IR 05000461/2025401
| ML25091A288 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/07/2025 |
| From: | Michael Ziolkowski NRC/RGN-III/DRSS |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2025401 | |
| Download: ML25091A288 (1) | |
Text
SUBJECT:
CLINTON POWER STATION SECURITY BASELINE INSPECTION REPORT 05000461/2025401
Dear David Rhoades:
On February 27, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station and discussed the results of this inspection with Andrew Krukowski, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000461 License No. NPF-62
Enclosure:
As stated
Inspection Report
Docket Number:
05000461
License Number:
Report Number:
Enterprise Identifier:
I-2025-401-0058
Licensee:
Constellation Nuclear
Facility:
Clinton Power Station
Location:
Clinton, IL
Inspection Dates:
February 24, 2025, to February 27, 2025
Inspectors:
G. Bonano, Physical Security Inspector
Approved By:
Michael E. Ziolkowski, Chief
Security, Emergency Preparedness, and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Clinton Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
1. Tier I: All Requirements
2. Tier II: 02.06 a, d; 02.07 a; 02.08 a - e, i
3. Tier III:
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) March 31 through December 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On February 27, 2025, the inspectors presented the security baseline inspection results to Andrew Krukowski, Plant Manager and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Clinton Power Station Security Plan
Compensating for Security System Failures
Constellation Security Search Process
SY-AA-101-112-
103
ION Scanning Explosives Detector (ISED) Search Processes
SY-AA-101-112-
104
Protected Area Search Processes
SY-AA-101-112-
105
Owner Controlled Area Inspection Processes
Processing and Escorting of Personnel and Vehicles
Control of Security Access Control Devices
Security Assessment and Response to Unusual Activities
Security Events and Nuclear Regulatory Commission
Performance Indicators
SY-CL-101-112
Clinton Protected Area Vehicle Searches
Procedures
SY-CL-101-120-
F-03
Security Access Control Devices Inventory and Annual
Inspection Sheet
71151
Procedures
Security Events and Nuclear Regulatory Commission
Performance Indicators
2