ML19260D841
| ML19260D841 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/28/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19260D838 | List: |
| References | |
| 50-424-79-17, 50-425-79-17, NUDOCS 8002120487 | |
| Download: ML19260D841 (1) | |
Text
.
APPENDIX A NOTICE OF VIOLATION Georgia Power Company License No. CPPR-108 Vogtle Units 1 and 2 CPPR-109 Based on the NRC inspection November 14-16 and 20-21, 1979, certain of your activities were apparently not conducted in full compliance with NRC require-ments as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by 10 CFR 50.55(e) the holder of a construction permit shall notify the Commission of each deficiency found in design and construction, which were it to have remained uncorrected, could have affected adversely the safety of operations of the nuclear power plant at anytime throughout the expected lifetime of the plant and which represents a significant deficiency in construction of, or significant damage to a structure, system or component which will require extensive evaluation, extensive redesign or extensive repair to meet the criteria and bcses stated in the safety analysis report or construction permit. The holder shall within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notify the appropriate NRC Inspection and Enforcement Regional Office of each reportable deficiency.
Contrary to the above, damage to Category I backfill and possible undermining of Class I structure foundations as a result of November 2, 1979, heavy rains was not reported until November 14, 1979. Extensive backfill repair and evaluation of the control building and Unit I and 2 reactor buildine foundations will be required.
This is an infraction.
1949 352 e00 222 0 MTR