March 2, 2005
SUBJECT:
ERRATA FOR COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2004002
Dear Mr. Parrish:
NRC Inspection Report 05000397/2004002, dated May 4, 2004, is being re-issued to incorporate two sections that were inadvertently omitted from the Report Details section.
Specifically, Sections 1R11.2, Licensed Operator Requalification (Biennial) and 1EP4, Emergency Action Level and Emergency Plan Changes, have been incorporated. In addition, the cover letter, summary of findings, and attachment have been revised to reflect a Severity Level IV noncited violation associated with Section 1EP4. If you contest this noncited violation, you should provide a response with the basis for your denial, within 30 days of the date of this revised inspection report, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011-4005; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident inspector at the Columbia Generating Station.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
William B. Jones, Chief Project Branch E Division of Reactor Projects
Energy Northwest-2-Docket: 50-397 License: NPF-21 Enclosure:
NRC Inspection Report 05000397/2004002 cc/enclosure:
W. Scott Oxenford (Mail Drop PE04)
Vice President, Technical Services Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Albert E. Mouncer (Mail Drop PE01)
Vice President, Corporate Services/
General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Douglas W. Coleman (Mail Drop PE20)
Manager, Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Gregory V. Cullen (Mail Drop PE20)
Supervisor, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Dale K. Atkinson (Mail Drop PE08)
Vice President, Nuclear Generation Energy Northwest P.O. Box 968 Richland, WA 99352-0968
Energy Northwest-3-William A. Horin, Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Matt Steuerwalt Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113 Lynn Albin, Radiation Physicist Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827 Chief, Technological Hazards Branch FEMA Region X Department of Homeland Security Federal Regional Center 130 228th Street, SW Bothell, WA 98201-9796
Energy Northwest-4-Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (ZKD)
Branch Chief, DRP/E (WBJ)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
J. Dixon-Herrity, OEDO RIV Coordinator (JLD)
Columbia Site Secretary (LEF1)
RSLO (WAM)
NSIR/EPPO (JDA1)
SISP Review Completed: __wbj__ ADAMS: / Yes G No Initials: __wbj__
/ Publicly Available G Non-Publicly Available G Sensitive
/ Non-Sensitive R:\\_CGS\\2005\\CGS 2004-02ERRATA.wpd RIV:C:DRS/OB C:DRP/E ATGody WBJones TOMcKernon for
/RA/
3/1/05 3/2/05 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
ENCLOSURE May 4, 2004 Mr.