Meeting Rept 50-508/86-09 on 860801.Topic Addressed:Const Assurance Program.Viewgraphs Encl
ML20206P317
Person / Time
Site: Satsop
Issue date: 08/08/1986
From: Ang W, Mendonca M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20206P309 List:
References
50-508-86-09-MM, 50-508-86-9-MM, NUDOCS 8608270151
Download: ML20206P317 (4)


Text

'

-

. ,

-

,

,

U. S.' NUCLEAR REGULATORY C0teIISSION

REGION V

Report No. 50-508/86-09 Docket No.30-508 Construction Permit No. CPPR-154 Licensee: Washington Public Pou r Supply System 3000 George Washington Way Richland, Washington 99352 Facility Name: Washington Nucle.sr Project 3 Meeting at: Region V, Walnut Creek, California Date: A'igust 1, 1986

  1. !#/# 0

'

Prepared by: % "#

N.P.Ang,PrVectInspector Date Signed

"

A; proved by: 5-/r/ ( t, 11. t!. Mendonca, Chief, Reactor Project Date Signed Section I Summary:

11erting on August 1,1986, to discuss the Supply System Construction Assurance Program for WNP- .

.

G600270151 060011 PDR 0 ADOCK 05000500 PDR

_

'

e

.

DETAILS , Personnel Attending Meeting RV-NRC D. F. Kirsch, Director, Division of Reactor Safety and Projects A. E. Chaffee, Deputy Director, Division of Reactor Safety and Projects R. J. Pate, Chief, Reactor Safety Branch M. M. Mendonca, Chief , Reactor Project Section I 4. P. Ang, Project Inspector, WNP-3 NRR-NRC G. Dick, Licensing Project Manager IE-NRC G. T. Ankrum, Chief, Quality Assurance Branch W. M. Hill, Acting Section Chief, Quality Assurance Branch WPPSS L. J. Garvin, Program Manager, Readiness Review R. L. Knawa, Manager, Construction Assurance Program G. Block, Manager, Engineering Assurance Program T. McCormick, Team Leader, Construction Assurance Program 2. General NRC Region V Inspection Report 50-508/86-01 provided comments and accepted the licensee's Construction Assurance Program (CAP) for its Readiness Review of WNP-3. The licensee had performed its reviews for

AP Module No. 1, earthwork, ead met with the NRC to briefly describe ats review and finding Attachment I was the agenda for the meeting. The licensee discussed the format for its Module Report to the NRC. Attachment 2 is a sample table of contents for the report. The licensee stated that the CAP Module 1 Report would be submitted by mid-September, 1986, and would be requesting completion of NRC review by the end of the yea The licensee also briefly discussed its Engineering Assurance Program  !

(EAP) and updated the staff on its action regarding EAP Module 1, piping  !

and pipe support, and findings to date. The Readiness Review team is obtaining site management and A/E evaluation and disposition for I discrepancies identified by the EAP piping and pipe supports review  :

team. The licensee stated that revised schedules for EAP and CAP activities would be submitted to Region l t

L

i

_ _ _ _ _ _ _ _ _ __ __ _ _ _.__.___________..._ _______ _ ______. _ _ _ _____

__ _ _ - ___

,

'

'

Attachment 1

. .

.

.

AGENDA SUPPLY SYSTEM READIESS REVIEW PROGRAM

E ETING WITH setc REGI0t' V i

August 1, 1986

1. EARTHWORK MODULE

-

Introduction

-

Definition and Extent of Module

-

Report Format

-

Mount of Detail

-

Exanples -

-

Letter of Transmittal 2. PIPING / PIPE SUPPORTS MODULE

-

S't atus

-

Outstanding Items

-

Ex amples

-

C tails

!

I i

__ .,._ .. . . _ . . _ , . ,_-_ - - , _ , . .. . . _ . ,_ __, . . . _ . _ . , . _ . - , _ _

s

'

,

. .

FINAL MODULE REPORT FOR EARTHWORK MODULE C3-01 TABLE OF CONTENTS INTRODUCTION EXECUTIVE SUMMARY EAP SUMMARY REPORT ON EARTHWORK

't . 0 REVIEW PROGRAM DESCRIPTION PROGRAM MANAGEE NT METHODOLOGY PROGRAM RESULTS CONCLUSIONS AND RECOMMENDATIONS OVERSIGHT COMMITTEE ASSESSMENT APPENDICES

?

c n

~

.