Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] Category:License-Operator
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1882020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Susquehanna Steam Electric Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval PLA-7801, Response to Request for Information Pertaining to a Licensed Operator2019-07-31031 July 2019 Response to Request for Information Pertaining to a Licensed Operator ML19189A3522019-07-0808 July 2019 LLC Licensed Operator Positive Fitness-For-Duty Test ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18060A2842018-03-0101 March 2018 Operator Licensing Examination Approval ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 2021-09-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 ML15126A2622015-01-10010 January 2015 Licensee Comments on Draft Facility-Developed Exam (Written) (Folder 2) ML15126A2632015-01-0808 January 2015 Draft - Outlines (Folder 2) ML15126A2652015-01-0808 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15126A2642015-01-0808 January 2015 Draft Written Exam (Folder 2) ML15146A4192014-10-23023 October 2014 Final Qa/Related Forms (Folder 1) 2021-09-02
[Table view] |
Text
ary 25, 2005
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -
SENIOR REACTOR OPERATOR INITIAL RETAKE EXAMINATION REPORT 05000387 and 0500388/2005301
Dear Mr. Shriver:
This report transmits the results of the Senior Reactor Operator (SRO) licensing retake examination conducted by the NRC on February 3, 2005. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
One applicant for an instant SRO license was administered a written exam retake. Based on the results of the examination, the applicant passed his retake examination. The results indicated that the applicant was generally well prepared for the examination. The NRC examiner, Mr. Herb Williams discussed initial performance insights observed during the examination with Mr. Robert Boesch of your staff on February 3, 2005. On February 7, 2005, final examination results were given during a telephone call between Mr. Richard Conte and Mr. Robert Boesch of your staff.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). These records include the final examination and are available in ADAMS (Master File - Accession Number ML043030004; SRO Operating Section C - Accession Number ML050460352), ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. Bryce Should you have any questions regarding this examination, please contact me at (610) 337-5183 or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-387,05-388 License No. NPF-14, NPF-22 Enclosure: Initial Examination Report No. 05000387 and 05000388/2005301 cc w/encl:
J. H. Miller, Executive Vice-President and COO - PPL Services B. T. McKinney, Vice President - Nuclear Site Operations R. A. Saccone, Vice President - Nuclear Operations for PPL Susquehanna LLC A. J. Wrape, III, General Manager- Performance Improvement and Oversight T. L. Harpster, General Manager - Plant Support K. Roush, Manager - Nuclear Training G. F. Ruppert, General Manager - Nuclear Engineering D. F. Roth, Manager - Quality Assurance R. R. Sgarro, Manager - Nuclear Regulatory Affairs M. Sleigh, Manager - Nuclear Security W. E. Morrissey, Supervisor - Nuclear Regulatory Affairs M. H. Crowthers, Supervising Engineer L. A. Ramos, Community Relations Manager, Susquehanna B. A. Snapp, Esquire, Associate General Counsel, PPL Services Corporation R. W. Osborne, Allegheny Electric Cooperative, Inc.
Board of Supervisors, Salem Township J. Johnsrud, National Energy Committee Supervisor - Document Control Services D. Allard, Director, Pennsylvania Bureau of Radiation Protection Commonwealth of Pennsylvania (c/o R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection)
S. Glenn, INPO
Mr. Bryce
SUMMARY OF FINDINGS
IR 05000387 and 05000388/2005301; February 3, 2005; Susquehanna Steam Electric Station
Units 1 and 2; Initial Operator Licensing Retake Examination. One SRO instant applicant passed the examination.
There were no inspection findings of significance associated with this retake examination.
NRC-Identified and Self-Revealing Findings
None
Licensee-Identified Violations
None ii
REPORT DETAILS
REACTOR SAFETY
Mitigating Systems - Senior Reactor Operator (SRO) Initial License Examination
a. Scope
of Review The licensee developed the operating initial examination. The NRC together with Site training and operations personnel verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the plant and training facility. Final resolution of comments and incorporation of test revisions were completed prior to examination administration week.
- Simulation facility operation was proper.
- Examination security requirements were met.
An NRC examiner administered the SRO Operating Test Section C Retake examination to one applicant on February 3, 2005.
b. Findings
Grading and Results One SRO instant applicant passed the SRO Operating Test Section C Retake examination. This applicant had previously passed all other portions of the initial licensing examination and was granted a waiver for these sections.
The facility had no post-examination comments.
Examination Administration and Performance During the exam administration there were no potential simulator fidelity issues or training deficiencies identified.
4OA6 Exit Meeting Summary
On February 7, 2005, the NRC provided examination results to Mr. Robert Boesch via the telephone. The license number was held pending notification by the licensee of completion of all program requirements.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- R. Boesch, Supervisor Nuclear Training
- R. Brooks, Exam Development Team Lead
- R. Chin, Exam Development Team
NRC Personnel
- J. Caruso, Senior Operations Engineer
- H. Williams, Senior Operations Engineer
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened/Closed/Discussed
None
Attachment