March 16, 2020

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 AND 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000498/2020011 AND 05000499/2020011

Dear Mr. Powell:

On February 13, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000498 and 05000499

License Numbers:

NPF-76 and NPF-80

Report Numbers:

05000498/2020011 and 05000499/2020011

Enterprise Identifier: I-2020-011-0003

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project, Units 1 and 2

Location:

Wadsworth, Texas

Inspection Dates:

January 27, 2020, to February 13, 2020

Inspectors:

J. Drake, Senior Reactor Inspector

J. Mateychick, Senior Reactor Inspector

G. Pick, Senior Reactor Inspector

Approved By:

Nicholas H. Taylor, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at South Texas Project, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)===

The inspectors verified that the following components and/or systems will function as required to support the credited functions stated for each sample.

(1) Auxiliary feedwater system and the steam generator power operated relief valves.
(2) The fire water system including the fire water tanks, fire pumps, and yard loop distribution piping system.
(3) The fire detection systems, manually actuated pre-action system, and automatic wet pipe sprinkler systems installed on the 35 foot elevation of the electrical auxiliary building.
(4) The Class 1E 125 VDC electrical system.

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected controls are implemented in accordance with the licensees current licensing basis and have adequate implementing procedures.

(1) The inspectors reviewed the licensee's administrative controls of hot work, transient combustibles, and fire impairments.
(2) The inspectors reviewed the licensee's fire brigade training program and observed a fire brigade drill.

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors evaluated the licensee's procedures controlling modifications and procedure revisions for adequacy in reviewing potential impacts to the fire protection program.

(1) The inspectors reviewed the modification replacing the fire water pumps.
(2) The inspectors reviewed the procedure revisions concerning the alignment of the auxiliary feedwater system and reestablishment of reactor coolant pump seal injection.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

On February 13, 2020, the inspectors presented the triennial fire protection inspection results to Mr. G. Powell and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Calculations

MC-06108

Fire Protection Available Pressure

MC-6163

Penetration Seals for HELBA and Flooding

MC-6184

Fire Protection Underground Loop

MC-6285

Single Fire Pump Operation Available Pressure

NC 9707

Facility Response Analysis for EAB Flooding and Spray

Effects

NC-07079

Fire Hazards Analysis

NC07085

Safety Grade Cold Shutdown Analysis

NC09006

Offsite Toxic Gas Analysis

NC09015

Control Room Habitability Effects

Corrective Action

Documents

03-17841, 07-2887, 16-1488, 16-4909, 17-1408, 17-1581,

17-1786-1, 17-24176-8, 17-24349,17-463, 18-10227,

18-10755, 18-11154, 18-11175, 18-2201-1, 18-3226,

18-7676, 18-9363, 18-9443, 18-9556, 18-9664,

18-9664-4, 19-0111, 19-11330, 19-11331, 19-1137,

19-1140, 19-1179, 19-13045, 19-13927, 19-13928,

19-13929, 19-13930, 19-13945, 19-14031, 19-14079,

19-2023,19-276, 19-3428, 19-3430, 19-3681, 19-4932-2,

19-4932-3, 19-7919, 19-8274, 19-9088, 19-9182, 20-1466

Corrective Action

Documents

Resulting from

Inspection

20-245,20-253, 20-1038, 20-1079, 20-1080, 20-1088,

20-1157, 20-1466, 20-1619, 20-1622, 20-1707, 20-1729,

20-1746, 20-1766

Drawings

1E0AM11

MBD QDPS AMSAC Interfaces

1E0AM14

MBD AMSAC Interface Train A

1E0AM14

MBD AMSAC Interface Train B

1E0AM14

MBD AMSAC Interface Train C

5R179F05005

Piping and Instrumentation Diagram Chemical and

Volume Control System

5R179F05006

Piping and Instrumentation Diagram Chemical and

Volume Control System

5R179F05007

Piping and Instrumentation Diagram Chemical and

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Volume Control System

9E0AF01

Auxiliary Feedwater Pumps 11, 12, & 13

9E0AF01

Auxiliary Feedwater Pumps

9E0DJAE

25VDC CLASS 1E DP PL039A,B,C PL040A (EAB)

9E0MS18

STM GEN A,B,C PORV PV7411, 7421, 7431 HYD

PMP (1)

9E0MS19

STM GEN A,B,C,D PORV SERVO AMP PY7411, 7421,

7431, 7441

9E0PKAA

4160 Class 1E swgr E1A

9E0PKAB

4160 Class 1E swgr E1B

9E0PKAC

4160 Class 1E swgr E1C

9E0VAAA

VITAL 120VAC DP PANELS DP001 DP1201

CHANNEL 1 (EAB)

9E0VAAB

VITAL 120VAC DP PANELS DP1202 DP1204 CHANNEL

II III (EAB)

9E0VAAC

VITAL 120VAC DP PANELS DP002 DP1204

CHANNEL IV (EAB)

Engineering

Changes

11-30739-4

Addition of a Stilling Well to the Fire Water Storage Tanks

  1. 1 Level Tree

11/17/2012

2-11658-28

FLEX Modification for Two Diesel Generators and Load

Distribution Panel with Enclosure and Supporting

Facilities

11/25/2014

18-2201-1

Fire Detector Functionality

18-7676-10

Replacement of Diesel Fire Pump #2

18-9443-3

Replacement of Diesel Fire Pump #1

18-9664-4

Hose Station and Hose Reel Isolation Valve Replacement 0

18-9664-5

Approve Alternate Angle Isolation Valve

19-111-2

Replacement of Diesel Fire Pump #3

Engineering

Evaluations

Condition Report

Engineering

Evaluation 18-

11175-1

Supplement 1

Fire Protection Testing and Maintenance

1/17/2019

Miscellaneous

South Texas Project Fire Hazards Analysis Report

Amendment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

List of Active Transient Fire Load Permits

2/11/2020

List of Active Fire Protection Impairment Permits

2/11/2020

7A369MB01033

Fire Hazards System Design Basis Document

AE-NOC-

15002636

Safety Evaluation

2/13/2015

Condition Report

Engineering

Evaluation

(CREE) 19-3430-

The Effect of a Longer Cooldown Duration on the Design

Basis MSLB Dose Analysis

5/18/2019

ESP100.71

South Texas Project's FLEX Strategies

FBTG001

Fire Brigade Training Guideline

FLEX-0001

Diverse and Flexible Coping Strategies (FLEX) Program

Document

LER-03-006

Unanalyzed Condition that Significantly Degraded Plant

Safety Regarding the Natural Circulation Cool Down Rate

2/09/2004

Lesson Plan

FBT0001.28

Fire Preplan

Lesson Plan

FBT001.27

Fire Protection Program

Lesson Plan

FBT001.33

Water Supply System

Lesson Plan

FBT001.34

Sprinkler Systems

Lesson Plan

FBT001.35

Hoses and Nozzles

Lesson Plan

FBT001.42

Fire Suppression Techniques

Lesson Plan

FBT001/36

Fire Streams

STP-CP-004

Analysis of Two Fire Hazard Events

& 1

VTD-A968-0021

Timeline and Manual Action Feasibility Report for STP

Procedures

0PAP01-ZA-0103

License Compliance Review

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0PGP03-ZA-0514

Controlled System or Barrier Impairment

0PGP03-ZF-0001

Fire Protection Program

0PGP03-ZF-

0001A

Hot Work Program

0PGP03-ZF-0011

STPEGS Fire Brigade

0PGP03-ZF-0014

Fire Prevention Surveys

0PGP03-ZF-0018

Fire Protection System Functionality Requirements

0PGP03-ZF-0019

Control of Transient Fire Loads and Use of Combustible

and Flammable Liquids and Gases

0PGP03-ZO-0057 Operator Time Critical Action Program

3, 4, & 5

0PGP03-ZT-0103

Fire Protection Training and Qualification Program

0PGP04-ZE-0409

Standard Design Process Interface Procedure

0PMP04-FP-0006 Fire Damper Visual Inspection

0POP02-FP-0001

Fire Protection System Operation

0POP04-ZO-0008 Fire/Explosion

0POP07-FP-0001

Diesel Fire Pump Test

0PTP03-FP-0021

Fire Brigade Equipment Examinations

0PTP03-FP-0101

Fire Protection System Functionality Test

0PTP03-FP-0103

Fire Protection System Flush

0PTP03-FP-0105

Fire Protection System Flow Test

0PTP03-FP-0106

Fire Protection Water System Functional Test

18, 20, & 22

0PTP03-FP-0109

Sprinkler/Spray System Visual Inspection

0PTP03-FP-0110

Deluge Water Spray System Air Flow Test

0PTP03-FP-0111

Deluge Water Spray/Automatic Sprinkler Valve Actuation

Verification and Valve Reset

0PTP03-FP-0123

Fire Barrier Penetration Seal Visual Examination

0PTP03-FP-0125

Fire Rated Assembly Visual Examination

IP-ENG-001

Standard Design Process (SDP)

MEG-0101

Penetration Seals

Self-

Assessments

19-9212

2019 Fire Protection Self-Assessment

9/26/2019

Work Orders

441230 453685 503739 505666 514051 517620

27514 527928 534303 535716 538678 538721

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

539520 545649 545807 547253 551237 551650

2120 553860 553860 555468 558038 562239

564738 566147 567882 568409 569597 571744

2025 573155 575083 575480 591973 594819