IE Insp Repts 50-566/78-08 & 50-567/78-08 on 781017-20. Noncompliance Noted:Qa Site Audits
ML19269C935
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 11/13/1978
From: Gouge M, Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19269C922 List:
References
50-566-78-08, 50-566-78-8, 50-567-78-08, 50-567-78-8, NUDOCS 7902210173
Download: ML19269C935 (6)


Text

.

UNITED r.TATEs

[(e* "EC W

NUCLEAR REGULATORY COMMISSION o,

,

REGloN 11

  1. (

o 101 M ARIETT A sTRE ET, N.W.

f

c

[

ATLANT A, GE oRGI A 30303

o

  • ....J

-

-

Report Nos.

50-566/78-8 and 50-567/78-8 Docket Nos.

50-566 and 50-567 License Nos.

LWA-1 and LWA-2 Category.

Al and Al Li c e ns e.- -

Tennessee Valley Authority 830 Power Building Chattanooga, Tennessee 37401 Facility Name:

Yellow Creek Nuclear Plant, Units 1 and 2 Inspection at:

Yellow Creek Site, Tishomingo County, Mississippi Inspection Conducted:

October 17-20, 1978 Inspector:

M.

Gou

/3/[

//

Reviewed by:

A. R. Herdt, Chief IDa(e Projects Section Reactor Construction and Engineering Support Branch Inspection Summary Inspection en October 17-20, 1978 (Report Nos. 50-566/78-8 and 50-567/78-8)

Areas Inspected:

Routine unannounced inspection of construction status, LWA activities, QA audits, drawing control, QA/QC records, site handling of IE bulletins / circulars, and warehouse storage of construction materials.

The inspection involved 22 inspector-hours on site by one NRC inspector.

Results: Of the seven areas inspected, no apparent items of noncompliance or deviations were identified in six areas, one apparent item of deviation (QA site audits, Details 1 paragraph 4b) was idert:fied in one area.

7902210/D

.

RII Rpt. Nos. 50-566/78-8 and 50-567/78-8 I-1

/

[

II DETAILS I Prepared by:

' 7 ' y>

  1. 7-

/ //

'

M. J. G6uge, Pribcipal Inspector Date Projects Section Reactor Construction and Engineering Support Branch Dates of Ir.specti Oc ober 17-20, 1978

,

'h[ '

h M/7[

Reviewed by:

A. R. Herdt, Chief

'Da't e Projects Section Reactor Construction and Engineering Support Branch 1.

Persons Contacted Tennessee Valley Authority M. M. Price, Project Manager

  • L. S. Cox, Construction Engineer S. G. Carr, Assistant Construction Engineer (PE)
  • C. G. Wages, Assistant Construction Engineer (QC)
  • R. Delay, Supervisor, Civil and Materials QC Unit
  • R. D. Briggs, Supervisor, Mechanical QC Unit
  • J. B. Nelson, Les? Auditor, Pe ject QA Unit
  • S. E. Alge, Supervisor, Document Control Unit T. E. Brown, Supervisor, Warehouse Services
  • J. R. Daniel, Materials QC Unit
  • S. Watson, Document Control Unit K. Durrant, Project QA Unit R. Newby, Project QA Unit L. Parker, Project QA Unit
  • Denotes those present at the exit interview.

2.

Licensee Actions on Previous Inspection Finding ;

This area was not inspected.

3.

Unresolved Items No new unresolved items were identified duricg the inspectio.

RII Rpt. Nos. 50-566/78-8 and 50-567/78-8 I-2 4.

Independent Inspection Effort a.

Construction Status /LWA Activities The inspector conducted a visual inspection of the site to de te rmine current construction status and to ascertain that the licensee was ccatinuing to work within the scope of activities authorized by 10 CFR Sections 50.10(e)(1) (LWA-1) and 50.10(e)(3)

granted by NRR's letter dated February 9, 1978. All (LWA-2) as activities observed were within the scope of the Limited Work Authorization (LWA).

Blasting of bedrock for Units 1 and 2 reactor buildings has progressed to approximate elevation 440 feet.

Blasting operations are close to complete, however, much loose bedrock han to be removed from the excavation site. Work continues on foundations in the turbine building area and fabrication of Condenser Circulating Water (CCW) system piping.

Upgrading of onsite roads, const ruction of drainage and sewage facilities, and fabrication of warehouse, office, shop, and storage buildings are continuing operations.

The central-mix batch concrete plant requires calibration. Two key construction staff positions still require manning: Supervisor, Materials QC Unit and Supervisor, Welding Unit, b.

Quality Assurance (QA) Audit Review The TVA Topical Report TR 75-1-A Section 17.1 A.18. 3 t i tled

" Construction Audits" specifies that the Supervisor, Site QA Unit, is responsible to perform planned and periodic audits of all construction activities. The audit results are to be documented and reviewed by management.

The following DEC QA audits were examined by the RII inspector for deficiencies found, corrective action specified, completeness and the implementation in accordance with the licensee's procedures CEP 18.01 and QAP 18.01.

Audit No.

Subject YC-L-78-01 Receiving Inspection YC-L-78-02 Storage, Preservation and Maintenance of Safety-Related items

.

RII Rpt. Nos. 50-566/78-8 and 50-567/78-8 I-3 YC-G-78-01 Document Control YC-G-78-02 Procurement Document Control YC-G-78-03 Control of Quality Control Investigation Reports and Nonconf ormances YC-G-78-04 Quality Assurance Records YC-G-78-05 Storage, Preservation and Control of Materials Item 2 of the audit summary section of YC-G-78-04 and item 1 of the audit summary section of YC-G-78-05 identified areas that were not in compliance with the applicable TVA procedures and instructions.

No deficiencies were written in these areas and there was not, therefore, a formal and documented method to ensure corrective action was taken or in progress. Criterion XVIII of Appendix B to 10 CFR 50 states in part: " Followup action, including reaudit of deficient areas, shall be taken where indicated."

TVA Construction QAP 18.01 section 6.5.5 states:

" Deficiencies encountered during the audit shall be recorded and shall be supported by sufficient data and specific examples to adequately substantiate the evaluation." QAP 18.01 section

.6.1 states in part: " Sufficient data shall be recorded on tne deficiency sheet to substantiate the encountered deficiencies."

The practice explained above of identifying audited items not in compliance with applicable TVA procedures but not documenting these nonconforming items on a deficiency sheet to ensure corrective action and/or reaudit is not in accordance with TVA Construction QAP 18.01 and is identified as deviation item Nos.

566-567/78-08-01.

c.

Drawing Control The master drawing file, superceded master drawing file, and drawing control ledger system were inspected for conf ormance to Yellow Creek Nuclear Plant Standard Operating Procedure (SOP)-7

" Drawing Control."

Adequate procedures exist and have been implemented for control of construction drawings.

No deviations or items of noncompliance were identified in the above area inspecte.

.

.

.

RII Rpt. Nos. 50-566/78-8 and 50-567/78-8 I-4 d.

QA/QC Record Review (1) The master Quality Control Investigation Report (QClk) log maintained by the Document Control Unit was reviewed for content and accuracy in accordance with CEP 15.01.

Completed (cleared) QCIR's were reviewed and the local QCIR log maintained by the Materials and Civil QC Unit Supervisor was inspected. The QCIR system was found to be implemented and functioning in accordance with CEP 15.01.

(2) Qualification records of the Materials and Civil QC Unit personnel were inspected for accuracy and to determine the training these personnel had received to date. The records were properly maintained and the training received by Materials and Civil QC personnel was adequate for current construction status.

(3) The construction site audit file maintained by the Document Control Unit was reviewed.

It was found that two audit reports were missing from the file and a third report had not been updated to reflect correction of deficiencies. These areas were corrected during the course of the inspection.

The master audit file maintained by the Project QA unit was accurate and complete.

-

No deviations or items of noncompliance were identified in the above areas inspected.

Site Review of IE Bulletins and Circulars e.

The inspector reviewed the file of IE Bulletins and Circulars maintained by the Document Control Unit. The site is receiving IE Bulletins and Circulars in a timely manner. The project manager and construction engineer review all received Bulletins and Circulars for applicability to the project and determine what corrective action, if any, is required.

No deviations or items of noncompliance were identified within the above areas inspected.

f.

Warehouse Storage of Construction Material The ir.spector conducted a walk-thru of all site warehouse areas to dete rmine if safety-related items were being stored in proper areas and in accordance with the applicable Receiving Inspection,

.

.

.

.

RII Rpt. Nos. 50-566/78-8 and 50-567/78-8 I-5 Storage and Preventive Maintenance Manual (RIS-FM) procedures.

All safety-related items observed were stored in the designated areas in accordance with applicable RIS-PM procedures.

No deuiations or items of noncompliance were identified within the above area inspected.

5.

Exit Interview The inspector met with licensee representatives listed in paragraph 1 at the conclusion of the inspection on October 20, 1978. The inspector summarized the scope of the inspection as follows: construction status, Lk'A activities, QA audit review, drawing control and QA/QC records review, site bandling of IE Bulletins and Circulars, and warehouse storage inspection. The Region II inspector identified one deviation with 10 CFR 50 Appendix B and TVA Construction QAP 18.01 which has been designated deviation item Nos. 566-567/78-08-01.