list | - Information Notice 1995-01, DOT Safety Advisory: High Pressure Aluminum Seamless and Aluminum Composite Hoop-Wrapped Cylinders (4 January 1995, Topic: Brachytherapy)
- Information Notice 1995-02, Problems With General Electric CR2940 Contact Blocks In Medium-Voltage Circuit Breakers (17 January 1995)
- Information Notice 1995-02, Problems With General Electric Cr2940 Contact Blocks In Medium-Voltage Circuit Breakers (17 January 1995)
- Information Notice 1995-02, Problems with General Electric CR2940 Contact Blocks in Medium-Voltage Circuit Breakers (17 January 1995)
- Information Notice 1995-03, Loss of Reactor Coolant Inventory and Potential Loss of Emergency Mitigation Functions While in a Shutdown Condition (18 January 1995, Topic: Packing leak)
- Information Notice 1995-04, Excessive Cooldown and Depressurization of the Reactor Coolant System Following Loss of Offsite Power (11 October 1996, Topic: Safe Shutdown, Shutdown Margin, Probabilistic Risk Assessment, Troxler Moisture Density Gauge)
- Information Notice 1995-05, Undervoltage Protection Relay Settings Out of Tolerance Due to Test Equipment Harmonics (20 January 1985)
- Information Notice 1995-06, Potential Blockage of Safety-Related Strainers by Material Brought Inside Containment (25 January 1995, Topic: Foreign Material Exclusion)
- Information Notice 1995-07, Radiopharmaceutical Vial Breakage During Preparation (27 January 1995)
- Information Notice 1995-08, Inaccurate Data Obtained with Clamp-On Ultrasonic Flow Measurement Instruments (30 January 1995)
- Information Notice 1995-08, Inaccurate Data Obtained With Clamp-On Ultrasonic Flow Measurement Instruments (30 January 1995)
- Information Notice 1995-09, Use of Inappropriate Guidelines and Criteria for Nuclear Piping and Pipe Support Evaluation and Design (31 January 1995)
- Information Notice 1995-10, Potential for Loss of Automatic Engineered Safety Features Actuation (3 February 1995)
- Information Notice 1995-11, Failure of Condensate Piping Because of Erosion/Corrosion at Flow-Straightening Device (24 February 1995)
- Information Notice 1995-12, Potentially Nonconforming Fasteners Supplied by A&G Engineering II, Inc (21 February 1995)
- Information Notice 1995-13, Potential for Data Collection Equipment to Affect Protection System Performance (24 February 1995)
- Information Notice 1995-14, Susceptibility of Containment Sump Recirculation Gate Valves to Pressure Locking (28 February 1995)
- Information Notice 1995-15, Inadequate Logic Testing of Safety-Related Circuits (7 March 1995)
- Information Notice 1995-16, Vibration Caused by Increased Recirculation Flow in a Boiling Water Reactor (9 March 1995)
- Information Notice 1995-17, Reactor Vessel Top Guide and Core Plate Cracking (10 March 1995, Topic: Safe Shutdown)
- Information Notice 1995-18, Potential Pressure-Locking of Safety-Related Power-Operated Gate Valves (15 March 1995)
- Information Notice 1995-19, Failure of Reactor Trip Breaker to Open Because of Cutoff Switch Material Lodged in the Trip Latch Mechanism (22 March 1995)
- Information Notice 1995-20, Failures in Rosemount Pressure Transmitters Due to Hydrogen Permeation Into Sensor Cell (22 March 1995)
- Information Notice 1995-21, Unexpected Degradation of Lead Storage Batteries (20 April 1995)
- Information Notice 1995-22, Hardened or Contaminated Lubricant Cause Metal-Clad Circuit Breaker Failures (21 April 1995)
- Information Notice 1995-23, Control Room Staffing Below Minimum Regulatory Requirements (24 April 1995)
- Information Notice 1995-24, Summary of Licensed Operator Requalification Inspection Program Findings (25 April 1995, Topic: Job Performance Measure, License Renewal)
- Information Notice 1995-25, Valve Failure During Patient Treatment with Gamma Stereotactic Radiosurgery Unit (11 May 1995)
- Information Notice 1995-26, Defect in Safety-Related Pump Parts Due to Inadequate Treatment (31 May 1995)
- Information Notice 1995-27, NRC Review of Nuclear Energy Institute, Thermo-Lag 330-1 Combustibility Evaluation Methodology Plant Screening Guide. (31 May 1995, Topic: Safe Shutdown, Fire Barrier, Exemption Request, Fire Protection Program)
- Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites (5 June 1995, Topic: Safe Shutdown, Tornado Missile, Safe Shutdown Earthquake, Earthquake)
- Information Notice 1995-29, Oversight of Design and Fabrication Activities for Metal Components Used in Spent Fuel Dry Storage Systems (7 June 1995, Topic: Nondestructive Examination)
- Information Notice 1995-30, Susceptibility of Low-Pressure Coolant Injection Valves to Pressure Locking (3 August 1995, Topic: Hydrostatic, Power-Operated Valves)
- Information Notice 1995-31, Motor-Operated Valve Failure Caused by Stem Protector Pipe Interference (9 August 1995)
- Information Notice 1995-32, Thermo-Lag 330-1 Flame Spread Test Results (10 August 1995, Topic: Fire Barrier)
- Information Notice 1995-33, Switchgear Fire and Partial Loss of Offsite Power at Waterford Generating Station, Unit 3 (23 August 1995)
- Information Notice 1995-34, Air Actuator and Supply Air Regulator Problems in Copes-Vulcan Pressurizer Power-Operated Relief Valves (25 August 1995)
- Information Notice 1995-35, Degraded Ability of Steam Generators to Remove Decay Heat by Natural Circulation (28 August 1995)
- Information Notice 1995-36, Potential Problems with Post-Fire Emergency Lighting (29 August 1995, Topic: Safe Shutdown, Emergency Lighting, Exemption Request)
- Information Notice 1995-37, Inadequate Offsite Power System Voltages During Design-Basis Events (7 September 1995)
- Information Notice 1995-38, Degradation of Boraflex Neutron Absorber in Spent Fuel Storage Racks (8 September 1995)
- Information Notice 1995-39, Brachytherapy Incidents Involving Treatment Planning Errors (19 September 1995, Topic: Brachytherapy)
- Information Notice 1995-40, Supplemental Information to Generic Letter 95-03, Circumferential Cracking of Steam Generator Tubes. (20 September 1995, Topic: Hydrostatic, Nondestructive Examination, Brachytherapy)
- Information Notice 1995-41, Degradation of Ventilation System Charcoal Resulting from Chemical Cleaning of Steam Generators (22 September 1995, Topic: Brachytherapy)
- Information Notice 1995-42, Commission Decision on Resolution of Generic Issue 23, Reactor Coolant Pump Seal Failure. (22 September 1995, Topic: Brachytherapy)
- Information Notice 1995-43, Failure of Bolt-Locking Device on Reactor Coolant Pump Turning Vane (28 September 1995, Topic: Brachytherapy)
- Information Notice 1995-44, Ensuring Compatible Use of Drive Cables Incorporating Industrial Nuclear Company Ball-Type Male Connectors (26 September 1995, Topic: Brachytherapy)
- Information Notice 1995-45, American Power Service Falsification of American Society for Nondestructive Testing Certificates (4 October 1995, Topic: Brachytherapy)
- Information Notice 1995-46, Unplanned, Undetected Release of Radioactivity from the Exhaust Ventilation System of a Boiling Water Reactor (6 October 1995, Topic: Brachytherapy)
- Information Notice 1995-47, Unexpected Opening of a Safety/Relief Valve & Complications Involving Suppression Pool Cooling Strainer Blockage (30 November 1995)
... further results |
---|