7C/
.
.
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report No. 50-498/80-37; 50-499/80-37 Docket No. 50-498; 50-499 Category A2 Licensee: Houston Lighting and Power Company Post Office Box 1700 Houston, Tex 6s 77001 Facility Name:
South Texas oroject, Units 1 and 2 Meeting at: Arlington, Texas, Region IV Office (Novecter 18,1980)
NRC Participants:
// 4/SC f tj K. V. Seyfrit, Dire Region IV Date
/
-
$l Y ihi f;,
W. C. Seidle, Chief, Reactor Construction and Date Enginee dng Support Branch
/!/o m-N W. A. Crossman, Chief, Projects Section Date s'
.
//
ll1D R. E. Hall', Chief, Engineering Support Section Date v _
M!2/db Approved:
W. A. Crossman, Chief, Projects Section Date Meeting Summary:
Meeting on November 18, 1980 (Recort No. 50-498/80-38: 50-499/80-37)
Meeting Topics:
Announced meeting with corporate staff memoers of Houston Lighting and Power Company and Brown & Root Company, Inc. to discuss the status of Show Cause Order items and limited work restart.
"101100 76p
,
.
DETAILS 1.
Persons Attending Meeting Houston Lighting and Powcr Company (HL&P)
J. H. Goldberg, Vice President, Nuclear Engineering and Construction D. G. Barker, Manager, South Texas Project R. A. Frazar, QA Manager Brown and Root Company, Inc. (B&R)
K. M. Broom, Senior Vice President J. R. Geurts, Vice President and Project General Manager S. H. Grote, Senior Vice President, Power Group R. J. Vurpillat, Power Group QA Manager NRC Participants K. V. Seyfrit, Director, Region IV W. C. Seidle, Chief, Reactor Construction & Engineering Support Branch W. A. Crossman, Chief, Projects Section R. E. Hall, Chief, Engineering Support Section 2.
Meeting with Corporate Staff a.
Purpose of Meeting The purpose of this meeting was to discuss status of Show Cause items and restart of limited work.
b.
Stat'..s of Restart of Limited Work On Jctober 2,1980, HL&P requested limited restart of work in the areas of AWS welding, ASME welding, and placement of complex concrete.
Inspection of implementation of corrective actions in the above areas indicated that only the AWS welding program was complete enough to allow limited restart.
Consequently, on October 3,1980, an IAL was issued for restart of a specific amount of AWS welding.
A request was made on October 17, 1980, and the increment of AWS welding was extended by IAL on October 22, 1980.
An updated request for resumption of limited complex concrete place-ment was made by telephone on October 24, 1980, and followed up by letter on November 3,1980, but it was subsequently determined that there were several outstanding incomplete corrective actions, including inspection of the testing laboratory, specific provisions for control of correlation testing of concrete and several ADRs and NCRs.
Consequently, the Region IV staff did not concur with the request to restart limited complex concrete placement.
-2-
.
.
-
,
.
.-
!
c.
Discussion The implementation of corrective act. ions in regard to the Show Cause items with respect to limited restart of work as described above was discussed.
The RIV Director emphasized the need for the licensee and his constructor to thoroughly exadne all areas of concern in anticipation of restart of limit 9d work and maintain detailed communications with RIV in regard to status of completion of outstanding comitments.
The licensee attendees acknowledged the basic problems outlined and agreed to closer communications with the RIV staff and within the licensee / constructor staffs.
,
f
!
!
!
l
[
!
l
[
-3-
..
.
._
.