Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-387/94-06 & 50-388/94-06
ML17158A452
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/26/1994
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 9409070023
Download: ML17158A452 (4)


Text

>AUG"2-6'qggg Docket Nos.

50-387 50-388 Pennsylvania Power Sc Light Company AKIM Mr. Robert Senior Vice President - Nuclear 2 North Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Byram:

SUBJECT:

NRC REGION I COMBINED INSPECTION 50-387/94-06; 50-388/94-06 This refers to your letter dated June 9, 1994 in response to our letter dated May 10, 1994, regarding failure to follow procedures during maintenance and failure to document overheated main steam isolation valve cables on a nonconformance report.

Thank you for informing us of the corrective and preventive actions documented in your letter.

These actions willbe examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely, OrllGIPAL SlQg~p gy EDWARD C. WENZlNGER Edward C. Wenzinger, Chief Projects Branch 2 Division of Reactor Projects 9409070023 940826 PDR ADOCK 050003S7

PDR

AUG 2 6 199'

~

Mr. Robert cc w/cy of Licensee's Letter:

J. C. Tilton III, Allegheny Electric Cooperative, Inc.

K. Abraham, PAO Public Document Room {PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania CC:

H. G. Stanley, Vice President - Nuclear Operations G. T. Jones, Vice President - Nuclear Engineering J. M. Kenny, Nuclear Licensing M. M. Urioste, Nuclear Services Manager H. D. Woodeshick, Special Office of the President J. M. Finnegan, Supervisor - Nuclear Compliance

Qf l'

~

Mr. Robert AUR 2 g too~

bcc w/cy of Licensee's Letter:

Region I Docket Room (with concurrences)

J. White, DRP E. Wenzinger, DRP G. Barber, DRP C. Poslusny, NRR Project Manager M. Thadani, Acting PDI-2, NRR W. Dean, OEDO ite

9~