IR 05000373/1992023

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-373/92-23 & 50-374/92-23
ML20036A322
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/04/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20036A323 List:
References
GL-89-10, NUDOCS 9305110087
Preceding documents:
Download: ML20036A322 (2)


Text

pm Cico U21T E D SVATES f

. fg NUCLEAR REGULATORY COiAM!sslON e

g Q

REGION til

$

';[

799 ROOSEVE LT RO AD D,

&

GLEN ELLYN, ILLINOIS 60127

%,

/

bby 4, 1993 Docket No. 50-373 Docket No. 50-374 Commonwealth Edison Company ATTN: Mr. L. Vice President Nuclear Oversight and Regulatory Services Executive Towers West III 1400 Opus Place, Suite 300 Downers Grove, IL 60515

Dear Mr. DelGeorge:

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORTS N0.

50-373/92023; NO. 50-374/92023))

This will acknowledge receipt of your letters dated February 18, 1993, March 5, 1993, and April 23, 1993, transmitting a Notice of Violation and a request for information associated with Inspection Reports No.

50-373/92023(DRS) and No. 50-374/92023(DRS).

These reports summarized the results of the Generic Letter 89-10 (Safety-Related Motor-Operated Valve Testing and Surveillance) inspection at your LaSalle County Nuclear Station.

We have reviewed your corrective actions, and the requested information, and have no further questions at this time.

The corrective actions will be examined during future inspections.

Sincerely, f/ Unit _

T. O. Martin, Acting Director Division of Reactor Safety See Attached Distribution 9305110087 930504 PDR ADOCK 05000373 G

PDR l

I fu6De-Z60/