IR 05000461/2025005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Clinton Power Station (Report 05000461/2025005)
ML25239A333
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 08/27/2025
From: Robert Ruiz
NRC/RGN-III/DORS/RPB1
To: Rhoades D
Constellation Energy Generation
References
IR 2025005
Download: ML25239A333 (1)


Text

SUBJECT:

UPDATED INSPECTION PLAN FOR CLINTON POWER STATION (REPORT 05000461/2025005)

Dear David Rhodes:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Clinton Power Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025, (ML25042A278), the NRC determined that a broad, comprehensive review of the ROP is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.

August 27, 2025

D. Rhoades

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9732 with any questions you have regarding this letter.

Sincerely, Robert Ruiz, Chief Reactor Projects Branch 1 Division of Operating Reactor Safety Docket Nos. 05000461 and 07201046 License No. NPF-62 Enclosure:

Inspection Plan cc: Distribution via LISTSERV Signed by Ruiz, Robert on 08/27/25

D. Rhoades

Letter to David Rhoades from Robert Ruiz dated August 27, 2025.

SUBJECT:

UPDATED INSPECTION PLAN FOR CLINTON POWER STATION (REPORT 05000461/2025005)

DISTRIBUTION:

Rodney Clagg RidsNrrDorlLpl3 RidsNrrPMClinton Resource RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan John Pelchat Jared Heck Jennifer Dalzell R3-DORS ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML25239A333

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE R-III R-III NAME NShah:anm RRuiz DATE 08/27/2025 08/27/2025 OFFICIAL RECORD COPY

Site Inspection Activity Plan Clinton 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Material Control and Accounting - CLI

1 1/1/2025 12/31/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

Clinton January 2025 NRC Developed Initial License Exam

1 7/13/2025 7/19/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Emergency Preparedness Exercise Inspection / Performance Indicator Review

1 7/21/2025 7/24/2025 IP 71114.01 000716 Exercise Evaluation

7/21/2025 7/24/2025 IP 71151 001397 Performance Indicator Verification 3Q2025 ISFSI Program Review Inspection - CLI

1 7/28/2025 8/1/2025 IP 60855 Operation Of An ISFSI Security Baseline Inspection - CLI

1 8/25/2025 8/29/2025 IP 71130.07 000739 Security Training

8/25/2025 8/29/2025 IP 71130.09 001656 Security Plan Changes

8/25/2025 8/29/2025 IP 71130.14 000743 Review of Power Reactor Target Sets License Renewal Phase 1 - CLI

1 9/8/2025 9/19/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal Inservice Inspection Unit 1 - CLI

1 9/8/2025 9/19/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Radiation Protection Baseline Inspection - CLI

1 8/25/2025 10/3/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

9/15/2025 9/19/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

9/15/2025 9/19/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

9/15/2025 9/19/2025 IP 71124.04 000728 Occupational Dose Assessment Eplan and EAL Changes Review - CLI

1 11/1/2025 12/31/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Corporate Security Baseline Inspection - CLI

1 1/19/2026 1/23/2026 IP 71130.01 000733 Access Authorization

1/19/2026 1/23/2026 IP 71130.08 000740 Fitness-For-Duty Program Security Baseline Inspection - CLI

1 2/2/2026 2/6/2026 IP 71130.01 000733 Access Authorization

2/2/2026 2/6/2026 IP 71130.02 000734 Access Control

2/2/2026 2/6/2026 IP 71130.08 000740 Fitness-For-Duty Program Radiation Protection Baseline Inspection - CLI

1 2/23/2026 2/27/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Prepared on 8/20/2025 10:33:21 AM 1 of 4

Site Inspection Activity Plan

2/23/2026 2/27/2026 IP 71124.04 000728 Occupational Dose Assessment

2/23/2026 2/27/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation

2/23/2026 2/27/2026 IP 71151 000746 Performance Indicator Verification Functional Engineering Inspection - Age Related Degradation - CLI

1 3/2/2026 3/20/2026 IP 71111.21N.04 001832 Age-Related Degradation Emergency Preparedness Baseline Inspection / Performance Indicator Verification - CLI

1 3/30/2026 4/3/2026 IP 71114.02 000717 Alert and Notification System Testing

3/30/2026 4/3/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

3/30/2026 4/3/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness

3/30/2026 4/3/2026 IP 71151 001397 Performance Indicator Verification Clinton 2026 Biennial Problem Identification and Resolution Inspection

1 4/6/2026 4/24/2026 IP 71152B 000747 Problem Identification and Resolution Force-on-Force Planning and Exercise Weeks - CLI

1 6/22/2026 6/26/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

7/13/2026 7/17/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Security Baseline Inspection - CLI

1 9/28/2026 10/2/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

9/28/2026 10/2/2026 IP 71130.09 001656 Security Plan Changes

9/28/2026 10/2/2026 IP 71151 001338 Performance Indicator Verification Clinton October 2026 Biennial Requalification Program Inspection

1 10/19/2026 10/23/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EAL & EPlan Changes Review - CLI

1 11/1/2026 12/31/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Clinton November 2026 Initial License Examination

1 9/27/2026 10/2/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

11/8/2026 11/21/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

License Renewal Post Approval Phase 2 - CLI

1 11/16/2026 12/4/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal Material Control and Accountability Inspection

1 1/1/2027 6/30/2027 IP 71130.11 000742 Material Control and Accounting (MC&A)

Functional Engineering Inspection Placeholder

1 3/8/2027 3/26/2027 IP 71111.21N 000714 Focused Engineering Inspections (FEI Placeholder)

Security Baseline Inspection

1 4/19/2027 4/23/2027 IP 71130.02 000734 Access Control

4/19/2027 4/23/2027 IP 71130.05 000737 Protective Strategy Evaluation Prepared on 8/20/2025 10:33:21 AM 2 of 4

Site Inspection Activity Plan

4/19/2027 4/23/2027 IP 71130.09 001656 Security Plan Changes Radiation Protection Baseline Inspection

1 5/10/2027 5/14/2027 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

5/10/2027 5/14/2027 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Prepared on 8/20/2025 10:33:21 AM 3 of 4

Site Inspection Activity Plan Clinton Power Station 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count ISFSI Program Review Inspection

7/28/2025 8/1/2025 IP 60855 001001 Operation Of An ISFSI ISFSI Cask Loading Inspection

10/5/2026 10/9/2026 IP 60855 001001 Operation Of An ISFSI Prepared on 8/20/2025 10:33:21 AM 4 of 4