U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-423/79-03 Docket No. 50-423 License No. CPPR-ll3 Priority
--
Category A
Licensee:
Northeast Nuclear Eneros Comoany P. O. Box 270 Hartford, Connecticut 06101 Facility Name:
Millstone Nuclear Power Station, Unit 3 Inspection at:
Berlin, Connecticut Inspection conducted: April 11-2, 1979 Inspectors:
g - (). T/ f
.-
,
A. D. Toth, Reactor Inspector date signed
~
W.R. Rutherford
.
date signed
~~
D. G. Anderson date signed Approved by:
ff'T P 9-7 9 R. W. McGaughy, Chief / Projects Section date signed RC&ES Branch Insoection Summary:
Unit 3 inspection on April 11-12, 1979 (Report No. 50-423/79-03)
Arnas Inspected:
Special announced inspection by one regional based inspector, accompanying two NRC:IE representatives, of design bases ecuments relating to safety related piping.
The inspec-tion involved i inspector-hours at the Northeast Utilities corporate office.
_Resul ts :
N0 items of noncompliance were identified.
7907110016
f\\\\
Region I Form 12 (0
' ' '
(Rev. April 77)
'
.
_ DETAILS 1.
Persons Contacted Northeast Utilities Service Company L. A. Chatfield, Assistant to Project Manager E. A. DeBarba, Generation Mechanical Engineer E. R. Foster, Project Manager T. J. Mawson, Engineer, Analysis Group, Generation Mechanical Engineering United States Nuclear Regulatory Commission, Inspection and Enforcement W. R. Rutherford, Inspection Specialist, HQ D. G. Anderson, Inspector, Region IV 2.
Control of Design Basis Documents The inspector assisted an IE:HQ inspecti,on specialist in a review of Westinghouse and Teledyne design basis documents.
These docu-ments include Westinghouse furnished definitions of operating transients for reactor coolant systems and related design para-meters defined by Teledyne Engineering Services.
For this facility, Westinghouse provides basic transient information, Teledyne pro-vides related analysis of piping, and Stone and Webster provides piping design.
The licensee reviews and approves deviations from Westinghouse basic parameters where appropriate for tne particular piping design of this facility, and provides coordination with operations staff responsible for preparing plant operations proce-dures and operation specifications.
The licensee representative stated thatthe basic operating supervision has bee.1 assigned for this facility, and showed evidance that the responsible individual was participating in review of anticipated plant transients.
The licensee representative stated that computer programs will be developed to keep track of important transient conditions and to monitor these relative to design basis allowable cycles.
The inspector reviewed several documents which reflect changes
, rom standard Westinghouse transients. The inspector ascertained that such changes were documented, transmitted to the piping designer, reviewed and approved by the licensee, and were coordinated with the NSSS contractor.
The licensee engineering staff was aware of all such changes by copy of Teledyne communications and through NUSCC/S&W/Teledyne meetings, and prepared a briefing memorandum for the project manager, summarizing the status of each such item in December 1978.
The resolution of some items is not yet' complete.
-)
o g)
L-
..
.
The inspector identified no items of noncompliance relative to licensee processing of this design basis data.
The inspector examined the following specific documents relative to the above:
Generation Mechanical Engineering briefing memo dated Decem-ber 8, 1978 Systems Standard Design criteria fo.r NSSS Design Transient, Document #1.3, dated April 15,1974 (Westinghouse), Revision
Westinghouse letters NEU-2747, dated March 20, 1978 NEU-2754, dated March 28, 1978 Teledyne Engineering Services letters (2658-series):
020 dated 10-17-77 028 dated 3-10-78 032 dated 5-16-78 045 dated 7-19-78 046 dated 7-21-78 047 dated 8-4-78 048 dated 8-16-78 077 dated 2-9-78 Northeast Utilities letters:
NEC-3033 dated 11-3-78 NNEC-3-838 dated 7-31-7A NEC-3032 dated 11-3-78 3.
Manaaement Meeting
- 't the conclusion of the inspection on April 12, 1979, the inspector
.
advised the perstns contacted (see Paragraph 1) of the results cf the inspection activities, other than the activities of the inspection specialist who would be preparing a separate report encompassing additional work at other locations.