IE Inspec Repts 50-566/78-06 & 50-567/78-06 on 780913-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Constr Status,Work Performance,Qa Prog Implementation & Assoc Quality Records for Site Preparation
ML20148R746
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 10/17/1978
From: Bryant J, Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20148R744 List:
References
50-566-78-06, 50-566-78-6, 50-567-78-06, 50-567-78-6, NUDOCS 7812010040
Download: ML20148R746 (4)


Text

- - - - - - - - - - - - - - __ - ______ - __ ___ ___ _____

Og UNITED STATES

, [p* Rf C o,, NUCLEAR REGULATORY COMMISSION e # REGION 11

) .; , g 5 ' d- r g 101 M AfilETT A sT RE E T. *

o ' ,8 ATLANTA. GEORGI A 30303 j'

o,, . .v ...

Report Nos.: 50-566/78-06 and 50-567/78-06 Docket Nos.: 50-566 and 50-567 License No.: LWA Categories: A1, Al Licensee: Tennessee Valley Authority 830 Power Building Chattarooga, Tennessee 37401 Facility Name: Yellow Creek Nuclear Plant, Units 1 and 2 Inspection at: Iuka, Mississippi Inspection conducted: September 13-15, 1978 Inspector: J. R. Harris Other Accompanying Personnel: J. J. Lenahan (In Training)

l Reviewed by f\ ru. h ts _ , - .

~ _

t7 78 J. C. Bryant ,\ Chief 'Da th

}

l Engineering Support Section 30. 1

' Reactor Construction and Engineering Support Branch Inspection Summary Inspection on September 13-15, 1978 (Report Nos. 50-566/78-06 and 50-567/78-06)

Areas Inspected: Construction status, work performance, QA program imple-mentation and associated quality records for site preparation, QA program implementation for structural concrete. The inspection involved 20 inspector-hours onsite by one NRC inspecto Results: No deviations or items of noncompliance were identifie TUS@Ihb(f)

___-_-_ _ ..

.

I

.

RII Report Nos. 50-566/78-06 and 50-567/78-06 I-2 DETAILS I Prepared by: , A.v1 /d/// y

' R.11arris, Civil Engineer / Geologist / ate ngineering Support Section No. 1 Reactor Construction and Engineering Support Branch Dates of Inspection: September 13-15, 1978 Reviewed by: lh _ (fmW e 10 g 8 J. C.'Bryant\' Chief J at Engineering Support Section No. 1 Reactor Construction and Engineering Support Branch Persons Contacted Tennessee Valley Authority (TVA)

  • M. M. Price, Project Manager
  • L. S. Cox, Construction Engineer
  • C. E. Hale, Supervisor, Civil Project Engineering Unit
  • S. Carr, Assistant Construction Engineer, Project Engineering Unit
  • R. Delay, Supervisor, Materials and Civil QC Unit
  • G. G. Wages, Assistant Construction Engineer, Project Engineering
  • C. Burshears, Project Geologist
  • J. N. Holladay, Supervisor, Project QA Unit
  • S. Alge, Supervisor, Document Control Unit
  • S. Watson, Document Control Unit
  • Denotes those present at the exit intervie . Licensee Action on Previous Inspection Findings This area was not inspecte . Unresolved Items No unresolved items were identifie . Independent Inspection Effort The inspector made a visual inspection of construction activities, examined the quarry at Cherokee, Alabama, furnishing coarse aggregate and reviewed records on concrete aggregates and reinforcing stee The licensee's present operations are controlled by the terms of an

_ __

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

s RII Report Nos. 50-566/78-06 and 50-567/78-06 I-3 LWA-1 and LWA-2 issued February 3, 1978 and commitments in the PSA During the inspection, no deviations or items of noncompliance were disclosed within the areas inspecte . Site Preparation - Observation of Work and Work Activities, Units 1 and 2 The inspector examined ongoing work and results of work for excavation by blasting of Units 1 and 2 powerhouse blocks. Acceptance criteria examined by the inspector appear in sections 2.4 and 2.5 of the PSAR and TVA Tepical Report TR 75-1A, RI. Controlling procedures, specifica-tions and drawings examined by the inspector are: QCI 110. Excavation and Fill, Blasting Inspection and Monitoring N8C-882, RO, Earth and Rock Foundations and Fills SOP No. 4, Release for Blasting After Placement of Concrete S0P No. 5, Control of Blasting Materials Drawings 41T0500-Y1-1 and 41T0500-Y1-2, Units 1 and 2 Reactor, Fuel Control and Waste Management Buildings, Structural Excavation Observation of completed work and discussions with responsible engineers indicated blasting operations are being controlled in accordance with acceptance criteri No deviationc or items of noncompliance were disclose . Site Preparation - Review of Quality Records, Units 1 and 2 The inspector examined records on blast numbers 54, 55, 58, 59 and 63-66; the blast release monitoring log and geologic photographs; and maps on site preparation. Acceptance criteria examined by the inspectors included procedure QAP 5.3 and those listed in paragraph 5. Examination of blast records and geologic maps and photographs indicated site preparation activities are being accomplished in accordance with acceptance criteri No deviations or items of noncompliance were disclose . Exit Interview _

The inspector met with the licensee representatives listed in para graph I at the conclusion of the inspection. The licensee was aprrised of the scope of the findings of the inspection which included con,truc-tion status, QA program implementation on structural concrete anc' work performance anc associated quality records for site preparatio II .

d RII Report Nos. 50-566/78-06 and 50-567/78-06 I-4 The inspector stated that no items of noncompliance or deviations were disclosed.