U. S. NUCLEAR REGULATORY COMMISSION
-
OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report No. 50-498/80-23 50-499/80-23 Docket No. 50-498; 50-499 Category A2 Licensee: Houston Lighting and Power Company Post Office Box 1700 Houston, Texas 77001 Facility Name:
South Texas Project, Units 1 and 2 Inspection at:
South Texas Project, Matagorda, Texas Inspection conducted: August 1980
/
'M6 9- /2 - f'O Inspecto
-
R. S. FTiillips, Resident Reactor Inspector Date Approved:
--
.9!/2!8d W. A. Crossman, Chief, Projects Section Date Inspection Summary:
Inspection of August 1980 (Report 50-498/80-23: 50-499/80-23)
Areas Insoected: Routine, announced inspection by tne Resident Reactor Inspector (RRI) included independent inspection performed during site tours, follow-up inspections relative to noncompliances, unresolved matters and show cause order items.
This inspection involved sixty-three (63)
inspector hours by one NRC inspector.
Results:
No items of noncompliance or deviations or unresolved matters were identified.
,
/fd 8011100
__
..
DETAILS 1.
Persons Contacted Principal Licensee Emoloyees
,
R.'A. Frazar, Quality Assurance Manager L. D. Wilson, Project QA Supervisor (Mechanical)
J. W. Soward, QC Supervisor T. J. Jordan, Supervisor Quality Systems R. A. Carvel, Project GA Supervisor (Civil /Structurall D. W. Bohner, Project QA Supervisor (Electrical)
2.
Licensee Action on Previous Inspection Findings On August 19, 1980, the NRC held a public meeting in Bay City, Texas, to discuss with the licensee and contractor their actions taken to date relative to the NRC Show Cause Order to RL&P dated April 30, 1980.
NRC Headquarters and Regton IV staff personnel reviewed the response to the Order and discussed areas which required clarification or additional information. The second part of the meeting was devoted to answering any questions posed by the people of Bay City and other interested ci tizens.
On August 20, 1980, a Region IV follow-up inspection task force was
"
fonned to assure an organized 4pproach relative to the review of Investigation Report 50-49'8/79-17; 50-499/79-19, Appendix A Items of Noncomplinaces and Unresolved Items.
Four Region IV inspectors, including the RRI, were assigned to the task force and each member was assigned
all open items.
On August 21, 1980, the RRI sent an interoffice memo to the HL&P QA Manager advising him of open items assigned to each team member.
The memo requested that the licensee review the open items listed and indicate those items which were ready to close.
The licensee letter, dated August 28, 1980, from Mr. G. W. Oprea, Jr., HL&P Executive Vice President to Mr. Karl Seyfrit, NRC Region IV Director,1tsted completed commitments ready for review.
3.
Site Tours The RRI inspected various site areas as follows:
Units 1 and 2 Reactor Containment, Auxiliary and. Fuel Handling Buildings; Warehouses A, B, ano C; Calibration Laboratory; Concrete Batch Plant, Pittsburg Test Laboratory; and various laydown areas for reinforcement har, structural steel embeds,
>
and piping,
,
No items of noncompliance or deviations were identifie,
.
.
_.
._
_ _
..
__ _
..
-2-4.
Management Meetings The following meetings were held during the subject inspection period.
Attendees Subject Date HL&P QA Mgr; Allegations regarding PPM 8-4-80 RIV and Resident records and piping design Inspector i
HL&P QA Mgr; Concrete pour delay because of 8-5-80 l
Resident Inspector a concern relative to stainless j
steel fuel pool liner plate j
being in contact with the car 5on steel stiffners welded i
behind the liner plate.
l HL&P Construction Action taken relative to 8-4-80
'
Mgr, B&R Construction allegations on PPM records.
!
Mgr; Resident Inspector HL&P Mgr., Resident Licensee advised RRI of QC 8-14-80 Inspector Record wtth a false entry.
QC inspector was termint.ted.
j NRC Headquarters Show Cacse Response 8-18-80 j
& Region, IV Personnel i
NRC Meeting with Show Cause Response; answered 8-19-80
Licensee, Contractor questions asked by public.
i Personnel & public.
!