From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8507160850
Download: ML20129E606 (2)


Text

e

$

O #

MAY 31 W Georgia Power Company ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT: REPORT NOS. 50-424/84-30, 50-425/84-30; 50-424/85-03, 50-425/85-03; AND 50-424/85-08,50-425/85-08 Thank you for your responses of April 4,1985, and May 10, 1985, to our Notice of Violation, 50-424,425/85-03-01, issued March 7,1985, concerning activities under NRC Construction Pennit Nos. CPPR-108 and CPPR-10 We have evaluated your responses and found that they meet the requirements of 10 CFR 2.20 It is our understanding that you concur with our Violation finding relative to inadequate corrective actions to ensure proper revisions of design drawings but do not consider the discrepancy identified in paragraph 6.5.(1)(b) of Inspection Report 50-424,425/85-08 to be another example of the subject Violation. We have carefully reviewed the basis of your position and concluded that the underlying basis of the subject discrepancy is design personnel not adequately completing design review. This underlying basis was also exhibited for Violations 84-30-01 and 85-03-0 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, Original Signed by David M. Verrelli for Roger D. Walker, Director Division of Reactor Projects cc: R. E. Conway, Senior Vice President Nuclear Power D. O. Foster, Vice President and General Manager Vogtle Project H. H. Gregory, III, General Manager, Vogtle Nuclear Construction i

G. Bockhold, Jr. , Vogtle l Plant Manager l L. T. Gucwa, Chief Nuclear Engineer (cc cont'd - See page 2) 73 gg Zgg j

_. -

e

, o Georgia Power Company 2 (cc cont'd)

Ruble A. Thomas, Vice President-Licensing Vogtle Project Ed Groover, Quality Assurance Site Manager C. W. Hayes, QA Manager J. T. Beckham, Vice President

& General Manager - Operations J. A. Bailey, Project Licensing Manager George F. Trowbridge, Es Shaw, Pittman, Potts and Trowbridge Bruce W. Churchill, Es Shaw, Pittman, Potts and Trowbridge Ernest L. Blake, Jr., Es Shaw, Pittman, Potts and Trowbridge James E. Joiner, Troutman, Sanders, Lockerman and Ashmore James G. Ledbetter, Commissioner Department of Human Resources Charles H. Badger, Office of Planning and Budget, Management Review Division Deppish Kirkland, III, Counsel Office of the Consumer's Utility Council Douglas C. Teper, Georgians Against Nuclear Energy Laurie Fowler, Legal Environmental Assistance Foundation Tim Johnson, Executive Director Educational Campaign for a Prosperous Georgia Morton B. Margulies, Esq., Chairman Administrative Judge, Atomic Safety and Licensing Board Panel Dr. Oscar H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel Gustave A. Linenberger, Jr., Administrative Judge, Atomic Safety and Licensing Board Panel bec: E. Reis. ELD M. Sinkule, RI!

NRC Resident Inspector Document Control Desk State of Georgia l RII RI RII RII l h,% lstrom:sa lake ARHerdt PB is LLt}t e,.,

VBrown G ns

0 /85 95t2/85 05/3h/85 05/)0/85 05/p/85 05/(/85 3