March 16, 2020
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000498/2020011 AND 05000499/2020011
Dear Mr. Powell:
On February 13, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000498 and 05000499
License Numbers:
Report Numbers:
05000498/2020011 and 05000499/2020011
Enterprise Identifier: I-2020-011-0003
Licensee:
STP Nuclear Operating Company
Facility:
South Texas Project, Units 1 and 2
Location:
Wadsworth, Texas
Inspection Dates:
January 27, 2020, to February 13, 2020
Inspectors:
J. Drake, Senior Reactor Inspector
J. Mateychick, Senior Reactor Inspector
G. Pick, Senior Reactor Inspector
Approved By:
Nicholas H. Taylor, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at South Texas Project, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.21N.05 - Fire Protection Team Inspection (FPTI)
SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)===
The inspectors verified that the following components and/or systems will function as required to support the credited functions stated for each sample.
- (1) Auxiliary feedwater system and the steam generator power operated relief valves.
- (2) The fire water system including the fire water tanks, fire pumps, and yard loop distribution piping system.
- (3) The fire detection systems, manually actuated pre-action system, and automatic wet pipe sprinkler systems installed on the 35 foot elevation of the electrical auxiliary building.
- (4) The Class 1E 125 VDC electrical system.
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected controls are implemented in accordance with the licensees current licensing basis and have adequate implementing procedures.
- (1) The inspectors reviewed the licensee's administrative controls of hot work, transient combustibles, and fire impairments.
- (2) The inspectors reviewed the licensee's fire brigade training program and observed a fire brigade drill.
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors evaluated the licensee's procedures controlling modifications and procedure revisions for adequacy in reviewing potential impacts to the fire protection program.
- (1) The inspectors reviewed the modification replacing the fire water pumps.
- (2) The inspectors reviewed the procedure revisions concerning the alignment of the auxiliary feedwater system and reestablishment of reactor coolant pump seal injection.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
On February 13, 2020, the inspectors presented the triennial fire protection inspection results to Mr. G. Powell and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Calculations
MC-06108
Fire Protection Available Pressure
MC-6163
Penetration Seals for HELBA and Flooding
MC-6184
Fire Protection Underground Loop
MC-6285
Single Fire Pump Operation Available Pressure
NC 9707
Facility Response Analysis for EAB Flooding and Spray
Effects
NC-07079
Fire Hazards Analysis
NC07085
Safety Grade Cold Shutdown Analysis
NC09006
Offsite Toxic Gas Analysis
NC09015
Control Room Habitability Effects
Corrective Action
Documents
03-17841, 07-2887, 16-1488, 16-4909, 17-1408, 17-1581,
17-1786-1, 17-24176-8, 17-24349,17-463, 18-10227,
18-10755, 18-11154, 18-11175, 18-2201-1, 18-3226,
18-7676, 18-9363, 18-9443, 18-9556, 18-9664,
18-9664-4, 19-0111, 19-11330, 19-11331, 19-1137,
19-1140, 19-1179, 19-13045, 19-13927, 19-13928,
19-13929, 19-13930, 19-13945, 19-14031, 19-14079,
19-2023,19-276, 19-3428, 19-3430, 19-3681, 19-4932-2,
19-4932-3, 19-7919, 19-8274, 19-9088, 19-9182, 20-1466
Corrective Action
Documents
Resulting from
Inspection
20-245,20-253, 20-1038, 20-1079, 20-1080, 20-1088,
20-1157, 20-1466, 20-1619, 20-1622, 20-1707, 20-1729,
20-1746, 20-1766
Drawings
1E0AM11
MBD QDPS AMSAC Interfaces
1E0AM14
MBD AMSAC Interface Train A
1E0AM14
MBD AMSAC Interface Train B
1E0AM14
MBD AMSAC Interface Train C
5R179F05005
Piping and Instrumentation Diagram Chemical and
Volume Control System
5R179F05006
Piping and Instrumentation Diagram Chemical and
Volume Control System
5R179F05007
Piping and Instrumentation Diagram Chemical and
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Volume Control System
9E0AF01
Auxiliary Feedwater Pumps 11, 12, & 13
9E0AF01
Auxiliary Feedwater Pumps
9E0DJAE
25VDC CLASS 1E DP PL039A,B,C PL040A (EAB)
9E0MS18
STM GEN A,B,C PORV PV7411, 7421, 7431 HYD
PMP (1)
9E0MS19
STM GEN A,B,C,D PORV SERVO AMP PY7411, 7421,
7431, 7441
9E0PKAA
4160 Class 1E swgr E1A
9E0PKAB
4160 Class 1E swgr E1B
9E0PKAC
4160 Class 1E swgr E1C
9E0VAAA
VITAL 120VAC DP PANELS DP001 DP1201
CHANNEL 1 (EAB)
9E0VAAB
VITAL 120VAC DP PANELS DP1202 DP1204 CHANNEL
II III (EAB)
9E0VAAC
VITAL 120VAC DP PANELS DP002 DP1204
CHANNEL IV (EAB)
Engineering
Changes
11-30739-4
Addition of a Stilling Well to the Fire Water Storage Tanks
- 1 Level Tree
11/17/2012
2-11658-28
FLEX Modification for Two Diesel Generators and Load
Distribution Panel with Enclosure and Supporting
Facilities
11/25/2014
18-2201-1
Fire Detector Functionality
18-7676-10
Replacement of Diesel Fire Pump #2
18-9443-3
Replacement of Diesel Fire Pump #1
18-9664-4
Hose Station and Hose Reel Isolation Valve Replacement 0
18-9664-5
Approve Alternate Angle Isolation Valve
19-111-2
Replacement of Diesel Fire Pump #3
Engineering
Evaluations
Condition Report
Engineering
Evaluation 18-
11175-1
Supplement 1
Fire Protection Testing and Maintenance
1/17/2019
Miscellaneous
South Texas Project Fire Hazards Analysis Report
Amendment
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
List of Active Transient Fire Load Permits
2/11/2020
List of Active Fire Protection Impairment Permits
2/11/2020
7A369MB01033
Fire Hazards System Design Basis Document
AE-NOC-
15002636
Safety Evaluation
2/13/2015
Condition Report
Engineering
Evaluation
(CREE) 19-3430-
The Effect of a Longer Cooldown Duration on the Design
Basis MSLB Dose Analysis
5/18/2019
ESP100.71
South Texas Project's FLEX Strategies
FBTG001
Fire Brigade Training Guideline
FLEX-0001
Diverse and Flexible Coping Strategies (FLEX) Program
Document
LER-03-006
Unanalyzed Condition that Significantly Degraded Plant
Safety Regarding the Natural Circulation Cool Down Rate
2/09/2004
Lesson Plan
FBT0001.28
Fire Preplan
Lesson Plan
FBT001.27
Lesson Plan
FBT001.33
Water Supply System
Lesson Plan
FBT001.34
Sprinkler Systems
Lesson Plan
FBT001.35
Hoses and Nozzles
Lesson Plan
FBT001.42
Fire Suppression Techniques
Lesson Plan
FBT001/36
Fire Streams
STP-CP-004
Analysis of Two Fire Hazard Events
& 1
VTD-A968-0021
Timeline and Manual Action Feasibility Report for STP
Procedures
License Compliance Review
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Controlled System or Barrier Impairment
0001A
Hot Work Program
STPEGS Fire Brigade
Fire Prevention Surveys
Fire Protection System Functionality Requirements
Control of Transient Fire Loads and Use of Combustible
and Flammable Liquids and Gases
0PGP03-ZO-0057 Operator Time Critical Action Program
3, 4, & 5
Fire Protection Training and Qualification Program
Standard Design Process Interface Procedure
0PMP04-FP-0006 Fire Damper Visual Inspection
Fire Protection System Operation
0POP04-ZO-0008 Fire/Explosion
Diesel Fire Pump Test
Fire Brigade Equipment Examinations
Fire Protection System Functionality Test
Fire Protection System Flush
Fire Protection System Flow Test
Fire Protection Water System Functional Test
18, 20, & 22
Sprinkler/Spray System Visual Inspection
Deluge Water Spray System Air Flow Test
Deluge Water Spray/Automatic Sprinkler Valve Actuation
Verification and Valve Reset
Fire Barrier Penetration Seal Visual Examination
Fire Rated Assembly Visual Examination
IP-ENG-001
Standard Design Process (SDP)
MEG-0101
Penetration Seals
Self-
Assessments
19-9212
2019 Fire Protection Self-Assessment
9/26/2019
Work Orders
441230 453685 503739 505666 514051 517620
27514 527928 534303 535716 538678 538721
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
539520 545649 545807 547253 551237 551650
2120 553860 553860 555468 558038 562239
564738 566147 567882 568409 569597 571744
2025 573155 575083 575480 591973 594819