Text
.
.-
-.-
--
_-
.
.
.
-.
.
_..
.
O U.S. NUCLEAR REGULATORY C03Dt!SSION
OFFICE OF INSPECTION AND ENFORCES!ENT
!
REGION III
Report Nos.
50-546/81-03; 50-547/81-03 Docket Nos. 50-546; 50-547 License Nos. CPPR-170; CPPR-171
,
Licensee: Public Service of Indiana Post Office Box 190 New Washington, IN 47162 Facility Name: Starble Hill Generating Station, Units 1 and 2
.
Inspection At: Starble Hill Site, Jefferson County, IN
,
Inspection Conducted: February 1-28, 1981 h.J. Harrison.4W 3./4 et J
Inspector:
,
- l$N
'
'
Approved By:
W.
S. Little, Chief
,,/
-
Reactor Projects Section 2C-M N
/
Inspection Summary Inspection during the period of February 1-28, 1981 (Report Nos. 50-546/
,
I 81-03: 50-547/81-03)
Areas Insoccted:
Inspection by the IE Regional Resident Inspector of activities at the site to verify that the activities being performed complied with the NRC Confirming Stop Work Order, dated August 15,1979, and werewithin the scope of the Graduated Rescission of the order as identified in letters dated July 7,= 1980 (authorization for PSI to-resume receiving
' inspection activities), November 13, 1980 (authorization for two firms, Cherne and Commonweelth-Lord JV, to resume receiving inspection actidties),
and December 5,1980- (authorization for two firms, Cherne and Commonwealth-Lord JV, to restae construction activities with certain conditions being
_
specified). Tre inspection also consisted of a' review of storage and maintenance activities for safety related items, a review of the PSI receiving inspection activities and construction activities being conducted by the mechanical and electrical contractors. This inspection involved'
a total of 102 inspector-hours on site by one NRC inspector, including 6 inspector hours'onsite during off-shifts.
Results: No: items of noncompliance or deviations were identified.
'
81040ggo w
..
.. --
.-
.
- -. -.
-
.... -.
-
.
.
. _ _
_.
.
. _ _ _ _ _ _ _ _ _ _. _.
_ _ _.... _ _ _. _ _ _ _..._. --._ - - - - -
_..._. __.. _. _ _ _. -
"E
,
DETAILS-
'
I Principal Persons Contacted
!
Public Service of Indiana (PSI)
.
- S.
Shields, Senior vice President Nuclear Division
l
- B.
Petro, Project Director t
- L.
Ramsett, QA Manager
- C. Beckham, Manager Quality Engineering
'
D. Janecke, Superintendent Quality Systems J.' Roberts, Superintendent Inspection T. Burns, Project Engineering Manager D. Ingmire, Project Engineering staff - Special Projects
,
R. Keele, Superintendent - Quality Administration
B. Morrison, Superintendent - Civil Quality Engineering
'
- J. Keys, QA Administrative Assistant Cherne Contracting Corporation (CCC)
'
J. Mortell, Project Manager
.
i A. Dolgaard, QC Manager j
T. Francis, Principal-Engineer l
Newberg - Marble Hill (N-MH)
j
$
D. Stegemoller, Vice President'- Power Construction 1. Barbour, Project QA Manager Westinghouse Electric Corporation.
C. Markham, site Manager Authorized Nuclear Inspector ( ANI)
i A. Clark, Hartford ateam Boiler ( ANI-PSI),
- B. Braden, Hartford Steam Boiler ( ANI-Cherne)
,
$>
- Denotes thosefpresent at the exit meetings.
The inspector also contacted and interviewed other licensee and contractor personnel.
f i
s I
k-2-
,
,
+
.y4n-
. ne~
. -., -...,
.,n.
,,a
,
,, _, -,
.,
e,...
,.,r.,.,
, _.,,
,.,,.-s.
,
,. -, - ~,. -
..-,
--w--
- ~, -
...
-. - -.....
- - -
- -.. -
_. - - _
. -... ~. ~ ~.
.
... _. _.
- _ _..
_
<
=
l
-
,
.
t
.
Functional or Progra Areas Inseected i
1.
Construction Activities
Inspection of construction activities was perfcreed by the Resident
,'
Inspecter to assure that week in Category 1 areas was being perforced within the secpe of the NRC Confirmatory Order dated August 15, 1979
and Graduated Rescission to the Order by NRC letters of July 7,
.
November 13 and Oecember 5, 1980. The activities observed were
+
within this secpe. cre inspection was conducted during an off-shift period.
,
No items of nonconpliance or deviations were identified.
S I
0.
Storage and Preservation of Material and Icuierent
'
l
'
The Resident Inspector observec the storage conditions and maintenance
,
activities in laydown areas, warehouses, and interi storage in the l
Auxiliary and Fuel Handling Buildings, and other storage areas of
!
=aterial and equipment.
These inspections were performed to assure
[
ccepliance with the requirements of ANSI N45.2.2.-Packaging, Shipping,
,
'
Receiving, Storage and other requirements of the Nuclear Stea: Syste:
,
supplier (Xestinghouse) and the Public Service of Indiana's Project
!
Management Manual.
No iters ' of nonco=pliante c-deviations were identified.
l
-
-,
i.
3.
Receivin2 Inspection Progra:
!.
l The Resident Inspector observed the engcing receiving inspection activities being perforced in.accordance with Project Management
,
Manual Procedure FMF-3.07, Revision 6, dated January 20, 1981 for
'
PSI activities, i
No items of nonec:pliance or deviations were identified.
!
,.
4.
Scecial Inspections i
During this reporting period the Resident Inspector participated.
,
'
in a special inspection of the Newberg - Marble Hill Quality Assurance Program. This inspection was performed to evaluate
,
program adequacy to support. receiving inspection' and construction l
activities.
Inspection details and results'are documented in i
NRC Inspection Report Number 50-546/80-44 and 50-547/80-44.
,
i i
i l
l'
-3-
.
hl'
l
g.
v.,.
_
,.,
-.., -,.,-,
,.
-
_~
--.-,,_u.
_.._;__.,._,-,,__---.
a_._-..,,__.2.,--....
-.. -
...
O
Meetines site Visits During this repcrtir.g period the Resident :nspector participsted in the following:
The NRC independent concrete censultants returned to the site Februarv 2 and 10, 1981, to continue their assessment of the adequacy of in-place cencrete.
This visit included continuing report review, visual inspection and witnessing seme additional ::croseis=ie testing using the pulse-echo technique. The two consultants, R.C. Har: and A.L.
Parme 'aere accc panied by Dr. M. Cassa*o, representing Save The Valley, a purlic interet*. group. NRC participates included H. Wcng (IE Head-quarters), C. *n:lli ams, W.
Little, and E. Schweibin: (IE, Regicn III).
Exit Meetin;s The Resident :nspector participated ir. exit meetings conducted on:
February 20, 1981, F. Hawkins. E. Schweibinc, J. Harr: son February 27, 1981, E. Schweibin:, J. Harrison The Resident Inspector also zet with licenses representatives ide.oted under Persons Centacted) periodically throughcut this reporting period collectively and individually.
The ir.spectcr summariced the sccpe and findings for each part of this activity.