January 6, 2003
SUBJECT:
INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES, TEMPORARY INSTRUCTION 2515/148, REVISION 1, INSPECTION REPORT NOS. 50-272/02-011, 50-311/02-011, 50-354/02-008
Dear Mr. Keiser:
On November 21, 2002, the U.S. Nuclear Regulatory Commission (USNRC) completed a special inspection at the Salem/Hope Creek Generating Stations, in accordance with Temporary Instruction 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. The enclosed report documents the inspection findings which were discussed on November 21, 2002, with Mr. Theodore Straub, Manager of Security, and other members of your staff.
This inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations, and with the conditions of your license. The specific purpose of this inspection was to verify that PSEG Nuclear (PSEG)
effectively implemented the interim compensatory measures (ICMs) imposed by the Order Modifying License issued February 25, 2002; and that the ICMs were successfully incorporated into your site physical protection strategy and security program. Additionally, the objective of the inspection was to ensure that relevant procedures were developed and implemented, and that interface agreements with offsite organizations were developed and coordinated, as required. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified. The inspection team verified and confirmed that PSEG had effectively implemented the specifications of the Order Modifying License issued February 25, 2002.
Mr. Harold In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Wayne D. Lanning, Director Division of Reactor Safety Docket Nos.
50-272, 50-311, 50-354 License Nos. DPR-70, DPR-75, NPF-57 Enclosure:
NRC Inspection Report Nos. 50-272/02-011, 50-311/02-011, 50-354/02-008 (CONTAINS (SGI))
cc w/o encl w/o SGI:
M. Friedlander, Director - Business Support J. Carlin, Vice President - Engineering D. Garchow, Vice President - Projects/Licensing G. Salamon, Manager - Licensing R. Kankus, Joint Owner Affairs J. J. Keenan, Esquire Consumer Advocate, Office of Consumer Advocate F. Pompper, Chief of Police and Emergency Management Coordinator M. Wetterhahn, Esquire State of New Jersey State of Delaware N. Cohen, Coordinator - Unplug Salem Campaign E. Gbur, Coordinator - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance