ML19339B815

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-498/80-23 & 50-499/80-23 on 800801-31.No Noncompliance Noted
ML19339B815
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/15/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML19339B816 List:
References
NUDOCS 8011100172
Download: ML19339B815 (2)


See also: IR 05000498/1980023

Text

-_.

-

7/C

/p"8%g'o,

UNITED STATES

.

NUCLEAR REGULATORY COMMISSION

JV

/^

R EGION IV

E i

  1. 'l

o

611 RYAN PLAZA ORIVE. SUITE 1000

%-

-

'j

ARLINGTON, TEXAS 76012

% . *.... *

September 15, 1980

In Reply Refer to:

RIV

Docket No. 50-498/Rpt. 80-23

50-499/Rpt. 80-23

Houston Lighting and Power Company

Attn: Mr. G. W. Oprea, Jr.

Executive Vice President

Post Office Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by our Resident Inspector, Mr. H. S.

Phillips, during the period.of August 1980 of activities authorized by NRC

Construction Permits No. CPPR-128 and 129 for the South Texas Project, Units

No.1 and 2, and to the discussion of our findings with Mr. R. A. Frazar and

other members of your str.ff during the inspection period.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

from public disclosure.

The application must include a full statement of the

reasons why it is claimed that the information is proprietary.

The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

/

801110o

g77

h

.

..J

-

~.

-2-

-

.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

. , 7 ,:

- ,.

7

.w

W. C. Setdle, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-498/80-23

50-490/60-23

5

.-

_