IR 05000425/1979017

From kanterella
Jump to navigation Jump to search
Forwards Corrections to IE Insp Repts 40-424/79-17 & 50-425/79-17 & Notice of Violation
ML19260D837
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/28/1979
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19260D838 List:
References
NUDOCS 8002120482
Download: ML19260D837 (1)


Text

[/ Ci -

'

!(p"%'o,,

.2 m UNITED STATES

^

f.; C NUCLEAR REGULATORY COMMISSION n

E

,E REGION ll

.

%*****/[

101 MARlETT A ST N.W.. $UITE 3100 o,

,

ATLANTA, GEORGIA 30303 DEC 2 81979 In Reply Refer To:

RII:JRH 50-424 50-425 Georgia Power Company Attn:

J. H. Miller, Jr.

Executive Vice President 270 Peachtree Street Atlanta, GA 30303 Gentlemen:

Inspection Report No. 50-424/50-425/79-17 was transmitted to you by letter dated December 11, 1979.

It has been brought to our attention that certain pages in this report contained errors and/or omissions.

These pages have been corrected and are forwarded to you as enclosures to this letter.

Please replaca the original pages with these revised pages.

Sincerely, V

. C. Bryant, Acting Chief Reactor Construction and Engineering Support Branch Enclosures:

1.

Appendix A 2.

Summary / Cover Page 3.

Page 2 of Report Details cc w/encls:

K. M. Gillespie Construction Project Manager P. O. Box 282 Waynesboro, GA 30830 E. D. Groover QA Site Supervisor P. O. Box 282 1949 551 Waynesboro, GA 30830

,

D. E. Dutton Project General Manager Georgia Power Company P. O. Box 4545 Atlanta, GA 30303 800 s2eo 9Tr 2--