Eart ::,7 3(2) Inforrntic,
,
.
O U.S. NUCLEAR REGULATORY C0t":lSSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-409/80-12
,
Docket No. 50-409 License No. DPR-45 Safeguards Group IV Licensee: Dairyland Power Cooperative 2615 East Avenue - South La Crosse, WI 54601 Facility Name:
La Crosse Boiling Water Reactor (LACBWR)
Inspection At:
LACBWR Site, Genu, WI Inspection Conducted: October 9-10, 1980 Date of Last Physical Security Inspection: August 28-29, 1980 Type of Inspection: Special Follow-up Inspection Inspector: b_k Nm J p]A8[ M
.
G. L re Date Physical Security Specialist Approved by:
.Y.
l0 2fffg I
r
4
-
J. A. Hind, Chief Jate Safeguards Branch Inspection Summary Areas Inspected:
Included a review of the Protected Area Physical Barriers; Detection Aids; Testing and Maintenance; Security Plan; Power Supply; and
,
Follow-up on Previous Items of Noncompliance. The inspection involved 11 inspector hours onsite by one NRC inspector. The inspection began during the day shift; no inspection hours were accomplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined.
8011200 02.2