IR 05000374/1993024

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-374/93-24 on 930916-1124.No Violations Noted
ML20058H798
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 12/06/1993
From: Jeffrey Jacobson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Murphy W
COMMONWEALTH EDISON CO.
Shared Package
ML20058H800 List:
References
NUDOCS 9312130227
Download: ML20058H798 (2)


Text

h

u

,

_ _ _

eeco

,

,

UNITED STATES p

. ff NUCLEAR REGULATORY COMMISSION

.*

o REGON 111

E 799 ROOSEVELT ROAD I*

GLEN ELLYN. ILUNOIS 60137-5927 '

h

,/

DEO C 1993 Docket No. 50-374 Comm nwealth Edircn Company

,

ATTN: Mr. Warren Murphy

Site Vice President LaSalle County Nuclear Station

2601 North 21st Road

'

Marseilles, IL 61341

Dear Mr. Murphy:

This refers to the inspection conducted by Mr. J. F. Schapker of P's office

!

on September IC through November 24, 1993. The inspection includec. a review of activities authorized for your LaSalle County

'ation, Unit 2.

The focus of this inspection ~was your inservice inspection and other outage activities.

' At the conclusion of the inspection, the findings were discussed with those l

members of your staff identified in the e.iclosed report.

Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures

-

and representative records, interviews with personnel, and observation of activities in progress. The' purpose of the inspection was ' ) determine whether activities authorized by the license were conducted safely and _in

'accordance with NRC requirements.

-

No violations of NRC requirements were identified during the course of this

W:

i n t.pecti on.

ly In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of'

,

V this letter and the enclosed inspection report will be placed in the NRC Public Document Room.

We will gladly discuss any. questions you have concerning this inspection.

)

!

S i ncere,1y,

l' h

1000G7

<

\\" # H. Jacobson, Chief i

'

Materials and Processes Section Enclosure:

Inspection Report

y

_

No. 50-374/93024(DRS)

i

-i

See Attached Distribution

'

931210022E 931206-

8f

C

PDR-ADDCK 05000374 y

G

PDR

f

I

I

')

'

Clb l/ O ? E W

'

__

_

-

._

,

.

-

.

Commonwealth Edison Company

DEC (

1993

Distribution

cc w/ enclosure:

L. O. DelGeorge, Vice President

Nuclear Oversight and

Regulatory Services

J. Schmeltz, Acting Station Manager

J. Lockwood, Regulatory Assurance

Supervisor

,

D. Farrar, Nuclear Regulatory

Services Manager

OC/LFDCB

Resident Inspectors-LeSalle,

Dresden, Quad Cities

Richard Hubbard

J. W. McCaffrey, Chief

Public Utilities Division

Licensing Project Manager, NRR

Robert Newmann, Office of Public

Counsel, State of Illinois Center

State Liaison *'ficer

.

Chairman, Illinois Commerce

Commission

1

.

.

..

.

_ _ _ _ _ _ _ _ _ _ _ _ _ _. _