October 28, 2003
SUBJECT:
PERRY NUCLEAR POWER PLANT PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000440/2003011(DRS)
Dear Mr. Kanda:
On October 2, 2003, the NRC completed an inspection at your Perry Nuclear Power Plant. The enclosed report documents the inspection findings which were discussed on October 2, 2003, with Mr. Ron Rose and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, without enclosure, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Enclosure Contains Upon Separation This Page is Decontrolled Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
James R. Creed Safeguards Program Manager Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Enclosure:
Inspection Report 05000440/2003011(DRS)
( )
cc w/encl ( ):
G. Leidich, President - FENOC T. Rausch, Plant Manager, Nuclear Power Plant Department E. McNeil, (NSIR/DNS/RSS)
B. Westreich, (NSIR/DNS)
cc w/encl w/o :
K. Cimorelli, Acting Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health Enclosure Contains Upon Separation This Page is Decontrolled