IR 05000328/2005015

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 950328-0515.Deviation Noted:After UPS 2D240 Failed post-maint Test on 950130, External Maint Bypass Switch Not Positioned to Bypass UPS & Supply Distribution Panel Directly from Alternate Supply
ML17158A714
Person / Time
Site: Susquehanna, Sequoyah  Talen Energy icon.png
Issue date: 06/15/1995
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17158A713 List:
References
50-388-95-08, 50-388-95-8, NUDOCS 9506210086
Download: ML17158A714 (1)


Text

NOTICE OF DEVIATION Pennsylvania Power 8 Light Company Susquehanna Steam Electric Station Docket No. 50-388 License No.

NFP 22 During an NRC inspection conducted from Harch 28, 1995 to Hay 15, 1995, a

deviation from your Final Safety Analysis Report was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Action", 10 CFR Part 2, Appendix C, the deviation is listed below:

The Susquehanna Steam Electric Station Final Safety Analysis Report (FSAR), Section 8.3.1.8, states, in part, that each instrument AC power supply consists of one uninterruptible power supply (rectifier/charger, invertor, static transfer switch),

a dedicated 250 Vdc sealed maintenance-free battery system, an external maintenance bypass switch panel, and a 208/120 V distribution panel.

The FSAR further states, if the uninterruptible power supply (UPS) is inoperable or is to be removed..

from service for maintenance, the external maintenance bypass switch is positioned to bypass the UPS and supply the distribution panel directly from the alternate supply.

Contrary to the above, after UPS 2D240 failed a post-maintenance test on January 30, 1995, the.external maintenance bypass switch was not positioned to bypass the UPS and supply the distribution panel directly from the alternate supply.

The UPS was in its normal service alignment until April 15, 1995, when it failed to provide backup battery power or a transfer its alternate supply in response to an electrical perturbation.

Please provide to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C. 20555, with a copy to the Regional Administrator, Region I, and the NRC Resident Inspector, in writing within 30 days of the date of this Notice, (1) the reason for the deviation, or if contested, the basis for disputing the deviation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further deviations, and (4) the date when your corrective action will be completed.

Where good cause is shown, consideration will be given to extending the response time.

Dated at King of Prussia, Pennsylvania this 15th day of June 1995 95062i0086 9506i5 PDR ADOCK 05000387

'DR,