IR 05000416/2025005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2025005)
ML25227A204
Person / Time
Site: Grand Gulf 
Issue date: 08/20/2025
From: Douglas Dodson
NRC/RGN-IV/DORS
To: Kapellas B
Entergy Operations
References
IR 2025005
Download: ML25227A204 (1)


Text

August 20, 2025

SUBJECT:

UPDATED INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2025005)

Dear Brad Kapellas:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Grand Gulf Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.

The enclosed inspection plan includes Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, which will take place from June 22, 2026, to June 26, 2026.

The Regional Administrator has authorized the NRC to conduct this inspection.

This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. Please contact me at 817-200-1148 with any questions you have regarding this letter.

Sincerely, Douglas E. Dodson II, Chief, Projects Branch C Division of Operating Reactor Safety Docket No. 05000416 License No. NPF29 Enclosure:

Inspection Plan cc w/encl: Distribution via LISTSERV Signed by Dodson, Douglas on 08/20/25 UPDATED INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2025005) DATED - AUGUST 20, 2025 DISTRIBUTION:

JMonninger, ORA GMiller, DORS NTaylor, DORS DCylkowski, RC TSteadham, RIV/OEDO VDricks, ORA TSmith, ORA LWilkins, OCA MMahoney, NRR AMoreno, RIV/OCA RAlexander, RSLO DDodson, DORS RKumana, DORS ABetts, DORS DOuk, DORS ASmallwood, DORS BPannabecker, DORS LReyna, DORS R4-DORS-IPAT R4Enforcement RClagg, RIV/OEDO AMoreno, RIV/OCA PMcKenna, DRO, NRR JPelton, DORL, NRR ARivera-Varona, DORL, NRR MWaters, DPR, NSIR TInverso, DSO, NSIR TNakanishi, DORL, NRR ROP Assessment DOCUMENT NAME: UPDATED INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2025005)

ADAMS Accession Number: ML25227A204

SUNSI Review RJK

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE SPE:DORS/PBC BC:DORS/PBC NAME RKumana DDodson SIGNATURE

/RA/

/RA/

DATE 08/18/25 08/20/25 OFFICAL RECORD COPY

Site Inspection Activity Plan Grand Gulf 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count GG 2025 BRQ

1 8/17/2025 8/23/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance GG 2026 INITIAL EXAM

1 11/30/2025 12/6/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1/11/2026 1/17/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Inservice Inspection - GG

1 2/23/2026 2/27/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 1,3,PI - GG

1 2/23/2026 2/27/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2/23/2026 2/27/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

2/23/2026 2/27/2026 IP 71151 000746 Performance Indicator Verification RP 5,6,7,8 - GG

1 5/11/2026 5/15/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation

5/11/2026 5/15/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

5/11/2026 5/15/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program

5/11/2026 5/15/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation EP Program & PI Inspection (2026) - GG

1 6/8/2026 6/12/2026 IP 71114.02 000717 Alert and Notification System Testing

6/8/2026 6/12/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

6/8/2026 6/12/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

6/8/2026 6/12/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness

6/8/2026 6/12/2026 IP 71151 001397 Performance Indicator Verification License Renewal 71003-GG (P3)

1 6/22/2026 6/26/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal Grand Gulf 2026 PI&R

1 7/6/2026 7/10/2026 IP 71152B 000747 Problem Identification and Resolution

7/13/2026 7/24/2026 IP 71152B 000747 Problem Identification and Resolution Age-Related Degradation Inspection - Grand Gulf

1 8/17/2026 8/21/2026 IP 71111.21N.04 001832 Age-Related Degradation

8/31/2026 9/4/2026 IP 71111.21N.04 001832 Age-Related Degradation Cybersecurity-GG

1 9/21/2026 9/26/2026 IP 71130.10 000741 Cybersecurity Prepared on 8/13/2025 1:29:56 PM 1 of 3

Site Inspection Activity Plan Security 71130.02/.07/.08

1 11/16/2026 11/19/2026 IP 71130.02 000734 Access Control

11/16/2026 11/19/2026 IP 71130.07 000739 Security Training

11/16/2026 11/19/2026 IP 71130.08 000740 Fitness-For-Duty Program

11/16/2026 11/19/2026 IP 71130.09 001656 Security Plan Changes

11/16/2026 11/19/2026 IP 71151 001338 Performance Indicator Verification MC&A - GG

1 11/16/2026 11/20/2026 IP 71130.11 000742 Material Control and Accounting (MC&A)

RP1,4,PI - GG

1 2/1/2027 2/5/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

2/1/2027 2/5/2027 IP 71124.04 000728 Occupational Dose Assessment

2/1/2027 2/5/2027 IP 71151 000746 Performance Indicator Verification EP Exercise & PI Inspection (2027) - GG

1 3/22/2027 3/26/2027 IP 71114.01 000716 Exercise Evaluation

3/22/2027 3/26/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

3/22/2027 3/26/2027 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - GG

1 3/29/2027 4/2/2027 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

4/26/2027 4/30/2027 IP 71130.03 000735 Contingency Response - Force-On-Force Testing GG 2027 INITIAL EXAM

1 6/13/2027 6/19/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

Prepared on 8/13/2025 1:29:56 PM 2 of 3

Site Inspection Activity Plan Grand Gulf 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Grand Gulf ISFSI (Part 72) Loading Inspection (multiple weeks, dry runs, 72.212, first loading, triennial inspection)

6/1/2025 8/31/2025 IP 60854 001000 Preoperational Testing Of An ISFSI 6/1/2025 8/31/2025 IP 60855 001001 Operation Of An ISFSI 6/1/2025 8/31/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations Grand Gulf ISFSI Aging Management Inspection during canister baseline (one week, TBD)

3/23/2026 4/11/2026 IP 60859 001921 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection Prepared on 8/13/2025 1:29:56 PM 3 of 3