Drone (aka Unmanned Unmanned Aerial Vehicle (UAV) or Unmanned Aerial System (UAS))
Topic |
|---|
|
|
| All by date | | | Start date | Site | Title |
|---|
| SECY-26-0022, Weekly Information Report Week Ending February 6, 2026 | 18 February 2026 | | SECY-26-0022: Weekly Information Report Week Ending February 6, 2026 | | IR 05000346/2025004 | 12 February 2026 | Davis Besse | Integrated Inspection Report 05000346/2025004 | | ML26044A167 | 11 February 2026 | | FOIA-2026-000133 - Released Set | | ML25338A168 | 4 December 2025 | | What Can the History of Function Allocation Tell Us About the Role of Automation in New Nuclear Power Plants? a Systematic Review | | ML25330A073 | 1 December 2025 | | The Office of the Inspector General for the U.S. Nuclear Regulatory Commission and Defense Nuclear Facilities Safety Board - Semiannual Report to Congress, April 1, 2025 to September 30, 2025 | | 05000346/LER-2025-001, Required Shutdown for Steam Generator Low Level Instrumentation Reference Leg Steam Leak | 9 October 2025 | Davis Besse | Required Shutdown for Steam Generator Low Level Instrumentation Reference Leg Steam Leak | | ML25258A153 | 30 September 2025 | | Research Information Letter 2025-06, NRC Workshop on Structural Materials: Research for 80 Years and Beyond, Summary Report | | ML25269A058 | 26 September 2025 | | Contract No. 31310025C0022 | | ML25273A294 | 24 September 2025 | | 06 Matt Dennis NRC NRC Ai Workshop 2025.09.24 | | SECY-25-0083, Weekly Information Report Week Ending September 12, 2025 | 24 September 2025 | | SECY-25-0083: Weekly Information Report Week Ending September 12, 2025 |
|
|---|