IR 05000387/1995017

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-387/95-17 & 50-388/95-17 on 950829
ML17158A964
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/31/1995
From: Pasciak W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
References
NUDOCS 9511070030
Download: ML17158A964 (4)


Text

SUBJECT:

NRC REGION I COMBINED INSPECTION 50-387/95-17'0-388/95-17

Dear Hr. Byram:

This refers to your letter dated September 28, 1995 in response to our letter dated August 29, 1995.

Thank you for informing us of the corrective and preventive actions documented in your letter.

These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely, ORIGINAL SIGNED BY:

Walter J.

Pasciak, Chief Projects Branch

Division of Reactor Projects Docket Nos; 50-387',

50-388 CC H.

G. Stanley, Vice President - Nuclear Operations G. T. Jones, Vice President - Nuclear Engineering J.

H. Kenny, Nuclear Licensing H. H. Urioste, Nuclear Services Manager H.

D. Woodeshick, Special Office of the President J.

H. Finnegan, Supervisor - Nuclear Compliance C.

D. Lopes, Manager Nuclear Security W. Burchill, Manager - Assessment Services cc w/cy of Licensee's Response Letter:

J.

C; Tilton III, Allegheny Electric Cooperative, Inc.

NRC Resident Inspector Commonwealth of Pennsylvania k

951i070030 95i03i PDR ADQCK 05000387

PDR

Distribution w/cy of Licensee's Response Letter:

Region I Docket Room (with concurrences)

D. Screnci, PAO PUBLIC Nuclear Safety Information Center (NSIC)

W. Pasciak, DRP R. Urban, DRP, C. Poslusny, NRR Project Manager J. Stolz, PDI-2, NRR W. Dean, OEDO DOCUMENT NAME:

a:reply.sus To receive a copy of this document, indicate in the box:

G" ~ Copy without attachment/enclosure E'

Copy with attachment/enclosure

'N i No copy OFFICE RI:DRP NAME WPas DATE 10/

OFFICIAL RECORD COPY

j 0