Insp Rept 50-508/86-10 on 860915-19.No Violations or Deviations Noted.Major Areas Inspected:Readiness Review Program,Const Assurance Program & Site Tour
ML20211C705
Person / Time
Site: Satsop
Issue date: 10/01/1986
From: Ang W, Mendonca M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20211C702 List:
References
50-508-86-10, NUDOCS 8610220006
Download: ML20211C705 (6)


Text

,_ - _ _ _ - _ _ _ ___________ _ ______ _ _____________

U. S. NUCLEAR REGULATORY COMMISSION

REGION V

Report No. 50-508/86-10 Docket No. 50-508 Construction Permit No. CPPR-154 Licensee: Washington Public Power Supply System (WPPSS)

P. O. Box 1223 Elma, Washington 98541 l Facility Name: Washington Nuclear Project 3 l Inspection Conducted: September 15-19, 1986 Inspectors: b 1 ID'I' N W. P. Ang, Project Inspector

,

Date Signed Approved by: % #- ^'A /'l G M. M. Mendonca, Chief Date Signed Summary:

Inspection on September 15-19, 1986 (Report No. 50-508/86-10)

Areas Inspected: Routine unannounced inspection by a regionally based inspector of the readiness review program, construction assurance program, and site tou Inspection procedures 30703, 45055, 47051 and 92050 were used for guidanc Results: Of the areas inspected, no violations or deviations were identifie ;W2;ggg gaggge G

- _ _ _ _

_ _

.

.

DETAILS 1. . Persons Contacted ' Washington Public Power Supply System

  • D. Olson, Program Director
  • E. Love, Program Support _ Manager
  • R. Coody, Project QA Manager
  • L. Knawa, Construction Assurance Program Manager
  • J. D. Guberski, Plant Technical Manager A. Dennis, Mechanical Maintenance Supervisor M. DeBoard, Maintenance * Coordinator C. Crothers, Plant Technical P. Lemke, Mechanical, Maintenance Department M. Church, Mechanical, Maintenance Department

> Ebasco Services In *P. L. Pitman, Quality Program Site Manager (Acting)

  • Attended exit intervie . Independent Inspection Effort The inspector conducted a general inspection of the QA records vault, portions of the exterior and interior area of the reactor building and of the auxiliary building to observe plant preservation, housekeeping, and storag No violations or deviations were identifie . Readiness' Review - Construction Assurance Program (CAP) Module 1 -

Earthwork i Oversight Committee - Cap Module 1 - Earthwork Supply System. letter G03-86-045 dated January 20, 1985 submitted the Readiness Review Program Engineering Assurance Program (EAP) and the CAP that are being implemented for WNP-3. These programs contained licensee commitments regarding monitoring of the programs by an independent Oversight Committee as follows:

"To provide additional assurance that the Readiness Review Program meets its objectives, the planning and implementation of the program will be monitored by an Oversight Committee of independent consultants who will provide guidance, recommendations and on going assessment of the program as it progresses to completion."

The following correspondence between the Oversight Committee and the licensee were reviewe _ _ - - - - . - . _ _ . _ _ . _ - . _ _ _ _ __- . _ _

~

-

.

WPPSS letter G03-85-507 dated 9-5-85 - submittal of draft CAP program for Oversight Committee revie WPPSS inter-office memo dated 9-11-85 - Oversight Committee kick-off meeting (9-10-85) note *

Dr. S. H. Bush to WPPSS letter dated 9-23-85 - Oversight Committee comments on EAP and CA WPPSS letter G03-85-588 dated 10-4-85 - WPPSS response to

'

Oversight Committee comments on EAP and CA *

WPPSS letter G03-85-671 dated 11-13-85 - Formalizes Operating Charter for Oversight Committe *

Dr. S. H. Bush to WPPSS letter dated 11-29-85 - Oversight Committee comments on Operating Charte *

WPPSS. letter G03-85-707 dated 12-6-85 - Oversight Committee Operating Charte *

Dr. S. H. Bush to WPPSS letter dated 2-7-86 - Comments on WNP-3 Readiness Review Program resulting from January 21-22, 1986 Oversight Committee Meetin *

WPPSS letter G03-86-130 dated 3-6-86 - Response to Oversight Committee comments on Readiness Review Progra *

WPPSS letter G03-86-305 dated 5-22-86 - Forwards CAP earthwork

_ module review plan for Oversight Committee Revie *

WPPSS letter G03-86-358 dated 6-19-86 -~ Forwards Revision 1 of Earthwork Review Pla Dr. S. H. Bush to WPPSS LER dated 8-8-86 - Oversight' Committee Comments on CAP Earthwork and EAP Piping and Pipe Support modules, NRC comments,- 7-15-86 and 7-16-86 Oversight Committee on-site review and CAP team intervie *

WPPSS letter G03-86-460 dated 8-20-86 - Forwards CAP Earthwork Report draft for Oversight Committee revie *

Dr. S. H. Bush to WPPSS letter dated 9-1-86 ' Oversight Committee comments on CAP Earthwork repor Dr. S. H. Bush to WPPSS letter dated 9-10-86 - Oversight Committee assessment of CAP Earthwork repor The above noted correspondence documented the Oversight Committee guidance, recommendations and assessment of the CAP Earthwork module. This documentation as confirmed by Dr. S. H. Bush letter to the Supply System on 9-10-86 indicated that the Supply System had fulfilled the intent of the Earthwork Readiness Review and the

- - - -. -- _ - - - - __ _ _ _ _ _ . . -. . _ _ . _ .

, -

-

,

'

,

licensee confirmed the acceptability of completed earthwork at WNP- No violations or deviations were identifie CAP Module 2 - Concrete (1) -Personnel Qualifications - Technical personnel scheduled for the Concrete Readiness Review were identified by the licensee as being the same as those involved in the Earthwork Readiness Review except for one reviewer. Qualification of the Earthwork Review team had been inspected and the inspection was documented on RV report 50-508/86-04 and 50-508/86-0 Personnel technical records for the new prospective reviewer were inspected. Verification of employment history and training had not yet been completed for the new reviewer. The licensee stated that these would be completed prior to performance of any reviews by the new reviewe No violations or deviations were identifie (2) Review Plan and Checklist Preparation - At the time of the inspection, the licensee was still in the process of preparing the review plan and had not yet generated review checklist Review preparation activities were discussed with the CAP Manager and the Review Team Leader. The discussions indicated that preparations were underway for a comprehensive review of completed concrete activitie No violations or deviations were identifie . Extended Construction Delay Activities (0 pen) IE Notice 85-56 - Inadequate Environment Control for Components and Systems in Extended Storage or Lay-Up The IEN was opened in February of 1986 by RV inspection report 50-508/86-02. The IEN and the inspection report identified a need for the licensee to review its preservation program and determine the need for internal visual inspection of tanks, heat exchangers, et Subsequently, the licensee issued 155 Maintenance Work Requests (MWR's) to inspect and preserve 48 safety-related and 179 balance of plant pumps, tanks and heat-exchangers. The completed NWR's were reviewed and it was noted that foreign material,. water and corrosion were observed in some balance of plant component The licensee stated that no foreign material was observed in safety-related components and that the approximately 19 balance of '

plant components that were observed with foreign material, water or corrosion had been cleaned and preserved if required. The inspector ,

was unable to review QA activities in relation to this matter due,to .

personnel availability. This IE Notice will be further inspected on

'

-

future inspection ,

'

No violations or deviations were identifie '

.

. -

t b. Corporate QA Audit - 86-368 Regarding Pre'servation of Assets Preventative Maintenance Program The subject QA audit was performed b'y the corporate QA office on June 9-13, 1986 and the audit report was issued on July 11, 198 The subject QA audit was reviewed and found to be a thorough review and assessment:of the programmatic QA implementation of the preservation program. The. audit included a limited amount of actual inspection of hardware. The inspector noted that the audit could be further enhanced by more technical hardware reviews and more program hardware completeness reviews (i.e. all components are being preserved in a technically correct manner). The inspector acknowledged that the programmatic QA audit was intended to verify 10 CFR 50 Appendix "B" implementation but also noted that such programmatic verification could be enhanced by an increased emphasis on hardware adequac The QA audit listed procedures that provided applicable requirements for the preservation program. The NRC inspector reviewed the procedures and observed that the QA activities that were being performed in relation to the preservation program for a plant in an extended construction delay were not specifically provided for in the following procedures:

-

NOS 18, Rev. 3, Plant QA Surveillance Program

-

WMC 051, Rev. 2, Preservation.of Assets Preventative Maintenance Program

-

. PPM 10.100.19, Rev. 2, Stored Equipment Maintenance and Preservation

-

PQA 03, Rev. 6, Plant Surveillance Activitie The above noted inspector observations regarding enhancement of the QA audits and inclusion of QA extended construction delay activities in the applicable procedures were discussed with the license Pending further inspection this was identified as inspector follow-up item 86-10-0 No violations or deviations were identifie c. Fire Protection System On July 2, 1986, the licensee reported the failure of a WNP-1 temporary construction fire protection system and subsequent flooding of the General Service Building. The failure was subsequently attributed to the separation of a victaulic coupling joint. The inspector discussed the event with the licensee and inspected the installed WNP-3 fire protection system to determine the adequacy of the installation. The inspector noted that the licensee had evaluated applicability of the reported WNP-1 condition and considered WNP-3 to be less succeptible due to the following: '

The majority of the plant fire protection system is. permanently installed welded piping. Victaulic couplings were used in some applications but externally appeared to be properly installe z, - s u , ,

m

'

, .

'

5

.

W *

f :

  • - /

t

' '

-* =WNP-3 control room is continuously manned. Annunciators in *

,= control room indicate operation of fire pump Significant

' leakage indicated by fire pump operation should be identified

'.

, . '.- -

by the control room watch and appropriate corrective action could be initiate . ,

The licensee agreed to further assure adequacy of the victaulic couplings by including external visual inspection 'of all couplings for potential

. visible degradation / leakage during periodi_c fire protection system ~ ~

_

.surveillances. In addition the licensee agreed to establish the service life for the victaulic coupling seal material and pr' ovide for the service: ,

life as' appropriate on preventative maintenance schedule No violations or deviations were identifie .

~Nxit Interview

' The inspection scope and findings were summarized on September 19, 1986, with those persons indicated in paragraph 1. The inspector described the areas inspected and discussed in detail the inspection findings. No dissenting comments were received from the licensee. The licensee _did not identify' as proprietary any 'of the material which was provided to, or reviewed by the inspector during this inspectio ,