UPDATED INSPECTION PLAN FOR JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - REPORT 05000348/2025005 AND 05000364/2025005
Dear Jamie Coleman:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Joseph M. Farley Nuclear Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ADAMS Accession Number ML25042A278), the NRC determined that a broad, comprehensive review of the ROP is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
As noted in the enclosed inspection plan, in addition to the baseline inspections the NRC will conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, at your facility in August 2026.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
August 27, 2025 Please contact me at 404-997-4415 with any questions you have regarding this letter.
Sincerely, Alan J. Blamey, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000348, 05000364 and 07200042 License Nos. NPF-2 and NPF-8 Enclosure(s):
Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Blamey, Alan on 08/27/25
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DORS RII/DORS NAME A. Blamey A. Alen Arias DATE 08/27/25 08/26/2025
Farley 09/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count FARLEY INITIAL EXAM
1,2 9/7/2025 9/13/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
UNIT 1 IN-SERVICE INSPECTION
1 10/6/2025 10/10/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - FAR
1,2 1/12/2026 1/16/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 2/2/2026 2/6/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing MATERIAL CONTROL AND ACCOUNTING
1,2 6/22/2026 6/26/2026 IP 71130.11 000742 Material Control and Accounting (MC&A)
SECURITY BASELINE INSPECTION
1,2 7/13/2026 7/16/2026 IP 71130.02 000734 Access Control 1,2 7/13/2026 7/16/2026 IP 71130.09 001656 Security Plan Changes 1,2 7/13/2026 7/16/2026 IP 71151 001338 Performance Indicator Verification SNC CORPORATE SECURITY INSPECTION AA/FFD (FAR)
1,2 7/20/2026 7/23/2026 IP 71130.01 000733 Access Authorization 1,2 7/20/2026 7/23/2026 IP 71130.08 000740 Fitness-For-Duty Program EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1,2 8/3/2026 8/7/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/3/2026 8/7/2026 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1,2 8/3/2026 8/7/2026 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (AGE-RELATED)
1,2 8/10/2026 8/14/2026 IP 71111.21N.04 001832 Age-Related Degradation 1,2 8/24/2026 8/28/2026 IP 71111.21N.04 001832 Age-Related Degradation SECURITY BASELINE INSPECTION
1,2 8/17/2026 8/20/2026 IP 71130.01 000733 Access Authorization 1,2 8/17/2026 8/20/2026 IP 71130.08 000740 Fitness-For-Duty Program POST-APPROVAL LICENSE RENEWAL PHASE 4
1,2 8/31/2026 9/4/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal
Site Inspection Activity Plan
FARLEY REQUAL INSPECTION
1,2 9/13/2026 9/19/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance PROBLEM IDENTIFICATION AND RESOLUTION
1,2 9/14/2026 9/18/2026 IP 71152B 000747 Problem Identification and Resolution 1,2 9/28/2026 10/2/2026 IP 71152B 000747 Problem Identification and Resolution UNIT 2 IN-SERVICE INSPECTION +SG
2 10/26/2026 11/6/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1,2 11/2/2026 11/6/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 11/2/2026 11/6/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 11/2/2026 11/6/2026 IP 71124.04 000728 Occupational Dose Assessment 1,2 11/2/2026 11/6/2026 IP 71151 000746 Performance Indicator Verification 1,2 12/7/2026 12/11/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation CYBER SECURITY INSPECTION
1,2 11/30/2026 12/4/2026 IP 71130.10 000741 Cybersecurity UNIT 1 IN-SERVICE INSPECTION +SG
1 4/5/2027 4/16/2027 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
FARLEY INITIAL LICENSING EXAMINATION
1,2 6/6/2027 6/12/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
SECURITY BASELINE INSPECTION - FAR
1,2 6/7/2027 6/10/2027 IP 71130.02 000734 Access Control 1,2 6/7/2027 6/10/2027 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 6/7/2027 6/10/2027 IP 71130.09 001656 Security Plan Changes 1,2 6/7/2027 6/10/2027 IP 71151 001338 Performance Indicator Verification