Ack Receipt of Requesting Concurrence in Plans for Lifting Stop Work Order 016 on Electrical Conduit Installation.Based on Review & Insp,Stop Work Order Can Be Lifted & Will Be Documented in IE Insp Rept 50-461/83-12
ML20024D848
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/29/1983
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
References
NUDOCS 8308080286
Download: ML20024D848 (2)


Text

{{#Wiki_filter:, , ~ . JUL 2 9 1983 Docket No. 50-461 Illinois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 References: 1.

Ltr J. G. Keppler to W. C. Gerstner dtd September 1, 1982 2.

Ltr D. P. Hall to R. L. Spessard dtd November 10, 1982 3.

Ltr R. L. Spessard to W. C. Gerstner dtd December 2, 1982 4.

Ltr R. L. Spessard to W. C. Gerstner dtd December 20, 1982 5.

Ltr D. P. Hall to J. G. Keppler dtd June 24, 1983 Gentlemen: This letter acknowledges your letter dated June 24, 1983, requesting concur-rence in your plans for lifting Stop Work Order 016 on electrical conduit installation. Based on our continuing review and site inspection on July 26-27, 1983, we have determined that you have accomplished specific prerequisites outlined in References 1, 2, and 4.

Based on our review and inspection, we concur in your lifting Stop Work 016. Results of your efforts pertaining to Reference 3 have been reviewed, are satisfactory and will be documented in Inspection Report 50-461/83-12.

It is our understanding that for all seismic Category I conduits, you will rework and reinspect as necessary all vaulted conduit travelers that were not part of Phases I, II, and III of the Stop Work 016 Recovery Plan. Those 367 conduits originally included in Phase IV of the Recovery Plan have been incor-porated into the Level III scheduling system and will be routinely inspected when required.

/ gd/ 8308080286 030729 PDR ADOCK 05000461 o PDR l " .

. _ _ . _.- _ _ . - - , * % b L c> ' Illino'is Power Company

JUL 2 9.1983 As discussed at the exit meeting on July 27, 1983, it is our understanding that-you have completed, but not documented, your comparison of conduit installation - job. instructions, and QC instructions and checklists with appropriate QA'verifi-cation. checklists and specifications to assure that the installer, QC inspector and QA inspector use compatible requirements tolerances and acceptance . criteria.. When you have documented _the results, please forward them to our resident-inspector for review.

concerning these matters.

. We will gladly discuss any questions you have

Sincerely, "O i ir g nal signed by A.B. Davis" James G. Keppler Regional Administrator cc w/1tr dtd 6/24/83: DMB/ Document Control Desk (RIDS) Resident Inspector, RIII' Phyllis Dunton, Assistant _ Attorney General . Reed Neuman,-Esq.,' Assistant ' Attorney. General Cary N. Wright, Manager . Nuclear Facility Safety: ' Jean Foy, Prairie Alliance RI ~ -RIII -. RIII, RII I I RI I RI . kC$ f.