Security Baseline Inspection Report 05000390/2025401 and 05000391/2025401
ML25143A270
Person / Time
Site: Watts Bar  
(NPF-090, NPF-096)
Issue date: 05/27/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS/NSB
To: Erb D
Tennessee Valley Authority
References
IR 2025401
Download: ML25143A270 (1)


Text

SUBJECT:

WATTS BAR NUCLEAR PLANT, UNITS 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000390/2025401 AND 05000391/2025401

Dear Delson Erb:

On May 15, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Watts Bar Nuclear Plant, Units 1 & 2 and discussed the results of this inspection with Kenny Mize and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000390 and 05000391 License Nos. NPF-90 and NPF-96

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000390 and 05000391

License Numbers:

NPF-90 and NPF-96

Report Numbers:

05000390/2025401 and 05000391/2025401

Enterprise Identifier:

I-2025-401-0051

Licensee:

Tennessee Valley Authority

Facility:

Watts Bar Nuclear Plant, Units 1 & 2

Location:

Spring City, Tennessee

Inspection Dates:

May 12, 2025, to May 15, 2025

Inspectors:

J. Brown, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Watts Bar Nuclear Plant, Units 1 &

2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

1. Tier I: All Requirements

2. Tier II: 8 Requirements 02.06 a - d, 02.07 a, 02.08 a,b, e

3. Tier III: 1 Requirement 02.09

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) March 1, 2024, through April 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On May 15, 2025, the inspectors presented the security baseline inspection results to Kenny Mize and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR 1925199

CR 1947148

CR 1953082

CR 1961038

CR 1968462

CR 1968507

CR 1970522

CR 1976192

CR 2001971

CR 2008079

Corrective Action

Documents

CR 2009979

Miscellaneous

QA-WB-24-001

Fleet Security Assessment

11/12/2024

NSDP-1

Safeguards Event Reporting Guidelines

Revision 16

NSDP-7.6

Personnel Access Control

Revision 7

NSDP-7.7

Vehicle Access Control

Revision 9

71130.02

Procedures

NSDP-8

Keys and Locks

Revision 8

71130.09

Procedures

PSP

Watts Bar Physical Security Plan

Revision 27

Corrective Action

Documents

CR 1994730

NEI 99-02

Regulatory Assessment Performance PI Guideline

Revision 7

71151

Procedures

NSDP-23

Tracking and Trending an NRC Performance Indicator

Revision 11