MONTHYEARIR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 IR 05000416/20230902023-06-27027 June 2023 Public Meeting Notice: Grand Gulf Nuclear Station, Dated IR 05000416/2023090 - Preliminary White Finding Choice Letter ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 IR 05000416/20220062023-03-0101 March 2023 Annual Assessment Letter for Grand Gulf Nuclear Station Report 05000416/2022006 IR 05000416/20220042023-02-0101 February 2023 Integrated Inspection Report 05000416/2022004 IR 05000416/20224022023-01-17017 January 2023 Security Baseline Inspection Report 05000416/2022402 (Cover Letter) IR 05000415/20223012022-12-19019 December 2022 NRC Examination Report 05000415/2022301 IR 05000416/20220032022-11-0303 November 2022 Integrated Inspection Report 05000416/2022003 IR 05000416/20224032022-11-0101 November 2022 Security Baseline Inspection Report 05000416 2022403 (Cover Letter Only) IR 05000416/20220132022-10-24024 October 2022 Revised Grand Gulf Nuclear Station Design Basis Assurance Inspection Report 05000416/2022013 IR 05000416/20220502022-10-20020 October 2022 Special Inspection Reactive Report 05000416/2022050 ML22280A0292022-10-11011 October 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000416/2022013 IR 05000416/20223012022-09-30030 September 2022 NRC Initial Operator Licensing Examination Approval 05000416/2022301 IR 05000416/20220052022-08-18018 August 2022 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2022005) IR 05000416/20220022022-08-11011 August 2022 Integrated Inspection Report 05000416/2022002 IR 05000416/20220112022-06-0606 June 2022 Biennial Problem Identification and Resolution Inspection Report 05000416/2022011 IR 05000416/20220012022-05-0909 May 2022 Integrated Inspection Report 05000416/2022001 IR 05000416/20220122022-04-20020 April 2022 License Renewal Phase 1 NRC Inspection Report 05000416/2022012 IR 05000416/20210062022-03-0202 March 2022 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2021006) IR 05000416/20210042022-02-0808 February 2022 Integrated Inspection Report 05000416/2021004 IR 05000416/20214202022-02-0707 February 2022 Cover Letter for Grand Nuclear Station, Unit 1 Security Baseline Inspection Report 05000416/2021420 IR 05000416/20200132022-02-0303 February 2022 Amended - Grand Gulf Nuclear Station - Triennial Fire Protection Inspection Report 05000416/2020013 and Notice of Violation ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 ML21349B3372021-12-15015 December 2021 NOV_EA-20-125 21-096 21-110_GG Combined Case IR 05000416/20213012021-12-14014 December 2021 NRC Examination Report 05000416/2021301 IR 05000416/20210402021-11-18018 November 2021 NRC Supplemental Inspection Report 05000416/2021040 and Assessment Follow-Up Letter IR 05000416/20210032021-11-10010 November 2021 Integrated Inspection Report 05000416/2021003 and Independent Spent Fuel Storage Installation Report 07200050/2021001 ML21265A3562021-09-22022 September 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000416/2021004) and Request for Information IR 05000416/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Grand Gulf Nuclear Station (Report 05000416/2021005) IR 05000416/20210022021-08-10010 August 2021 Grang Gulf Nuclear Station - Integrated Inspection Report 05000416/2021002 IR 05000416/20214012021-06-22022 June 2021 NRC Security Inspection Report 05000416/2021401 IR 05000416/20214022021-06-0808 June 2021 Grang Gulf Nuclear Station - Security Baseline Inspection Report 05000416/2021402 IR 05000416/20210012021-05-0505 May 2021 GG2021001-IR-TS, Grand Gulf Nuclear Station - Integrated Inspection Report 05000416/2021001 ML21055A0012021-02-24024 February 2021 Entergy_Ggulf Choice Letter for Signature EA 20-125 IR 05000416/20210902021-02-0909 February 2021 Final Significance Determination of Green Finding; NRC Inspection Report 05000416/2021090 IR 05000416/20200042021-02-0303 February 2021 Integrated Inspection Report 05000416/2020004 IR 05000416/20204032020-12-21021 December 2020 Material Control and Accounting Program Inspection Report 05000416/2020403 ML20345A1542020-12-0808 December 2020 NRC Inspection Report 05000416/2020002 and Response to Disputed Non-Cited Violation IR 05000416/20203022020-12-0404 December 2020 Exam Report 05000416/2020302 2024-01-25
[Table view] Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] |
Text
ber 3, 2005
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC INITIAL LICENSE EXAMINATION REPORT 05000416/2005301
Dear Mr. Williams:
On August 17, 2005, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at the Grand Gulf Nuclear Station. The enclosed examination report documents the examination findings, which were discussed on September 13, 2005, with Mr. J. Miller and other members of your staff.
The examination included an evaluation of one applicant for reactor operator license, one applicant for an instant senior operator license, and two applicants for upgrading their reactor operator licenses to senior operator licenses. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9. The license examiners determined that all four of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ryan E. Lantz Operations Branch Division of Reactor Safety Docket: 50-416 License: NPF-29
Entergy Operations, Inc. -2-
Enclosure:
Examination Report 05000416/2005301; w/Attachment: Supplemental Information
REGION IV==
Docket: 50-416 License: NPF-29 Report No.: 05000416/2005301 Licensee: Entergy Operations, Inc.
Facility: Grand Gulf Nuclear Station Location: Waterloo Road Port Gibson, Mississippi Dates: August 15 through September 13, 2005 Examiners: P. Gage, Senior Operations Engineer S. Garchow, Operations Engineer Approved By: Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety 1 Enclosure
SUMMARY OF FINDINGS
IR 05000416/2005301; 8/15-9/13/2005; Grand Gulf Nuclear Station, Initial operator license examination.
NRC examiners evaluated the competency of one applicant for an operator license and three applicants for senior operator licenses. The licensee developed the written examination and the operating examination using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9. NRC examiners provided assistance in the development of the written examination. The licensee proctored the written examination on August 22, 2005. The NRC examiners administered the operating examination on August 15-17, 2005.
NRC-Identified and Self Revealing Findings
No findings of significance were identified.
B. Licensee-Identified Findings No findings of significance were identified.
REPORT DETAILS
4OA5 Initial License Examination
.1 Operator Knowledge and Performance
a. Examination Scope
The NRC examination team administered the operating examinations to four applicants on August 15-17, 2005. The operator applicant and instant senior operator applicant participated in 2 dynamic simulator scenarios, a control room and facilities walkthrough examination consisting of 10 or 11 job performance measures, and an administrative examination consisting of 4 or 5 job performance measures. The two senior operator upgrade applicants participated in 1 dynamic simulator scenario, a control room and facilities walkthrough examination consisting of 5 job performance measures, and an administrative examination consisting of 5 job performance measures. In addition, the chief examiner sampled historical records of the applicants to verify the accuracy of data on their license applications, in accordance with Examiner Standard 202.C.2.e of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors,"
Revision 9. .
On August 22, 2005, the licensee proctored the administration of the written examination to all four applicants.
b. Observations and Findings
No findings of significance were identified.
All four applicants passed all parts of the examinations. The average score for the applicants was 86.6 percent. The applicant scores ranged from 81 to 92 percent.
The licensee conducted a performance analysis for the written examinations with an emphasis on the 10 questions that were missed by one-half, or greater, of the applicants on each examination. This analysis determined the answer key was correct for all the questions on the reactor operator and senior operator examinations. Upon subsequent review, the examiners agreed with this analyses and that no corrections of the answer key were necessary.
.2 Initial Licensing Examination Development
a. Scope
The written examination and operating test was developed by the licensee in accordance with NUREG-1021.
NRC examiners reviewed the initial examination submittal during the week of June 27, 2005, and identified several deficiencies with the written examination. These included knowledge/ability identification errors, excessive use of open reference format, senior operator questions not written at the senior operator level, excessively long and complex question stems, as well as other construction and psychometric errors. NRC examiners provided the review results to the licensee for correction of the observed errors. On July 15, 2005, the licensee resolution of the comments was received and reviewed by NRC examiners. This review indicated that many of the fundamental errors observed during review of the initial written examination submittal remained, and that the written examination would potentially not be ready for administration on the originally planned date of August 12. During the week of July 25, 2005, one NRC examiner was dedicated to assist the licensee training staff in developing a revised written examination. The licensee completed the revised written examination and conducted an on site validation of the examination using site licensed operators. On August 4, 2005, NRC examiners then completed the review of the written examination and provided some minor revision comments to the licensee. The final version of the written examination was reviewed and approved on August 11, 2005, and the licensee was then authorized to administer the written examination on August 22, 2005.
The NRC staff completed review of the operating test outlines on April 19, 2005, with no comments for revision. The chief examiner conducted an onsite validation of the operating test and provided comments to the licensee on July 21, 2005. These comments were incorporated into the final operating tests. The operating test was also validated by site licensed operators.
b. Findings
No findings of significance were identified.
The examiners identified a weakness in the licensees understanding of the qualitative attributes of NRC written examination questions and, to a lesser extent, the examination development process, as described in NUREG-1021. The licensee acknowledged a weakness in this area, and wrote Condition Report CR-GGN-2005-03066 to evaluate the observed weakness and identify corrective actions to address.
.2.1 Simulator Facility Performance
a. Scope
The examination team observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings of significance were identified.
.2.2 Examination Security
a. Scope
The examiners reviewed examination security both during the onsite preparation and examination administration weeks with respect to NUREG-1021 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel. Licensee facility training and operations staff involved in examination development and/or validation were on a security agreement.
b. Findings
No findings of significance were identified.
4OA6 Meetings, Including Exit
On September 13, 2005, the chief examiner presented examination results to Messrs. J. Miller and M. Chase. The examiners confirmed that proprietary information was not provided or examined during the examination process.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee personnel
- M. Chase, Supervisor, Operations Training (Classroom)
- M. Ellis, Supervisor, Operations Training (Simulator)
- J. Miller, Manager, Training
- M. Rasch, Senior Operations Instructor
A1 Attachment