IE Insp Repts 50-498/80-16 & 50-499/80-16 During June 1980. No Noncompliance Noted.Major Areas Inspected:Insp of safety- Related Components,Containment Structural Steel Welding,Qa Records Sys & Mgt Meetings
ML19343A424
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/16/1980
From: Crossman W, Phillips H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19343A418 List:
References
50-498-80-16, 50-499-80-16, NUDOCS 8009170385
Download: ML19343A424 (5)


Text

'

,

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region IV Report No. 50-498/80-16; 50-499/80-16 Docket No. 50-498; 50-499 Category A2 Licensee:

Houston Lighting and Power Compdny Post Office Box 1700 Houston, Texas 77001 Facility Name:

South Texas Project, Units 1 and ?

Inspection at:

South Texas Project, Matagorda County, Texas Inspection conducted: June 1980 Inspectcr:

W4-7[//I'6 H. S. Phillips, Reddent Reactor Inspector Date 7// h Approved:

e W. A. Crossman, Chief, Projects Section D' ate '

Inspection Summary:

Inspection during June 1980 (Report No. 50-498/80-16; 50-499/80-16)

Areas Inspected:

Routine, announced inspection by the Resident Reactor Inspector (RRI) included independent inspection performed during sits tours; follow-up inspections relative to noncompliances and unresolved matters; inspection of safety-related components, containment structural steel welding, QA records system; and management meetings.

This inspection involved fifty-seven inspector-hours by one NRC inspector.

Results:

No items of noncompliance or deviations were identified.

,

8009170ggy

r. -

,

'

,

DETAILS 1.

Persons Contacted Principal Licensee Employees

  • G. W. Oprea, Executive Vice President
  • R. A. Frazar, Quality Assurance hanager
  • J. W. Briskin, Manager Houston Operations
  • R. l. Ulrey, Support QA Manager
  • A. H. Guttermin, Attorney W. N. Phillips, Projects QA Manager L. D. Wilson, Site QA Supervisor J. W. Soward, Lead QA Specialist M. S. Monteith, QA' Specialist T. J. Jordan, Supervisor Quality Systems Brown & Root, Inc. (B&R) Employees
  • K. M. Broom, Senior Vice~ President
  • J. L. Hawks, Engineering Project Manager

.

Management Analysis Company (MAC)

  • J. P. Jackso-Carior Vice President
  • L. E. Zwist

. President Bechtel

  • J. M. Amaral, QA Manager The RRI also talked with and interviewed several other licensee and contractor employees, including members of the quality, technical and engineering staffs.
  • Denotes those attending management meeting at the Region IV office.

2.

Licensee Action on Previous Inspection Findings (0 pen) Noncompliances, Unresolved Items and Show Cause Letter (50-498/

79-19; 50-499/79-19):

Special-investigation of alleged threats / harassment and assessment of the effectiveness of the QA program.

The RRI attended several meetings both on and off site relative to inspection findings which were documented in the above referenced report.

Follow-up inspection results were documented as follows:

_2_

-

.

.

NRC Document Date of Meeting / Inspection Summary of Results Report No.

June 23 and 26, 1980 Three of six items of 50-498/80-17; noncompliance closed.

50-499/80-17 See NRC report for technical details.

Docket No. 50-498; June 30, 1980 HL&P outlined actions 50-499, memo for for responding to File, dated 7/2/80 Show Cause Order Items 5, 6, 7, 8 and 9.

3.

Site Tours The RRI inspected various site areas as follows: Units 1 and 2 Reactor Containment, Mechanical Electrical and Fuel Handling Buildings; Essential Cooling Pond; various laydown areas; the steam generator receiving and laydown areas.

Inside storage areas (Warehouse A thru E) were inspected.

The B&R CA records vault, document control center, QA/QC work areas were also inspected.

No items of noncompliance or deviations were identified.

4.

Reactor Pressure Vessels (RPV)

Unit 1 RPV is stored in place and access into it is controlled.

Unit 2 RPV is stored outside on dunnage.

The desiccant indicator showed that the desiccant inside the vessel was in good condition.

No items of noncompliance or de viations were identified.

5.

Steam Generator, Westinghouse Model

"EZ", Lift and Transport The RRI observed the prelift, lift and transport activities of one of two Unit 2 steam generators received by barge.

The whole operation went smoothly. The steam generators were placed in outside storage.

The RRI reviewed the following documents controlling the activities:

a.

Special Rigging Instructions, SRI 0014, Revision 0, which described detailed instructions for preparation, including equipment certifi-cation, inspection and testing, lifting and transporting, b.

Nine Test Certificates, Yarbrough Cable Service, Inc., Certificates No. 9P-740 through 9P-749 (less 9P-745).

c.

Prelift Review - Training on SRI 0014.

d.

Crawler Transporter Memo to file, dated June 18, 1980, subject:

Equipment for Transporting Unit II Steam Generator.

-3-

,.

e.

Rigging Test Data Form.

f.

B&R Examination Check - Visual of Slings.

g.

NDE Magnetic Particle Report - 200 and 600 Ton Lifting Hooks.

h.

Maintenance Checklist, Crawlers.

No items of noncompliance or deviations were identified.

6.

Containment Structural Steel Welding The RRI reviewed welding /NDE records for Pittsburg DeMoines Contract No. 19744.

QA records for LAMC0 columns AA6, AA9, AA10, AAll, AAl2, AAl4, AA15, AA16 and AA18 were specifically reviewed to determine if all work had been finally accepted.

All records were signed April 17, 1980.

Whe e the RRI inquired as to why the records were not transferred to the QA record vault in a timely manner, the records were immediately sent to the vault.

The RRI had no further questions regarding this matter.

All welding /NDE records for LAMC0 columns were reviewed.

No items of noncompliance or deviations were identified.

7.

Review of Brown & Root QA Records System The RRI interviewed B&R personnel who are responsible for managing the QA records system.

The current procedure, which describes the records management system, is being rewritten and should be completed by June 23, 1980.

The system was checked to verify: (1) that an index of records was on file; (2) that a personnel access list was published; and (3) that records checked out were adequately protected.

The RRI determined that the above areas were controlled in accordance with procedures; however, records checked out (in one case a whole file cabinet)

were taken to areas outside the storage facility that have no fire orotection, humidity control or other features as required :y NRC Regulatory Gmde 188 and ANSI N45.2.9(9/74), a licensee commitment.

This item is unresolved pending clarification of B&R ST QAP 6.1, paragraph 4.8; i.e., control of records checked out.

The licensee will address this in response to the Show Cause Letter which resulted from Investigation Report No. 50-498/79-19; 50-499/79-19.

(Unresolved Item No. 50-498/80-16.01; 50-499/80-16.01)

No items of noncompliance or deviations were identified.

-4-

_

_

..

8.

Unresolved Items Unresolved items are matters about which more information is required in

order to ascertain whether they are acceptable items, items of noncompliance, or deviations.

One unresolved item is discussed in paragraph 7.

,

9.

Management Meetings The following meetings were held during the subject inspection period:

a Attendees Subject Date HL&P Project QA Manager Major Organizational June 2, 1980 and B&R Construction Changes Project Manager HL&P Site QA Supervisor Follow Up on Storage and June 3, 1980 and Lead Mechanical QA Maintenance Conditions Specialist HL&P QA Manager Concrete Pour C11 W90 June 4-5, 1980 and B&R Audit 51-36

.

HL&P QA Manager and Corrective Action Relative June 6, 1980 B&R Senior Vice President to NRC Investigation Report No. 50-498/79-19; 50-499/79-19 HL&P Soils Coordiantor Soil Testfill Program June 9, 1980 HL&P QA Manager, Project Review of South Texas June 11, 1980 Manager, B&R Engineering Project and Response / Action Project Manager and Repre-to NRC Findings sentatives of Congressman Bob Eckhardt HL&P QA Project Manager Organization June 20, 1980 NRC Soils Team (RI, RIII Follow Up on Noncompliances June 23-26, and RIV), HL&P Site QA and Unresolved Items Relative 1980

Supervisor, HL&P Soils to NRC Investigation Report Coordinator and B&R No. 50-498/79-19; 50-499/79-19 Engineering Project Manager NRC Investigators and Resident Allegation Relative to Welding June 26, 1980 Inspector; HL&P Senior Vice Records j

President; HL&P Site QA Supervisor and Management Analysis Company Vice President

,

Region IV Management and Show Cause Items No. 5, 6, 7, 8 June 30,1980 Resident Inspector, HL&P and 9 Manager Houston Operations,

l HL&P Support QA Manager, l

HL&P Attorney.and B&R l

Engineering Project Manager

!

-5-

_

__

__

_

.

_

_ _..