July 12, 2018
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT - NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING (MC&A)
INSPECTION REPORT 05000424/2018412 AND 05000425/2018412
Dear Mr. Myers:
On June 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Vogtle Electric Generating Plant, Units 1 and 2.
The NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
This inspection examined activities conducted under your license as they related to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Enclosure transmitted herewith contains SUNSI. When separated from the Enclosure, this document is decontrolled. However, the enclosed report contains Security-Related Information, and therefore will not be made publically available in accordance with 10 CFR 2.390(d)(1).
Sincerely,
/RA/
Alan Blamey, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos. 50-424, 50-425 License Nos. NPF-68, NPF-81
Enclosure:
IR 05000424/2018412 and 05000425/2018412
cc w/encl.: See page 3 cc w/o encl.: Distribution via ListServ