IR 05000387/1994012

From kanterella
Jump to navigation Jump to search
Informs of Status of Staff, Task Action Plan for Sf Storage Pool Safety. Staff Rept & Insp Repts 50-387/94-12 & 50-388/94-13 Encl
ML17158B759
Person / Time
Site: Susquehanna  
Issue date: 08/22/1996
From: James Shea
NRC (Affiliation Not Assigned)
To: Lochbaum D, Prevatte D
AFFILIATION NOT ASSIGNED
References
TAC-M88094, NUDOCS 9608260466
Download: ML17158B759 (3)


Text

Hr. David A. Lochbaum~

2010 Roswell Road,

¹288F Harrietta, GA 30068 Hr. Donald C. Prevatte.';

7924 Woodsbluff Run Fogelsville, PA 18051 August 22, 199 SUBJECT:

SPENT FUEL POOL COOLING GENERIC REVIEW (TAC NO. H88094)

Gentlemen:

This letter is to. inform you of the status of the staff's

"Task Action Plan for Spent Fuel Storage Pool Safety."

The staff has completed a generic review of spent fuel storage pools for operating reactors.

The staff's report is provided as an enclosure for your information although it was provided previously to you without cover.

Also enclosed is a copy of Inspection Reports 50-387/94-12 and 50-388/94-13 which addresses certain issues raised in your report filed pursuant to

CFR Part

on November 27, 1992, and in other correspondence.

As noted in the report, the staff plans to conduct safety-enhancement, plant-specific backfit analyses for a number of operating reactors, The staff will keep you informed about-the status of these analyses.

As you are already aware, the NRC's Office for Analysis and Evaluation of Operating Data is conducting a review of loss of spent fuel pool cooling issues including a review of risk studies.

I will ensure that you receive a

copy of the final report from this study, which is expected prior to the end of 1996.

If you have any additional comments or questions, please do not hesitate to call me at (301)-415-1428.

9608260466 96082Z PDR ADQCK 05000387 P

PDR

Sincerely,

/s/

Joseph W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Enclosures:

1.

2.

Memorandum to the Commission, from J. Taylor, "Resolution of Spent Fuel Storage Pool Action Plan Issues,"

dated July 26, 1996 Letter to R.

Byram, PPRL, from E. Kelly, NRC, dated July 31, 1996 with Combined Inspection Report Nos.

50-387/94-12 and 50-388/94-13 Distribution

IDocket File* i

'PUBLIC" PDI-2 Reading*

SVarga LHarsh OFFICE w enclosure

JZwolinski JStolz HO'Brien JShea*

RZi e man*

PD-CPoslusny OGC ACRS SJones JLee, DRPH PDI-2 D

WPasci ak, RI LPrividy, RI EKelly, RI RHatakas, RI J Ibarra, AEOD B

e DATE

OFFICIAL RECORD COPY Q/96 JStolz 9/<+96

~R RE00

~o Cy

~c ch

~O

++*++

UNITED STATES

'UCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205554001 August 22, 1996 Mr. David A. Lochbaum 2010 Roswell Road, 82887 Marrietta, GA 30068 Mr. Donald C. Prevatte 7924 Woodsbluff Run Fogelsville, PA 18051 SUBJECT:

SPENT FUEL POOL COOLING GENERIC REVIEW (TAC NO. M88094)

Gentlemen:

This letter is to inform you of the status of the staff's

"Task Action Plan for Spent Fuel Storage Pool Safety."

The staff has completed a generic review of spent fuel storage pools fo} operating reactors.

The staff's report is provided as an enclosure for your information although it was provided

" previously to you without cover.

Also enclosed is a copy of Inspection Reports 50-387/94-12 and 50-388/94-13 which addresses certain issues raised in youi report filed pursuant to

CFR Part

on November 27, 1992, and in other correspondence.

As noted in the report, the staff plans to conduct safety-enhancement, plant-specific backfit analyses for a number of operating reactors.

The staff will keep you informed about the status of these analyses.

As you are already aware, the NRC's Office for Analysis and Evaluation of Operating Data is conducting a review of loss of spent fuel pool cooling issues including a review of risk studies.

I will ensure that you receive a

copy of the final report from this study, which is expected prior to the end of 1996.

If you,have any additional comments or questions, please do not hesitate to call me at (301)-415-1428.

Sine r ly, J se'.

Shea, Project Manager P oject Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Enclosures: '.

Memorandum to the Commission, frolic J. Taylor, "Resolution of Spent Fuel Storage Pool Action Plan Issues,"

dated July 26, 1996 2. Letter to R.

Byram, PP8L, from E. Kelly, NRC, dated July 31, 1996 with Combined Inspection Report Nos.

50-387/94-12 and 50-388/94-13

,4 C