SUBJECT:

CLINTON POWER STATION SECURITY BASELINE INSPECTION REPORT 05000461/2025401

Dear David Rhoades:

On February 27, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Clinton Power Station and discussed the results of this inspection with Andrew Krukowski, Plant Manager and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 05000461 License No. NPF-62

Enclosure:

As stated

Inspection Report

Docket Number:

05000461

License Number:

NPF-62

Report Number:

05000461/2025401

Enterprise Identifier:

I-2025-401-0058

Licensee:

Constellation Nuclear

Facility:

Clinton Power Station

Location:

Clinton, IL

Inspection Dates:

February 24, 2025, to February 27, 2025

Inspectors:

G. Bonano, Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Clinton Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

1. Tier I: All Requirements

2. Tier II: 02.06 a, d; 02.07 a; 02.08 a - e, i

3. Tier III:

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) March 31 through December 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 27, 2025, the inspectors presented the security baseline inspection results to Andrew Krukowski, Plant Manager and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Miscellaneous

Clinton Power Station Security Plan

SY-AA-101-102

Compensating for Security System Failures

SY-AA-101-112

Constellation Security Search Process

SY-AA-101-112-

103

ION Scanning Explosives Detector (ISED) Search Processes

SY-AA-101-112-

104

Protected Area Search Processes

SY-AA-101-112-

105

Owner Controlled Area Inspection Processes

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

SY-AA-101-120

Control of Security Access Control Devices

SY-AA-101-132

Security Assessment and Response to Unusual Activities

SY-AA-101-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

SY-CL-101-112

Clinton Protected Area Vehicle Searches

71130.02

Procedures

SY-CL-101-120-

F-03

Security Access Control Devices Inventory and Annual

Inspection Sheet

71151

Procedures

SY-AA-101-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

2