Withdrawal of Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves
ML092300235
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/12/2009
From: Peter Dietrich
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-09-0096
Download: ML092300235 (2)


Text

6Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110 Lycomincj, NY 13093 Pete Dietrich Site Vice President JAFP-09-0096 August 12, 2009 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

SUBJECT:

Withdrawal of Application for Amendment to Modify the Technical Specifications Requirements for Testing of Safety/Relief Valves James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59

REFERENCES:

1. Entergy Letter, Pete Dietrich to USNRC, Application for Amendment to Modify the Technical Specifications Requirements for Testing of-Safety/Relief Valves, JAFP-09-0087, dated July 31, 2009.
2. Entergy Letter, Pete Dietrich to USNRC, Proposed Relief Request VRR-06 for the James A. FitzPatrick Nuclear Power Plant Fourth Interval In-Service Testing Program, JAFP-09-0088, dated July 31, 2009.

Dear Sir or Madam:

Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) submitted an application for an amendment to the Technical Specifications (TS) for the James A. FitzPatrick Nuclear Power Plant (JAF) (Reference 1).

The requested license amendment requires approval of an ASME OM Code Relief Request (Reference 2). It has come to my attention that, in accordance with NRC Office Instruction LIC-109, the amendment application can not be processed in parallel with the Relief Request.

Therefore, Entergy is withdrawing the amendment application pending approval of the Relief Request.

There are no new commitments made in this letter.

Questions concerning this request may be addressed to Mr. Joseph Pechacek, Licensing Manager, at (315) 349-6766.

Aq7

JAFP-09-0096 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 12 day of August 2009.

Sincereyl.) *ll.

Pete Dietrich Site Vice President PD/JP/ed cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Resident Inspector's Office U.S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant P.O. Box 136 Lycoming, NY 13093 Mr. Bhalchandra Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2A Washington, DC 20555-0001 Mr. Paul Eddy New York State Department of Public Service 3 EmpireNY Albany, State Plaza, 101h Floor 12223 Mr. Francis J. Murray Jr., President NYSERDA 17 Columbia Circle Albany, NY 12203-6399 I