IR 05000498/2020411

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000498/2020411 and 05000499/2020411
ML20260H123
Person / Time
Site: South Texas  
Issue date: 09/16/2020
From: Ray Kellar
Plant Support Branch-1
To: Gerry Powell
South Texas
References
IR 2020411
Download: ML20260H123 (7)


Text

September 16, 2020

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000498/2020411 AND 05000499/2020411

Dear Mr. Powell:

On August 27, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project Electric Generating Station, Units 1 and 2, and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000498 and 05000499

License Numbers:

NPF-76 and NPF-80

Report Numbers:

05000498/2020411 and 05000499/2020411

Enterprise Identifier: I-2020-411-0010

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project Electric Generating Station, Units 1 and 2

Location:

Wadsworth, Texas

Inspection Dates:

August 24, 2020 to August 28, 2020

Inspectors:

M. Chambers, Physical Security Inspector

J. Larsen, Senior Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security training program through completion of the following procedure elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: Four Requirements (02.09 a, 02.11 a-c, 02.12 a)
  • Tier III: Three Requirements (02.14, 02.15 a-b)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===procedure elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: None
  • Tier III: None

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 27, 2020, the inspectors presented the security baseline inspection results to Mr. G. T. Powell, President and CEO, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Corrective Action

Documents

18-11402, 19-

20, 19-9667, 20-

85,20-573, 20-

9096

STP Nuclear Operating Company Condition Record

Miscellaneous

Security

Instruction 2002

Security Force Weapons Control

Revision 26

Security

Instruction 2101

Overly Vehicle Barrier System Operation

Revision 34

Security

Instruction 2201

Patrol and Alarm Response

Revision 37

Security

Instruction 2402

Alarm Station Operator

Revision 31

Security

Instruction 3201

Protected Area Lighting Test

Revision 7

Security

Instruction 3301

Protected Area Intrusion Detection System (PAIDS)

Performance Testing

Revision 8

Security

Instruction 3304

Infrared Electrical Test

Revision 3

Security

Instruction 3411

Non-Access Door Electrical Test

Revision 2

Security

Instruction 3412

Access Door Electrical Test

Revision 4

Security

Instruction 3502

Entry Scan 4 Explosive Detector Testing

Revision 1

Security

Instruction 3701

Security Equipment Operability Tests

Revision 40

Security

Instruction 3702

Explosive Detector Operability Tests

Revision 5

Procedures

0PGP03-ZS-0016 Implementing Procedure for Security Personnel Training and

Qualification

Revision 6

OPGP03-ZS-

7358

Safety/Security Interface Program

Revision 3

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Self-Assessments 19-09

Physical/Cyber Security Quality Audit Report

10/03/2019

Work Orders

PMWO 551215

Test/Inspect/Lubricate Gate Barrier

05/02/2018

PMWO 601777

Explosive Detector Monthly Maintenance

08/06/2020

PMWO 604887

Camera Maintenance

07/21/2020

PMWO 604891

Master/Secondary Pole Testing

07/20/2020

PMWO 605307

Alarm Door Magnetic Switch

07/27/2020

PMWO 605746

Remote Multiplexer Cabinet

08/05/2020

71130.07

Miscellaneous

Site Handgun, Rifle, Day, Night, and Reduced Light

Qualification Courses

20

Course Attendance Roster for NST213 Phase 3 Night

Qualification

9/5/2019

Cert No. 2185,

2187

Re-qualification Check out Card 2020/Phase 2

Revision 1

Certification No.

1480

Officer Initial Qualification Checkout Card (Combined Tasks)

Revision 3

NST211.01

Security Annual

Written Exam

Results

3/1/2020

SPLP 28.00

Protective Equipment Lesson Plan

Revision 4

SPLP 29.0

Tactical Course Lesson Plan

Revision 4

Procedures

Security

Instruction 1002

Security Training Lesson Plans and QCCs

Revision 10

Security

Instruction 5300

Law Enforcement Training & Qualification Guideline

Revision 7

SPLP 24.00

Perform Non-Lethal Defense Measures Lesson Plan

Revision 5