U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-409/80-03 Docket No. 50-409 License No. DPR-45 Licensee: Dairyland Power Corporation 2615 East Avenue South La Crosse, WI 54601 Facility Name: La Crosse Boiling Water Reactor Inspection At:
La Crosse Site, Genoa, WI Inspection Conducted: April 28-29, 1980 M
'
8 /.$!fd
.
Inspector:
. D. Ward mes kk~
Approved By:
D. II. Danielson, Chief b/ [a Engineering Support Section 2 Inspection Summary Inspection on April 28-29, 1980 (Report No. 50-409/80-03)
Areas Inspected: Spent fuel rack QA/QC programs, itLplementing welding and nondestructive examinations (NDE) procedures and record review.
This inspection involved a total of nine inspection hours on site by one NRC inspector.
Results: No items of noncompliance or deviation * were identified.
,
l
,
J 8006230oC t
.
'
DETAILS i
Persons Contacted Dairyland Power Corporation (DPC)
- H.' Tow sley, Quality Assurance Supervisor C. Angle, Process Engineer The inspector also contacted and interviewed other licensee and contractor employees.
'
- Denotes those present at the exit interview.
Functional or Program Areas Inspected 1.
Spent Fuel Storage Modification An unofficial transmittal letter vas sent to the Director of Nuclear Regulation US-NRC, Washington, D.C. on April 20, 1978, with an appli-cation for amendment of the licensee's Operating License No. DPR-45 requesting.an increase in the storage capacity of the irradiated fuel storage-pool by the initial removal of existing storage racks and the subsequent addition of high density storage racks for irradiated fuel and shrouds.
February 4,1980, Mr. D. Ziemann, Chief Operating Reactors Branch No.
2, Division of Operating Reactors issued Amendment No. 18 to Provi-sional Operating License No. DPR-45 allowing increase in the capa-city of the spent fuel storage pool from 134 to 440 fuel assemblies.
Metal Products Corp. (MPC) fabricated the high density spent fuel racks in accordance with Nuclear Energy Service, Inc. (NES) Divi-
- lion Specification No. 80A1770 " Specification for the Fabrication und Inspection of the La Crosse Boiling Water Reactor High Density Fuel-Storage Racks", and-appears to satisfy P.O. No. A67459, dated November. 21, 1978.
The Carborundum Company packaged, handled and shipped the Boron Carbide. Composite sheet material.
The inspector determined that applicable welding procedures and material were used and the appearance of the weld surface was acceptable. The following Metal Products documents were reviewed:
MPC, Quality Assurance Manual, MPC-QA-1000 B-3, March 14, 1977.
.
liandling, Packaging and Shipping of Nuclear Fuel Storage Racks,
.
'ENG-PPS-243-2, February 22, 1980.
'
-2-
,
.
- -.
- -
,
.
Fabrication of Nuclear Fuel Storage Racks, ENG <PS-244-0,
.
August 20, 1979.
Plug or Shot Welding of Stainless Steel, (MIG), QC-PPS-240-0,
.
April 30,1979.
Gas Metal Arc (GMAW) Welding of Stainless Steel, QC-PPS-233-2,
..
Sepc aher 7, 1979.
ACC Spot Welding (GTAW) of Stainless Steel, QC-PPS-254-0,
.
September 7, 1979.
Weld Rod Filler Metal Control, QC-PPS-236, December 19, 1978.
.
Gas Tungsten Arc Welding (TIG) of Stainless Steel, QC-PPS-219-4,
.
September 7, 1979.
Liquid Penetrant Testing of Welded Components, QC-PPS-203-4,
.
January 2,1979.
Repair of Defective on Unsound Welds, Qt-PPS-211-1, February 26,
.
1979.
Sand Blasting of Stainless Steel Materials and Assemblies for
.
Nuclear Applications, QC-PPS-212, December 12, 1979.
Plug or Sloc Welding of Stainless Steel (TIG), QC-PPS-216-1,
.
April 30, 1979.
Cleaning of Nuclear Racks, QC-PPS-218-5, October 18, 1978.
.
No. Szems of noncompliance or deviations were identified.
The inspector reviewed material test and quality control inspection reports for receiving, handling, packaging, and storage. Also the following NES documents:
NES,.7pecification for the Fabrication and Inspection of the
.
Poison Material for the La Crosse Boiling Water Reactor High Density Fuel Storage Racks, 80A1772, January 30, 1979.
Installation of LACBWR High Density Fuel Storage Racke 80A1774,
.
,
- "rision 0, April 2, 1980
'
nodification of the Crash Pad, February 21, 1980.
.
Modification of the Crash Pad Strongback, February 21, 1980.
.
New Fuel Rack Installation, M-18-75, Revision 1, October 4, 1976.
.
l-3-
._
. -__ _
_ _ _ _ _ _ _ - _ _.
.'
.
Specification for.the Fabrication and' Inspection of the In-
'-
.
stallation Tools for the High Density Fuel Storage Racks, 80A1805, Revision 0, November 27, 1979.
Specification for the Fabrication and Inspection of the Lifting
.
Tools for the High Density Fuel Storage Racks, 80A1797, Revision 1, January 30, 1979.
No items of noncompliance or deviations were identified.
The. inspector reviewed DPC receipt inspection reports and the following audits-and nonconformance reports:
.DPC -' Vendor QA' audit of MPC for verification of QA implemen-
>
.
tation, including welding and nondestructive examinations (NDE),
. personnel and procedures.
'NES - Quality Assurance audit of MPC.
.
NES - Quality Assurance nonconformance report of MPC.
.
MPC - Nonconformance reports of MPC.
.
No items of noncompliance or deviations were identified.
Exit Interview The inspector met with site representatives at the conclusion of the inspection. The inspector summarized.the scope and findings of the inspection noted in this report.
,
- .
,