Forwards IE Insp Rept 50-423/79-03 on 790411-12.No Noncompliance Noted
ML19224D161
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/15/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19224D162 List:
References
NUDOCS 7907110013
Download: ML19224D161 (2)


See also: IR 05000423/1979003

Text

.,:

7%

%

.

g#

UNITED STATES

O

4

NUCLEAR REGULATORY COMMISSION

f

'*' I

S

REGION I

EO

h

631 P ARK AVENUE

%

c,

KING OF PRUS$1 A, PENNSYLVANI A 19406

.....

Docket No. 50-423

15 IJAy ygg

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-423/79-03

This refers to the inspection conducted by Mr. A. Toth of this office on

April 11-12, 1979 at the Northeast Utilities offices at Berlin, Connecti-

cut of activities authorized by NRC License No. CPPR-ll3 and to the

discussions of our findings held by Mr. Toth with Mr. R. Foster of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulaticns, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contrac-

tor) believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such infomation

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

y)

,

7907110o3

g

yO-3

_ __

. . ,

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any ques-

tions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

&

lf,

-

Robert T. Carlson, Chief

R*2ctor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-423/79-03

cc w/ encl:

K. W. Gray, Construction quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer