 2.62E-01 h) Resultant Doses: See Addendum 1Assessment of Radiation Doses to the Public January-December 2010 Table 1E i) Dose Calculations: Doses were calculated in accordance with the Offsite Dose Calculation Manual (ODCM) Section 4.4.1 (1)

Curies released calculated using the methodology in EPRI Technical Report 1021106 Estimation of Carbon-14 in Nuclear Power Plant Gaseous Effluents.

30